Loading...
HomeMy WebLinkAboutSW6110103_Stormwater Report_20221220CUI JSOC - Microgrid Project number: 60652522 Attachment D — Hydrology Report AECOM CUI JSOC - Microgrid Project number: 60652522 ATTACHMENT D — Table of Contents 1. Stormwater Worksheets....................................................................................... 2 2. NCDEQ - BUA Figures and Worksheets............................................................... 6 3. EISA Section 438 Army LID Planning and Cost Tool Report ............................... 15 4. Hydraflow Hydrographs Output - Summary Reports .......................................... 17 5. Hydraflow Hydrographs Output - 10-Year Hydrograph and Routing Reports ..... 27 6. NOAAAtlas-14 Rainfall Data.............................................................................. 47 7. Bioretention Underdrain Calculations................................................................. 50 8. Bioretention SCM - Outlet Control Structure Weir and Orifice Flow Data ........... 54 9. Erosion & Sediment Control - Outlet Protection Calculations ............................. 60 AECOM cul Stormwater Worksheets cul PN97470 - Page 2 of 64 cul JSOC Microgrid Installand and Integration Project: 60652522 Date: 30 SEP 2022 Design By: ACF Checked By: Pre -Development Drainage Areas A=COM READY -TO -ADVERTISE NRCS (HSG "A" SOILS) RATIONAL AREA A.0 Area, A (ac.) CN CN x A 55% 14% 0% 30.3% Imp. CNw = 52 C C x A Cw = 0.32 Wooded 0.338 30 10.1 0.05 0.0169 Grassed 0.088 39 3.4 0.15 0.0132 #57 stone, 6 inches 0.000 46 0.0 0.20 0.0000 Impervious 0.186 98 18.2 0.90 0.1670 Subtotal 0.612 31.8 0.1971 AREA B.0 Area, A (ac.) CN CN x A 0% 15% 0% 85.1% Imp. CNw = 89 C C x A Cw = 0.79 Wooded 0.000 30 0.0 0.05 0.0000 Grassed 0.047 39 1.8 0.15 0.0070 #57 stone, 6 inches 0.000 46 0.0 0.20 0.0000 Impervious 0.265 98 26.0 1 0.90 0.2389 Subtotal 0.312 27.8 0.2459 TOTAL PRE -DEVELOPED SITES 1 0.9241 1 59.60 1 CNw = 65 1 1 0.44 1 Cw = 0.48 JSOC_SWM_WORKSHEETS.xlsx, PreDev DAs - 9/29/20221 5:05 PM 1 of 6 cul PN97470 - Page 3 of 64 cul JSOC Microgrid Installand and Integration Project: 60652522 Date: 30 SEP 2022 Design By: ACF Checked By: Post -Development Drainage Areas A=COM READY -TO -ADVERTISE NRCS (HSG "A" SOILS) RATIONAL AREA A.1 (to CONTAINMENT with overflow to SCM) Area, A (ac.) CN CN x A 0% 6% 1% 93.3% Imp. CNw = 94 C C x A Cw = 0.85 Wooded 0.000 30 0.0 0.05 0.0000 Grassed 0.012 39 0.5 0.15 0.0018 #57 stone, 6 inches 0.002 46 0.1 0.20 0.0004 Impervious 0.195 98 19.1 0.90 0.1754 Subtotal 0.209 19.7 0.1776 AREA A.2 (to SCM - BIORETENTION) Area, A (ac.) CN CN x A 0% 1 30% 0% 61.7% Imp. 8.7% CNw = 81 C C x A Cw = 0.69 Wooded 0.000 30 0.0 0.05 0.0000 Grassed 0.099 39 3.9 0.15 0.0148 #57 stone, 6 inches 0.000 46 0.0 0.20 0.0000 Impervious 0.206 98 20.2 0.90 0.1855 Bioretention SCM 0.029 100 2.9 1.00 0.0290 Subtotal 0.334 27.0 0.2293 AREA A.3 (to offsite, uncontrolled) Area, A (ac.) CN CN x A 0% 0% 0% 100.0% Imp. CNw = 98 C C x A Cw = 0.90 Wooded 0.000 30 0.0 0.05 0.0000 Grassed 0.000 39 0.0 0.15 0.0000 #57 stone, 6 inches 0.000 46 0.0 0.20 0.0000 Impervious 0.069 98 6.8 