Attachment L: Low Impact Bridge Replacement Process
Low Impact Bridge Project No.: BD-5112V County LINCOLN
Bridge No. 54-0124 over HOWARDS CREEK
WBS Element Number: 45358.3.22
JGhrt E Skvarl3, Iil
Secretary
This project is subject to the Low Impact Bridge Process as agreed to on October 6, 2009. This project
meets the documentation requirements and approval procedures under NEPA, as defined by FHWA, for
Low Impact Bridge Replacements. This project meets the standards of NCDOT's Minimum Criteria Rules.
Date: 1/21/15
Applicant Name: NC DEPARTMENT OF TRANSPORTATION
Applicant Address: PO BOX 47
1710 E. MARION STREET
SHEIBY. NC 28151
Primary Contact for Project: TRISH BEAM
Phone No.: (704) 480-9044
Is this an after-the-fact application: Yes X No
River Basin: CATAWBA
Stream Classification: C
Regulatary Authorization Options for this Activity
Federal: USACE Nationwide General Permit 3— Maintenance
State: General Water Quaiity Certification #3687
Locai: None
The proposed bridge will be placed on its �xisting alignment. The new bridge structure will be a 3-span,
1@35', 1@55', 1@35' — 21" deep cored slab bridge (OAl = 125' long by 36' wide). There are no wetlands
present within the proposed limits of construction. The placement of riprap bank stabilization under the
proposed bridge, as weli as riprap slope protection for (1) existing and (1) proposed ditch, results in 63
linear feet of permanent stream impacts. An off-site detour will be utilized during"construction. This bridge
is following the Low Impact Bridge Pro�jess established by FHWA, NCDOT, and Regulatory Agencies.
...,., /
.
Signature: � � �'J,9�r'� �,���
r �,
Print Name: TRISH BEAM
Title: DIVSION 12 ENVIRONMENTAL SUPERVISOR
i�rdnsporfatien Peimitting Unit r�re
�iceo Mzii s��i�e cento�� R�ai�n, ^aa,�n c��oim�z�as-�sao IV �xth��tct�il�&
Loratlon�. 2321 CrabYree BNd., Rzleigh, Nodh Carolinz 27604 ��}sp¢p,rgrigj��gy
4'hone:919-733-ASG 1 PAX�. 919-i33�8S3 f✓ ��'� s'�l `'�� �
Infemet: http�.11h2o.enr.staten�.uslncweYlandsl
Attachment G: Low/Minimal Impact
�
C
�
�
_
�
�
�
�
0
_
�
N
s
�
�
�
�
.3
0
0
0
�
�
m
E
�
0
L
>
C
w
N
�
�
w
�
�
�
U
7�
u,00
o t�
N�Y
� TU
�_�
N�
��o
�
N
'�^
v !
(
A
�
..
�
V
W
0
�
�
�
�
0
N
V
.,
�
V
�
�
O
V
See Sheet 9-A Fo� Index of Sheets
See Sheet 9-B Fo� Conventionol Symbols
TO SR 1002
CAT SQUARE RD.
THIS PROJECT IS NOT WITHIN ANY
MUNICIPAL BOUNDARIES
CLEARING ON THIS PROJECT SHALL BE PERFORMED
TO THE LIMITS ESTABLISHED BY MODIFIED METHOD II
�'I�_�"I'I�: (�I� \(�I°'l�H �_� l'�(�I.I \ �
IDI��I�I(�>\ (�I�� I-II��I-I\V� �� "�
LII�COL1� CO U1�T Y
LOCATION: BRIDGE 1110.124 OVER HOWARDS CREEK
0111 SR 1113 (REEPSVILLE RD.)
TYPE OF WORK: GRADING, PAVING, DRAINAGE, AND STRUCTURE
WETLAND AND SURFACE
WATER IMPACTS PERMIT
�
N
O
�
�
0
Z
�
0
�
m
��'1'B
V,`l.o
rrere Pxa.Na
x
BD-5112V
BD-5112V
BD-5112 V
BTATB VR018C1' REPEqBNC6 NQ
BD-5112V
P.A.PROl.NQ
N.A.
N.A.
