Loading...
HomeMy WebLinkAboutNCC224172_ESC Approval Submitted_20221221GASTON COUNTY Gaston Natural Resources Department Gaston County Soil Erosion & Sedimentation Control Program o� ooUNT� m p h .184 //4 —J� GAS ON COUNTY Natural Resources Gaston Natural Resources Department 1303 Dallas-Cherryville Hwy Dallas, NC 28034 Office: (704) 922-4181 www.gastongov.com/d epartments/natural re sources Gaston County Belmont Bessemer City Cherryville Cramerton Dallas Gastonia High Shoals Lowell McAdenville Mount Holly Ranlo Stanley Purpose Statement: "To serve the people of Gaston County by protecting and improving their soil, water, air, plant and wildlife resources through conservation planning, engineering, education, and regulatory programs." Soil Erosion & Sedimentation Control RE: Letter Of Approval With Modifications Date: 11 /09/2022 Project Name Kamdar Industries Warehouse Expansion Permit #: Ec-22-10-05-00023 Responsible Person Masood Kamdar Address 3500 Old York RD City, State, Zip Gastonia, NC 28056 Location Old York RD Submitted By Riyad Baroudi Date Received:10/12/2022 1 171 New Submittal Revision Watershed I Crowders Creek Disturbed Acreage:3.07 ATTN: Masood Kamdar The Erosion and Sedimentation Control Plan submitted for the above project has been reviewed and is approved with modifications as listed on the next page. This approval is conditioned upon the incorporation or addition of these modifications to the Plan. If these modifications are not included in the plan and implemented on the construction site, the site will be in violation of the Gaston County Soil Erosion and Sedimentation Control Ordinance (Section 18 (k) and the Sedimentation Pollution Control Act of 1973. (G.S. 113A-61.1(c))). Please be advised that the Ordinance (Section 18 (c) and Tale 15 NCAC 04B.0127(b) requires that a copy of the approved Soil Erosion & Sedimentatioin Control Plan be on file at the job site. This letter is also Notice required by the Ordinance (Section 21) and G.S. 113A-61.1 of our right of periodic inspection to insure compliance with the approved plan. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In additionm, local city or county ordinaces or rules may also apply to this land -disturbing activity. This approval does not supercede any other permit or approval. After commencement of this project, if it is determined that the Soil Erosion & Sedimentation Control Plan is inadequate to meet the regirements of the Ordinance (Section 18 (c)(f) and G.S. 113A-51 through 66), this office may require revisions to the Plan and implementation of the revisions to insure compliance. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form which you have provided. You are requested to file an amended form if there are any changes in the information included on the form. Please notify our office (704-922-4181) at least 48 hours before commencement of the land -disturbing activity. (Ordinance Section 8 (e). Sincerely, Jonathan Boerger NATURAL COUNTY RESOURCES DEPARTMENT Gastc,i County Erosion & Sedimentation Control Program Pagel Page 2 Gaston County Soil Erosion & Sedimentation Control Program o� cou1v�� 6 fl 28460 G' 4 GAS ON COUNTY Natural Resources Gaston Natural Resources Department 1303 Dallas-Cherryville Hwy Dallas, NC 28034 Office: (704) 922-4181 www.gastongov.com/d epartments/natural re sources Gaston County Belmont Bessemer City Cherryville Cramerton Dallas Gastonia High Shoals Lowell McAdenville Mount Holly Ranlo Stanley Purpose Statement: "To serve the people of Gaston County by protecting and improving their soil, water, air, plant and wildlife resources through conservation planning, engineering, education, and regulatory programs." Soil Erosion & Sedimentation Control Plan Review Reasons for Approval with Modifications (1) Ensure diversion ditches outlet through three rows of baffles and that the basin emergency spillway is provided in both SE&SC phases. (2) SE&SC measures will be needed for sanitary sewer tie-in; coordinate with this office and FOR prior to work in this area. (3) Additional measures may be needed at site entrance as site moves to phase 2 SE≻ coordinate with EOR. 1303 Dallas-Cherryville Highway, Dallas, NC28034 Citizens Resource Center Telephone: 704-922-4181