0.90 0.0621 Subtotal 0.069 6.8 0.0621 AREA B.0 (to offsite, uncontrolled) Area, A (ac.) CN CN x A 0% 2% 38% 60.2% Imp.0.1691 CNw = 770.1936 C C x A Cw = 0.62 Wooded 0.000 30 0.0 0.05 0.0000 Grassed 0.007 39 0.3 0.15 0.0010 #57 stone, 6 inches 0.117 46 5.4 0.0235 Impervious 0.188 98 18.4 LO.2O Subtotal 0.312 24.1 TOTAL - AREA A.0 1 0.6121 1 53.37 1 CNw = 87 1 1 0.47 1 Cw = 0.77 TOTAL - AREA B.0 1 0.3121 1 24.08 1 CNw = 77 1 1 0.19 1 Cw = 0.62 TOTAL POST -DEVELOPED SITES 1 0.9241 1 77.46 1 CNw = 84 1 1 0.66 1 Cw = 0.72 JSOC_SWM_WORKS HEETS.xlsx, PostDev DAs - 9/29/20221 5:05 PM 2of6 cul PN97470 - Page 4 of 64 cul JSOC Microgrid Installand and Integration Project: 60652522 Date: 30 SEP 2022 Design By: ACF Checked By: Peak Runoff Rate Comparison A B C D E F G H J K L M A=COM READY -TO -ADVERTISE SITE 1 Peak Runoff Rate (cfs) 95th 1- ear 2-year 10- ear 1 00-ear Pre -Developed 0.00 0.02 0.18 1.02 2.91 Post -Developed 0.18 0.32 0.38 2.13 6.05 Runoff Difference (cfs) [B -A] 1 0.18 0.30 0.20 1.11 3.14 Runoff Difference (%) C / A -- 1500% 111% 109% 108% SITE 2 Peak Runoff Rate (cfs) 95th 1- ear 2-year 10- ear 1 00-ear Pre -Developed 0.50 1.10 1.41 2.26 3.57 Post -Developed 0.18 0.65 0.92 1.71 3.03 Runoff Difference (cfs) [F - E] 1 -0.32 -0.45 -0.49 -0.55 -0.54 Runoff Difference % G / E -64% -41% -35% -24% -15% SITES 1 & 2 Peak Runoff Rate (cfs) 95th 1- ear 2-year 10- ear 1 00-ear Pre -Developed 0.50 1.10 1.55 3.26 6.45 Post -Developed 0.36 0.96 1.30 3.22 8.97 Runoff Difference (cfs) [K - J] 1 -0.14 -0.14 -0.25 -0.04 2.52 Runoff Difference % L / J -28% -13% -16% -1.2% 39% Drainage Area and 10-Year Runoff Comparison N P Q R Value Overall Drainage Areas (acres) 45.5 Site Development Drainage Areas acres 0.92 Site vs. Overall % of Area N / P 2.02% Site vs. Overall (% of 10-year Runoff) [M10YR X Ql -0.02% (based on proportional area) approximate % change in 10-year peak rate, JSOC_SWM_WORKSHEETS.xlsx, Peak Rate Comparisons - 9/30/2022, 10:55 AM 1of1 cul PN97470 - Page 5 of 64 cul NCDEQ — BUA Figures and Worksheets cul PN97470 - Page 6 of 64 CUI ' E2 OVERALL ® EXISTING CULVER / DRAINAGE AREA 30" RCP @ 2.2% kP° cH�NG / I A = 45.5 c. O -� "O < EXISTING DITCH _ r�1 M. . ALONG RAILROAD \ Y � PROJECT AREA 3.57 ACRES gU ) �: OVERALL PROJECT AREA 1 " = 1000' -� ✓ \ � J \ BUILDING FIGURE 2 PROJECT AREA = LIMIT OF WORK = 155,722 SF (3.58 ACRES) EXISTING UNDERGROUND SWM INFILTRATION TRENCH PERMIT #SW6110103 \ 3-1549 o w c� LL ca \ m \ � o � C) Q � o INV = 243.0 o z Zm •• ' \ z L \ Di_ M J W \ •r poi ) o J J N VN / J\\ U roDO NV = 241 RpL EXISTING CULVERT 30" RCP @ 2.2% I JN 100' 50' 0 100, 200' Ll L ,5 L� DEVELOPMENT AREAS - SITE 1 & SITE 2 1"=100' 1000' 500' 0 1000, 2000' E° 1 " = 100' 1 "=1000' JLL 0 i LL Zw z� as tU Lu z 02 a O J J J LU a> �w wo OLu CUI PN97470 - Page 7 of 64 cUl [FO - EAR DESIGN] AREA A.3 (EXISTING TO OFFSITE) 3,006 SF (0.069 ac.) tv [FOR 10-YEAR DESIGN] AREA A.1 (TO CONTAINMENT) 9,097 SF (0.209 ac.) 8,487 SF IMPERVIOUS - n.qa� I 11 SITE 1 DEVELOPMENT LEGEND FOR DETERMINATION OF "DEVELOPMENT' AND "BUILT -UPON AREA" (BUA) 13,360 SF DEVELOPMENT: NEW IMPERVIOUS LLA (ADDITIONAL