HX66T TOTAL
No. xeers
�
OPdCRIP110N
PE
CONSTRUCTION
BRIDGE 540124
PERMIT DRAWINGS
SUBMITTAL NUMBER 5-070R2
V3d2015
r�
STEWART
�/��MOFF�TT � NICHOL
�
�
c� °o
Op N
� N
Q N
Z Z
Tp
cqNs �R ��
r.epo.ea tn rae ofh« f FIyDRAULICS ENGINEER
GRAPHIC SCALES DESIGN DATA PROJECT LENGTH STEWART
ADT = 1400 F�, PRELIMINARY PLANS
LENGTH ROADWAY PROJECT BD-5112V = 0.073 mi. no Nar ose POR CONSTRUCCION
50 25 0 30 60 ADT FY = i�VA n�oerx caaocrna �� pg��p�
DEPARTMENT OF TItANSPDXTfITlON
DHV = WA LENGTH STRUCTURE PROJECT BD-5112V = 0.024 mi. zorz sraNDnnn sPECrFrcnzroxs ��`�� �`���
PLANS � %
s
�- p` TOTAL LENGTH PROJECT BD-5112V = 0.097 mi. MATTHEW LUDWIG, PE srcxaruns: P.E. � �
50 25 0 30 60 T= b°�a 'k RIGHT OF WAY DATE: PRO�scr sxcrveER � �
ROADWAY DESIGN ENGINEER � o
* (TTST 3°/a + DUAL 3°/a) �� a
07 /23 /2014 MICHAEL BURNS, EI � r
PROFILE (HORIZONTAL) V= 55 MPH rxo�scr nss.cx ExcrxeEx �'•�p �t.�
CLASS = MINOR LETTING DATE: �� g�����
l0 5 0 6 �2 COLLECTOR
K. ZAK HAMIDI, PE 07 /23 /2013
NCDOT CONTACT: p.E.
PROFILE (VERTICAL) SUBREGIONAL TIER TPMU - DESIGN BUILD GROUP s,cNnrunE:
N
z
0
N
�
�
�
�
3
N
0
�
�
0
�
�
�
�
a
�
NOTES:
lJ Proposed b�idge:1�35':1�55';
1�35': OAL=l25'
Existinq brldge:1�22'-3'; 3�22':
1�22'-3': OAL = ll0'-6'
DETAIL C
RIP RAP AT EMBANKMENT
, No„o ��a�e,
iam�.
o�m, to�mlo. z.
Grade
-NWS•=913.9'
GEOTEXiILE
PERMANENT TEMPORARY ��PeO`�°e. ����a��a°P
STREAM STREAM FROM STA.12 r62.4 TO STA 12 r84.3 -LS-
DETAIL B FROM STA.13+13.1 TO STA. 13+41.2 -L5-
IMPACTS IMPACTS RIP RAP AT EMBANKMENT
O�HO,m 5�oie,
� SITE 1 8 LF 0 LF '°�"°
+ D'i�ch 1.0'min. �,
o SITE 2 45 LF* 47 LF ����`
NW5=913.9'
CLA55 IIftIPRAP
GEOTE%TILE
SITE 3 10 LF 0 LF T„e o,�;�e,- ,5 To„5,«„R;,_Ra,
TOTAL 63 LF 47 LF GeO,eXf1�e- 20i
FROM STA.12+73.2 TO STA.12+88.5 LT -LS-
FROM STA. 73 i� 26.1 TO STA. 13 I- 42.7 RT -L5-
*NOTE: PERMANENT STREAM IMPACTS AREA INCLUDES
IMPACTS FROM PERMANENT BANK STABILIZATION &
TEMPORARY WORK PAD
540124-01
�DENOTES IMPACTS IN
SURFACE WATER
�DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
BEGIN PROJECT �
TIE TO EXISTING
—L5— STA. 10 + 00.00
CLASS II RIPRAP
TO ELEV 925.8'
EST 110 TONS
LAT BASE DITCH
TIE EXISTING DITCH
TO PROPOSED DITCH
SEE DETAIL A
���� �
CLASS II RIPRAP
AT EMBANKMENT
SEE DETAIL B
Q10=0.8 CFS
Vl Q=1 J FTiS
F--����
Q�E� / +32.5
/
F F/ �
/ �
�// � -
F
_ __F _ F� \ �/ / F+30.1 I r T�.
