Loading...
HomeMy WebLinkAboutEmail RE Construction Stormwater NOI Not Accepted - 119980Georgoulias, Bethany From: laserfiche@ncdenr.gov Sent: Wednesday, December 28, 2022 7:39 AM To: landassociatesdevllc@gmail.com Cc: Broussard, Brooklyn C; landassociatesdevllc@gmail.com; fleet@ftempleengineering.com Subject: Construction Stormwater NOI Not Accepted This email is to notify you that your application for Black Forest Pointe was not accepted for the following reason: A7/A8. The provided coordinates do not match the location shown on the uploaded site map or the provided address. Al2. Acres to be disturbed must match approved E&SC documentation. B1. This permittee does not match the permittee that the letter of approval/grading permit is addressed to. B1. Permittee must be actively registered with the N.C. Secretary of State. Verify the business is listed as it is registered. D1. Ensure this date matches the approval/issue date of your E&SC documentation (grading permit/letter of approval). D9. Please ensure the permittee name is listed the same as it is registered. Please submit a new NOI. To auto -populate the new NOI, select'Yes' for the first question & enter NOI number 119980. Contact Brooklyn. Broussard@ncdenr.gov with questions. Thank you. For additional support, please visit our NPDES Stormwater Construction Program website at https://deq.nc.gov/NCG01. The NOI application no. for this project is 119980. This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not monitored.