BUA) - 1,023 SF a EXISTING DEVELOPMENT: REMOVE IMPERVIOUS (SUBTRACTIVE BUA) (7,112 SF) 0 SF EXISTING DEVELOPMENT: ON EXISTING IMPERVIOUS (NO CHANGE IN BUA- NOT INCLUDED) 12,337 SF = EFFECTIVE BUA @ SITE 1 SITE 1 AREA = 26,654 SF (0.61 AC.) SITE 1 DENSITY = 46% [FOR 10-YEAR DESIGN] AREA A.2 (TO SCM) 14,550 SF (0.334 ac.) 8,980 SF IMPERVIOUS 1,262 SF BIORETENTION SCM [FOR 10-YEAR DESIGN] u TOTAL AREA A.0 (TO BMP FOR 10-YEAR) 23,647 SF (0.543 ac.) •••' \17,467 SF IMPERVIOUS S\�E 1 •••''••• ••• Ski ry9. ................ •• •• • • f I J / EXISTING UNDERGROUND SWM INFILTRATION TRENCH Nl— L PERMIT #SW6110103 PROJECT AREA 1,821 SF OF NEW BUA CONTRIBUTES TO THE EXISTING UNDERGROUND \ = LIMIT WORK INFILTRATION TRENCH (PERMIT \ 155,722 SF (3.58 AI #SW6110103) z7v\ / 7 �_ ---3 \ \ \ BUILDING 3-1549 MATCHLINE - SEE FIGURE 3 FOR CONTINUATION DEVELOPMENT AREA - SITE 1 50' 25' 0 50' 100, ill = 50' 1 "=50' N 0 i LL w coI a aW Lua az Lu d J o 5 co Lu W 0 o 0 o U Z LL Z N O�(DN N N m Lu 2) Z ip a) z az�N z V N O ~ N QO 0 c0 J V Z CD O 0 JO �z°_ �" p uj �Q U d 5 Q CUI PN97470 - Page 8 of 64 cul _ __MATCHLINE - SEE FIGURE 2 FOR CONTINUATION_ � BUILDING \ \ \ \ 3-1549 11821 SF OF NEW BUA CONTRIBUTES PROJECT AREA \ \ \ \ TO THE EXISTING UNDERGROUND = LIMIT OF WORK INFILTRATION TRENCH = 155,722 SF (3.58 ACRES) \ \ (PERMIT #SW6110103, \ SEE FIGURE 2 FOR LOCATION) \ \ 1 07 ti INV=241.6' J 3 o EXISTING CULVERT � 30" RCP @ 2.2% xFINV = 243.0 %pk# [FOR 10-YEAR DESIGN] �<< AREA B.0 (TO OFFSITE) 1 13,595 SF (0.312 ac.) ••�,•' 8,186 SF IMPERVIOUS 94 MNG ONL`( z SITE 2 DEVELOPMENT LEGEND FOR DETERMINATION OF "DEVELOPMENT' AND "BUILT -UPON AREA" (BUA) 1,821 SF DEVELOPMENT: NEW IMPERVIOUS LLJ (ADDITIONAL BUA) -5,117 SF EXISTING DEVELOPMENT: REMOVE IMPERVIOUS (SUBTRACTIVE BUA) (6,365 SF) 0 SF EXISTING DEVELOPMENT: ON EXISTING IMPERVIOUS El (NO CHANGE IN BUA- NOT INCLUDED) -3,296 SF = EFFECTIVE BUA @ SITE 2 SITE 2 AREA = 13,408 SF (0.31 AC.) SITE 2 DENSITY = -25% YN 16 NEIDEVELOPMENT AREA - SITE 2 6 .J .w1 1" = 50' �- TOTAL SITE DEVELOPMENT + bUA = I �),l25l 5r (Sl I t I & 11) - BUA = 6,140 SF (SITE 1 & 2) EFFECTIVE BUA = 9,041 SF (0.21 ac.) TOTAL SITE DEVELOPMENT AREA = 40,062 SF (0.92 ac.) DENSITY = 23% M 0 i LL N Lu aLU Lua az Lu 2 Fi a_j 05 Lu 00 Lu 0 co O O U z z N ONC�N U � N m a CD co QLL Oco z H a z U N z v CV O ~Ll) N Q oo(p _j co ticl) o 0 J_ O �z�� O w� U O FQ U �aU)Q cut PN97470 - Page 9 of 64 cul JSOC Microgrid Installand and Integration Project: 60652522 Date: 30 SEP 2022 Design By: ACF Checked By: SITE 1 - NCDEQ Built Upon Area (BUA) Comparison A=COM READY -TO -ADVERTISE Additional BUA (1) sf Subtractive BUA (�) (sf) Not Included BUA(') (sf) SITE 1 - CONTAINMENT AREA A.1 New Development 7,320 -- -- Existing Development -- 0 1,166 Effective BUA (CONTAINMENT AREA) 7,320 -- SITE 1 - NON -CONTAINMENT AREA A.2 New Development 5,570 -- -- Existing Development -- 1,023 3,410 Effective BUA NON -CONTAINMENT AREA 4,547 -- SITE 1 - OFFSITE AREA A.3 New Development 470 -- -- Existinq Development -- 0 2,536 Effective BUA (OFFSITE AREA) 470 -- SITE 1 - COMBINED A.0 New Development 13,360 -- -- Existing