� �� �/
T
lP/
�__�,E�—E-�'__E—�/ PUE PUE
/
�
P(�f� �A
\ 1 �\\�\ � � 1\ � j
� � � � � � � CLASS II RIPRAP
BANK STABILIZATION
EST 160 TONS
EST 190 SY GT
���� � SEE DETAIL C
540124-01 CLASS II RIPRAP
AT EMBANKMENT
SEE DETAIL B
LINE EXISTING DITCH
WITH CLASS 'B' RIPRAP
540124-02 25 TONS
56 SY GEOTEXTILE
540124-03
^I ^
O
O
N
I\
M
A�
0
Q
Z
�'�°� � END PROJECT
TIE TO EXISTING
c�a,ss u RiPR,�,P —L5— STA. 15 + 10.00
BANK STABILIZATION
EST 100 TONS TIE TO EXISTING
EST 120 SY GT FENCE TIE TO EXISTING —
SEE DETAIL C FENCE
INSTALL 151 LF
BARBED WIRE FENCE
REMOVE AND REINSTALL
EXISTING GATE
�CLASS II RIPRAP
ES�T 85�TONS 925.8'
SB F F P�e.
- 62.2 + 78.� /
� F �8�0 �
F
'` \
�
79. F
— F-�-
15" CSP W/2 ELBOW
AND ROD ,��
E �Q10=1J CFS G�
V10 - 4.8 FTiS
GRAU 350 TL-3 TYPE—III
l
II�r'•
BRIDGE 540124
O
h
PROJECT REFERENCE NO. SHEET NO.
BD-5112V PRM1
RNJ SHEET NO.
ROADWAY DESIGN HYDRAUUCS
ENGINEER ENGINEER
PI3ELIMIN�RY PLANS
DO Ndf USE FO CONBTRVCT[ON
rJ .w ��a � _
����MOFFATT 9 NICHOL
T E WA R T s,,,,. _.<,b .ati. „ s,,. ..s9 ..�
PERMIT DRAWINGS
� so
•oo.
� %�°���_
o ��
�� �� ir ,
,o ��
��
�
� P�E / ��
�� �
0�' �
,.,,;�\ ,q a e�
RETAIN � � �
N
TOE PROTECTION
SEE DETAIL D
540124-04
�
�
.S �2,
2j�' 4
,/ii �
FOR —L5— PROFILE SEE SHEET 5
TYPE-III GRAU 350 TL-3
�
� � �
0
� j y---TYPE-III �-5 �' J TYPE-III 1
BEGIN BRIDGE GRAU 350 TL-3
� -LS- STA. 12 + 41.06
AT-1 gEGIN APPROACH SLAB END BRIDGE END APPROACH SLAB
-LS- STA. 13 + 77.14
' -L5- STA. 12 + 30.06 -LS- STA. 13 + 66.14
DETAIL SHOWING PAVEMENT—BRIDGE RELATIONSHIP (N.T.S.)
N
z
0
N
�
�
�
3
N
0
�
�
0
�
�
�
�
a
�
NOTES:
lJ Proposed b�idge:1�35':1�55';
1�35': OAL=l25'
Existinq brldge:1�22'-3'; 3�22':
1�22'-3': OAL = ll0'-6'
DETAIL C
RIP RAP AT EMBANKMENT
, No„o ��a�e,
iam�.
o�m, to�mlo. z.
