Loading...
HomeMy WebLinkAboutSW6221203_Supplement-EZ Form_20221220DocuSign Envelope ID: 239901 C5-5F16-4AF2-9C75-8A6F24EEB3C3 SUPPLEMENT—EZ COVER PAGE FORMS LOADED FORMATION t Name Coastal Wetland Area (ac) Surface Water Area (ac) Is this project High or Low Density? Does this proiect use an off -site SCM? Briarwood Park Low No MPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet N/A 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback does it meet NCAC 02H.1003 4 c-d ? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: W9 Fir 11 1 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale Dry Pond 0 22 0 23 Storm Filter 0 0 24 Silva Cell Ba filter Filterra 25 0 26 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Mike Zaccardo PE 28 Organization: Timmons Group 29 Street address: 5410 Trinity Road Suite 102 30 City, State, Zip: Raleigh, NC 27607 31 Phone numbers : 919-532-3281 32 Email: mike.zaccardo@timmons.com Certification Statement: I certify, under penalty of lawthat this Supplement-EZ form and all supporting information were prepared under my direction or supervision, that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Deslgrner 1 1 1 1 1 2ADFFAl O ` �'000 ,we FNGINEE� Q` ` ��V. ii�P`%%% Seal DocuSigned by: OD42ADFFAEBB46B... Signature of Designer 11/9/2022 Date DocuSign Envelope ID: 239901 C5-5F16-4AF2-9C75-8A6F24EEB3C3 DRAINAGE AREAS 1 Is this a high density project? No 2 If so, number of drainage areas/SCMs 0 3 Does this project have low density areas? Yes 4 If so, number of low density drainage areas 1 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED INFORMATION 4 TypeM I7Onsite Entire Site N/A LD 1 5 drainage area s ft 7.89 6 a a area s ft 7.89 7 a a area s ft 0 8 n project (sq ft 52365 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft 30400 sf 10permitting) New BUA not on subdivided lots (subject to s 21965 sf 11 Offsite BUA (sq ft N/A 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft Sidewalk (sq ft 1000 sf sf Roof (sq ft sf Roadwa (sq ft 20965 sf Future (sq ft sf Other, please specify in the comment box below (sq ft N/A 13 New infiltrating permeable pavement on subdivided lots (sq ft N/A 14 New infiltrating permeable pavement not on subdivided lots (sq ft N/A 15permitting) Existing BUA that will remain (not subject to s ft N/A 16 Existing BUA that is already permitted (sq ft N/A 17 Existing BUA that will be removed (sq ft N/A 18 Percent BUA 15% 19 Desi n storm inches N/A 20 Design volume of SCM cu ft N/A 21 Calculation method for design volume N/A INFORMATIONuse this space to provide any additional information about the "22drainagearea(s): Full site is considered as one drainage area. DocuSign Envelope ID: 239901 C5-5F16-4AF2-9C75-8A6F24EEB3C3 LOW DENSITY DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 02H .1003 1 Is project below density thresholds set forth in the applicable stormwater rule? Yes 2 Does project maximize dispersed flow and minimize channelization of flow? Yes 3 Has the use of piping been minimized per.1003(2)(c)? Yes 4 Side slopes of the vegetated conveyances (H:V) 31 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 3.07 6 Are curb outlet swales proposed? No 7 Maximum longitudinal slope of curb outlet swale(s) (%) 8 Bottom width of curb outlet swale(s) (feet) 9 Maximum side slope of curb outlet swale(s) (H:V) 10 Minimum length of curb outlet swale(s) (feet) 11 Are treatment swales used instead of curb outlet swales? 12 Is stormwater released at the edge of the setback as dispersed flow? N/A 13 Have stormwater outlets been designed to prevent downslope erosion? Yes 14 lAre variations to rule .1003 proposed? No ADDITIONAL INFORMATION 15 1 Please use this space to provide any additional information about this low density project: Stormwater runoff will be captured in roadside swales which outlet at the end of the culdesac into scour holes. Swale # Drainage Area ac BUA (ac) Pervious area ac C Q (cfs) Slope ( % ) Va„ow (fps) Va ua , (fps) Flow depth (ft) 1 1.77 0.70 1.07 0.50 6.95 1.90 5.00 3.07 0.87 2 0.59 0.55 0.04 0.50 2.31 1.90 5.00 2.16 0.58 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30