Development -- 1,023 7112 SITE 1 - Effective BUA (COMBINED) 12,337 -- SITE 1 AREA 26,654 DENSITY = 46% 0.61 acres SUMMARY: The bioretention SCM is sized to provide the required treatment of the 1-inch storm for the containment and non -containment drainage areas. Refer to the Treatement Worksheet for additional (1) Additional BUA = new impervious (2) Subtractive BUA = removed existing impervious (3) Not Included BUA = no changes to impervious (4) Effective BUA = additional -subtractive; this value is used to determine development BUA for SCM sizing. JSOC_SWM_WORKS HEETS.xlsx, BUA Comparisons - 10/10/202212:02 PM 1 of 3 cul PN97470 - Page 10 of 64 cul JSOC Microgrid Installand and Integration Project: 60652522 Date: 30 SEP 2022 Design By: ACF Checked By: SITE 2 - NCDEQ BUA Comparison A=COM READY -TO -ADVERTISE Additional BUA (1) sf Subtractive BUA (�) (sf) Not Included BUA(') (sf) SITE 2 B.0 New Development 1,821 -- -- Existing Development -- 5,117 6,365 SITE 2 - Effective BUA -3,296 -- SITE 2 AREA 13,408 DENSITY = -25% 0.31 acres SUMMARY: New development BUA contributes 152 cf of treatment runoff (1821 sf x 1/12) to an existing underground stormwater SCM, which is located to the east of Building 3-1549 (Permit #SW6110103). Based on as -built information, the original design required 4,750 cf of treatment and provided 6,842 cf - resulting in a treatment volume surplus of 2,092 cf - more than 13 times what is needed for the additional BUA within Site 2. Therefore, the existing SCM has sufficient treatment capacity to accommodate the new development at Site 2. SITE 1 & 2 COMBINED - NCDEQ BUA Comparison Additional BUA (1) sf Subtractive BUA (�) (sf) Not Included BUA (3) (sf) New Development 15,181 -- -- Existin Development -- 6,146 13,477 SITE 1 & 2 - Effective BUA (COMBINED) 9,041 1 -- TOTAL SITE DEVELOPMENT AREA 40,062 DENSITY = 23% 0.92 acres SUMMARY: SITE 1: Site 1 will provide treatment for 12,337 sf of BUA using a bioretention SCM. SITE 2: There is an overall decrease in BUA at Site 2. However, 1,821 sf of BUA will contribute to an existing underground infiltration SCM and modify "Drainage Area 1" that was previously permitted. The additional BUA at Site 2 will be treated using the excess treatment capacity in the existing underground SCM. JSOC_SWM_WORKS HEETS.xlsx, BUA Comparisons - 10/10/202212:02 PM 2of3 cul PN97470 - Page 11 of 64 cul JSOC Microgrid Installand and Integration Project: 60652522 Date: 30 SEP 2022 Design By: ACF Checked By: Existing SW Permit No. 6110103 Total Project Area 2.49 ac. 108,464 sf Project Percent of Impervious Area 61% Total Impervious Area(previously permitted) 1.52 ac. 66,163 sf SW Permit No. 6110103 (MODIFICATION Summary) TOTAL PROJECT AREA A=COM READY -TO -ADVERTISE Project Area (previously permitted) 2.49 ac. 108,464 sf Additional Project Area from Site 1 0.61 ac. 26,654 sf Total Project Area (MODIFICATION) 3.10 ac. ( 135,118 sf) IDrainaae Area #1 (weviousiv permitted) i otai uraina e Area i.y5 ac. bt),000 st Permitted BUA 1.34 ac. 58,400 sf Impervious Area 69% Drainage Area #1 MODIFICATION Total Drainage Area 1.95 ac. 