Grade
-NWS•=913.9'
GEOTEXiILE
PERMANENT TEMPORARY ��PeO`�°e. ����a��a°P
STREAM STREAM FROM STA.12 r62.4 TO STA 12 r84.3 -LS-
DETAIL B FROM STA.13+13.1 TO STA. 13+41.2 -L5-
IMPACTS IMPACTS RIP RAP AT EMBANKMENT
O�HO,m 5�oie,
� SITE 1 8 LF 0 LF '°�"°
+ D'i�ch 1.0'min. �,
o SITE 2 45 LF* 47 LF ����`
NW5=913.9'
CLA55 IIftIPRAP
GEOTE%TILE
SITE 3 10 LF 0 LF T„e o,�;�e,- ,5 To„5,«„R;,_Ra,
TOTAL 63 LF 47 LF GeO,eXf1�e- 20i
FROM STA.12+73.2 TO STA.12+88.5 LT -LS-
FROM STA. 73 i� 26.1 TO STA. 13 I- 42.7 RT -L5-
*NOTE: PERMANENT STREAM IMPACTS AREA INCLUDES
IMPACTS FROM PERMANENT BANK STABILIZATION &
TEMPORARY WORK PAD
540124-01
�DENOTES IMPACTS IN
SURFACE WATER
�DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
BEGIN PROJECT
TIE TO EXISTING
—L5— STA. 10 + 00.00
CLASS II RIPRAP
TO ELEV 925.8'
EST 110 TONS
LAT BASE DITCH
TIE EXISTING DITCH
TO PROPOSED DITCH
SEE DETAIL A
���� �
CLASS II RIPRAP
AT EMBANKMENT
SEE DETAIL B
Q10=0.8 CFS
Vl Q=1 J FTiS
F--����
Q�E� / + 32.5
/
F F/ �
/ —
�// � -
F--- — F F�� \
�(�— �l
�--E�—E E
/ F+30.1
� PUE
PVf
CLASS II RIPRAP �
BANK STABILIZATION
EST 160 TONS
EST 190 SY GT
���� � SEE DETAIL C
540124-01 CLASS II RIPRAP
AT EMBANKMENT
SEE DETAIL B
LINE EXISTING DITCH
WITH CLASS 'B' RIPRAP
540124-02 25 TONS
56 SY GEOTEXTILE
^I ^
O
O
N
I\
M
A�
0
Q
Z
540124-03
�'�°� � END PROJECT
TIE TO EXISTING
c�a,ss u RiPR,�,P —L5— STA. 15 + 10.00
BANK STABILIZATION
EST 100 TONS TIE TO EXISTING
EST 120 SY GT FENCE TIE TO EXISTING —
SEE DETAIL C FENCE
INSTALL 151 LF
BARBED WIRE FENCE
REMOVE AND REINSTALL
EXISTING GATE
�CLASS II RIPRAP
ES�T 85�TONS 925.8'
l
II�r'•
BRIDGE 540124
O
h
PROJECT REFERENCE NO. SHEET NO.
BD-5112V PRM2
RNJ SHEET NO.
ROADWAY DESIGN HYDRAUUCS
ENGINEER ENGINEER
PI3ELIMIN RY PLANS
DO Ndf USE FO CONBTRVCT[ON
rJ .w ��a � _
����MOFFATT 9 NICHOL
T E WA R T s,,,,. _.<,b .ati. „ s,,. ..s9 ..�
PERMIT DRAWINGS
so
•oo.
� I �� // _
o ��
c � ��J� ��
. PVE /
S B F F P�e
+ 78.� � `
b� F � 8�0 � �0�' ��/� /� �;
� � /
�RETAIN �
79
v " F—�}—
15" CSP W/2 ELBOW�
AND ROD �i�,�T
E �Q10=1.7 CFS G�
V10 = 4.8 FTiS
GRAU 350 TL-3 TYPE-III 4,
TOE PROTECTION
SEE DETAIL D
540124-04
�
�
.S �2,
2j�' 4
��.,�
FOR —L5— PROFILE SEE SHEET 5
TYPE-III GRAU 350 TL-3
�
� � �
0
� j y---TYPE-III �-5 �' J TYPE-III 1
BEGIN BRIDGE GRAU 350 TL-3
� -LS- STA. 12 + 41.06
AT-1 gEGIN APPROACH SLAB END BRIDGE END APPROACH SLAB
-LS- STA. 13 + 77.14
' -L5- STA. 12 + 30.06 -LS- STA. 13 + 66.14
DETAIL SHOWING PAVEMENT—BRIDGE RELATIONSHIP (N.T.S.)
;; 940
ii
i i
i i
i i
��
o ;; 930
w
� ��
II
II
�� 920
' ' ' 910
' i i
' i i
��
����
��
II
��
� i i 900
'� I I
' i i
��
� ��
I��
� _�
��
�,
�
3
N
0
�
�
�
E
�
0
w
�
�
w
a
0
BEGIN GRADE
-L5- STA. 10 + 00.00
EL = 939.42'
I�����m����� .