85,000 sf Permitted BUA 1.34 ac. 58,400 sf Proposed BUA added from within Site 2 0.04 ac. 1 821 sf Total BUA (MODIFICATION) 1.38 ac. ( 60,221 sf) Impervious Area MODIFICATION 71% Drainage Area #2 from Site 1 -MODIFICATION) Total Drainage Area 0.61 ac. 26,654 sf Proposed BUA 0.31 ac. 13,360 sf Existing Impervious removed 0.02 ac. 1 023 sf Total BUA 0.28 ac. ( 12,337 sf) Impervious Area 46% JSOC_SWM_WORKS HEETS.xlsx, BUA Comparisons - 10/10/202212:02 PM 3of3 cul PN97470 - Page 12 of 64 cul A=COM 10 South Jefferson Street, Suite 1600 Roanoke, Virginia 24011 Civil Calculation Sheet JSOC - Microgrid Fort Bragg, North Carolina Job No.: 60652522 Designed By: Bobby B. / A. Freeland Checked By: Date: 30 SEP 2022 Subject: Treatment Volume (Required) -- Stormwater Control Measure Volume (Provided) Job Title: JSOC Microgrid; Fort Bragg NC Rev. No.: READY -TO -ADVERTISE TREATMENT VOLUME SITE #1 (Added to existing permit as "Drainage Area 2") Values: BUA (Impervious Area) = 12,337 sq. ft. = 0.28 acres Treatment Depth = 1.00 inches (NCDEQ treatment storm) Treatment Volume (minimum) = 1,028 cu. ft. Required Treatment Volume, Provided = Approximately I Notes: 1,525 cu. ft. 1.5 times more volume than required (1) The provided treatment volume is taken at the 264.5 contour area for a depth of 12 inches. The minimum filter media area at contour elevation of 264.0 is 1,260 square feet. (2) The containment tank provides 1,600 cubic feet of storage, which is held and drained later to the bioretention SCM during dry periods. (3) The required treatment volume is based only on development at Site 1. Any reduction to development (impervious area) within Site 2 are excluded. TREATMENT VOLUME SITE #2 (Added to "Drainage Area 1" of existing permit) Values: BUA (Impervious Area) = 1,821 sq. ft. = 0.04 acres Treatment Depth = 1.00 inches (NCDEQ treatment storm) Treatment Volume (minimum) = 152 cu. ft. Required Treatment Volume, Provided = Approximately I Notes: 2,,0 2 cu. ft. 13.8 times more volume than required (1) The treatment volume is provided by the surplus treatment capacity of the existing underground infiltration SCM. The original design required 4,750 cf of treatment and provided 6,842 cf - resulting in a treatment volume surplus of 2,092 cf.. (Other documents state 6,991 cf is the provided volume) JSOC-NCDEQ Treatment Worksheet.xlsx cul Print Date: 9/29/2022 PN97470 - Page 13 of 64 CUI A=COM 10 South Jefferson Street, Suite 1600 Roanoke, Virginia 24011 Civil Calculation Sheet JSOC - Microgrid Fort Bragg, North Carolina AECOM Job No.: 60652522 Designed By: A. Freeland Checked By: B. Fisher Subject: Bioretention - Infiltration Drawdown Check Date:10 Oct 2022 Page No.: 1 Job Title: JSOC - Microgrid Installation and Integration Rev. No.: INFILTRATION DRAWDOWN CALCULATION r: immmum aurrace Nrea ror are irrrurrarrvrr 7ysrem SA = FS* ay * 12 K * T where- SA = required minimum surface area of infiltration system (ft2) FS = factor of safety (minimum of 2 is recommended) OV = design volume (W) K = hydraulic conductivity of soil (irVhr) T = maximum dewatering time (72 hours) Soil Infiltration (Ksat) Test