_L� Iilii iiiiiiliiiiii,
TE PO R,ARY VVO RK PAD
_ _
� BEGIN BRIDGE f
�- � -LS- STA. 12 + 41.06
Pl = 11+30.00
EL = 932.92'
VC = 260'
K=55
DS = 37 MPH
KEXIST/N6 4�
SPAN SPAN B PAN
i : 35.0'* 55.0'* 35.0
� :
, :
-, -
��
�• _--� �� i�
���� � • •�� - —
�■■■■■ �■���
iiiiiii■ I.�.•. -
i■■■■■■■■■■ ;•;•; :
.., .
■■� � �■� ■ ��:;:;. :,.
.... ..
;,,•�•o ,•,
:.�j�;. ,,!;
,, � ,.,.::
, . � � '� ��' _.e.:J
:�. 1 � ,r�'�
',�!� � ���
TEMP. WORK PAD
& TEMP.IMPACTS IN SURFACE WATER
TOP ELEVATION = 922.0'
SIDE SLOPES - 1.5:1
NATURAL GROUND
(12/10/2013)
��
;
BENCHMARK 1
8" SPIKE IN 24" WHITE OAK �
N 660220 E 1286167 '�
-L5- STA 12 + 15.11, 82 .04' RT �
ELEV. 929.47'
.
� i i i� i i i i� i i.,• i� i i i i i i i i� i i i� i i i i ..
. . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .... . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . .
12 13 14 15
1 O
�
END BRIDGE
—L5— STA. 13 + 66.14
Pl = 14f40.00
EL = 93/.99'
VC = l30'
K = ll8
DS = 55 MPH
�
//]l.
BRIDGE 540124
i�■■■■■■■■■■■■■■i
END GRADE
—L5— STA. 15 + 10.00
EL = 932.55'
f —J0.3000 °d +J0.8000%
*MEASURED ALONG CHORD �
�TEMP. WORK PAD
& TEMP.IMPACTS IN SURFACE WATER
TOP ELEVATION = 920.8'
SIDE SLOPES — 1.5:1
— N W S E L= 913.9' —r1—;-1—r—rr '_
PROJECT REFERENCE NO. SHEET NO.
BD-5112V PRM3
RNJ SHEET NO.
ROADWAY DESIGN HYDRAUUCS
ENGINEER ENGINEER
PI3ELIMIN RY PLANS
DO Ndf USE FO CONBTRVCT[ON
, ����MOFFATT 9 NICHOL
, .. ., .: .,q,�E:;bwa,.,o. �,:: w;:os.o
T E WA R T s,,,,. _. s„ ..s9 ..�
PERMIT PLANS
BRIDGE HYDRAULIC DAT A
DESIGN DISCHARGE _ 1800 CFS
DESIGN FREQUENCY = 25 YRS
DESIGN HW ELEVATION = 924.8 FT
BASE DISCHARGE fUSGSI = 2500 CFS
BASE FREQUENCY fUSGSI = l00 YRS
BASE HW ELEVATION fUSGSI = 925.44 FT
BASE DISCHARGE fFEMAI = 3232 CFS
BASE FREQUENCY fFEMAJ = l00 YRS
BASE HW ELEVATION fFEMAJ = 925.99 FT
OVERTOPPING DISCHARGE _ 16000 CFS
OVERTOPPING FREQUENCY = � 500 YRS
OVERTOPPING ELEVATION = 932.8 FT
DATE OF SURVEY = 8-7-20/3
w.s. E�EVar�onr
AT DATE OF SURVEY = 9/3.9 FT
11
;; 940
��
��
��
��
��
��
��
��
��
o ;; 930
w
� ��
II
�� 920
' ; ; 910
I�I
II
��
� i i 900
'� I I
'� I I
��
� ��
��
I�
� _�
��
�,
�
3
N
0
�
�
�
E
�
0
�
w
�
�
�
�
w
a
�
. . . . . .. .. � . . .. . .. _.
BEGIN GRADE
-L5- STA. 10 + 00.00
EL = 939.42'
1 O
—
iiii���■ii� -
�.....��...
i■■■■■ ■■■
i■■■■■■■■■■
iiiiii��iii . .. �
. .
�.
_L5_
I
. . . . . . . . . . . . . . . . . . . . . �
SPAN SPAN B PA�
35.0'* 55.0'* 35.i
, ---
•,,, e �--� _ _
i■■■■■
.
i■■■■■■■ I:�.•.
i■■■■■■■■■■ �� - ...
. .,.�...
i■■■■■■■■■■ . . . � :;.-.
i■�■■■■�■■�■■■■■■ !.;.;.
i■■■■■■■■■■■■■■■ • � � � �'�•�,�, ,
i■■■■■■■■■■■■■■■ .
i■■■■■■■■■■ • •p:•: ,:
i■■■■■■■■■■ , , �:.- � . ,_,•
�■■■■■■■■■■ � � �;. �o;�
�■�■■■■�■■� �,�.,� ,..�� :
�■■■■■■■■■■ % :., .- :
i■■■■■■■■■■ • � • '���� � � �' .
i■■■■■■■■■■ � � � � ',' �
i■■■■■■■■■■ � ;
�■■■■■■■■■■ „
i■■■■■■■■■■ ; �
i■■■■■■■■■■ � � �': f
i■■■■■■■■■■ . .
�■■■■■■■■■■ � '� ` C'�� �
�■■■■■■■■■■ , � ►
i■■■■■■■■■■■ ,
�■■■■■■■■■■■■■■■■ : .
�■■■■■■■■■■■■■■■�
� ...............
�■■■■■■■■■■■■■■■■
�■■■■■■■■■■■■■■■ --.- ;, .; . .
�■■■■■■■■■■■■■■■
i■■■■■■■■■■■■■■■ �; � :
11
1 L
13
END BRIDGE
-- - - -- �,
Pl = 14f4n_nn
�
II�r'• 11
BRIDGE 540124
LL — /JL.JJ
� _
• •II � •:III
� � � • • • • � ■■■■■■ ■n
. � .- ■■■■■■■■■■�
iiiiiiiiii
. . � • � : �■■■��■■■■�
� - ■■■■■■■■■■■�
� .,. ..................
-- - ..................
--.- :. .; . � ■■■��■■■■■■��■■■■�
■■■��■■■■■■��■■■■�
�- . ■■■■■■■■■■■■■■■■■�
■■■■■■■■■■■■■■■■■�
■■■■■■■■■■■■■■■■■�
-----------------■
14
PROJECT REFERENCE NO. SHEET NO.
BD-5112V PRM4
RNJ SHEET NO.
ROADWAY DESIGN HYDRAUUCS
ENGINEER ENGINEER
PI3ELIMIN RY PLANS
DO Ndf USE FO CONBTRVCT[ON
, ����MOFFATT 9 NICHOL
. .. ., .: .,q,�E:,'6wa,.,o. �,:: ;;:os.o
T E WA R T s,,,,. _. s„ ..s9 ..�
PERMIT PLANS
BRIDGE HYDRAULIC DAT A
�SIGN DISCHARGE _ 1800 CFS
�SIGN FREQUENCY = 25 YRS
�SIGN HW ELEVATION = 924.8 FT
�SE DISCHARGE fUSGSI = 2500 CFS
�SE FREQUENCY fUSGSI = l00 YRS
�SE HW ELEVATION fUSGSI = 925.44 FT
�SE DISCHARGE fFEMAI = 3232 CFS
�SE FREQUENCY fFEMAJ = l00 YRS
�SE HW ELEVATION fFEMAJ = 925.99 FT
ERTOPPING DISCHARGE _ 16000 CFS
ERTOPPING FREQUENCY = � 500 YRS
ERTOPPING ELEVATION = 932.8 FT
TE OF SURVEY = 8-7-20/3
>. ELEVATION
DATE OF SURVEY = 9/3.9 FT
15
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size/Type Wetlands Wetlands Wetlands inWetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (tt) (tt)
1 12+88 LT to 12+94 LT Riprap bank stabilization <0.01 8
2 12+g4.3 to 13+13.1 Riprap stabilization/ 0.02 0.02 45 47
Temporary Workpad
3 13+20 RT to 13+28 RT Riprap bank stabilization <0.01 10
TOTALS: 0.02 0.02 63 47