Result ID in/hr ft/hr B-2 46.77 3.90 Elevation @Test Location SHWT = Seasonal High Water Table Bioretention Infiltration Maximum Ponded Depth 12.0 inches Time to Drain - Average Test Rate 0.26 hrs Maximum Allowed Drain Time 72 hrs Bottom Elevation 260.0 feet Ground Elevation 268.2 feet SHWT Depth 13.0 feet SHWT Elevation 255.2 feet Separation, Design (between Bottom and SHWT) 4.8 feet Separation, Minimum Required 2.0 feet Separation (design) > Separation (min) --> okay Using NCDEQ Equation 2 (above) ... FS = 2.0 DV = 1525 cu. Ft. (minimum treatment volume, provided) K = 0.5 in/hr (use conservative minimum rate) T = 72 hours SA (min) = 1017 sq. ft. (minimum surface area, calculated) SA (design) = 1260 sq. ft. (minimum surface area, provided) SA (design) > SA (min) --> okay JSOC_NCDEQ Drawdown Worksheet.xlsx CUI Print Date: 10/10/2022 PN97470 - Page 14 of 64 cul EISA Section 438 Army LID Planning and Cost Tool Report cul PN97470 - Page 15 of 64 cul Army LID Planning and Cost Tool Report PROJECT INFO Date 8 / 30 / 2022 Army Command IMCOM Army Installation Fort Bragg Project name 60652522 - JSOC (SITE #1) Project description Site # 1 (0.61 acres) User Name Master Planner Structural BMP Bioretention: Swale: Permeable Pavement: Rainwater Harvesting: Green Roof: Infiltration Practice: IPC/ACF SITE INFO AND EISA VOLUME REQUIREMENT Project limit of disturbance (ac) 0.61 95% rainfall depth (in) 1.8 Soil type Sandy Hydrologic Soil Group (HSG) A Pre -project curve number (CN) 52 Post -project curve number (CN) 87 Pre -project runoff volume (cf) 0 Post -project runoff volume (cf) 1666 EISA Section 438 retention volume 1666 requirement (cf) LID PLANNING SUMMARY Surface area Runoff volume Non-structural BMP Surface (sf) retained (cf) area (ac) 1260 1506 Veg. Filter Strip (Slope >2%, Short Grass): 0.00 0 Veg. Filter Strip (Slope >2%, Tall Grass): 0.00 0 Veg. Filter Strip (Slope G2%, Short Grass): 0.00 9097 1195 Veg. Filter Strip (Slope G2%, Tall Grass): 0.00 0 Reforestation (Trees - Short Grass): 0.00 0 Reforestation (Trees - Shrubs and Tall Grass): 0.00 Total retention volume provided by BMPs (cf): 2701 Project complies with EISA Section 438. LID COST SUMMARY cui PN97470 - Page 16 of 64 cul Hydraflow Hydrographs Output Summary Reports cul PN97470 - Page 17 of 64 cul Hydraflow Table of Contents JSOC_SWM_Sites_RTA.gpw Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Friday, 09 / 30 / 2022 Watershed Model Schematic...................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 -Year SummaryReport......................................................................................................................... 3 2 - Year SummaryReport......................................................................................................................... 4 3 - Year SummaryReport......................................................................................................................... 5 10 -Year SummaryReport......................................................................................................................... 6 100 - Year SummaryReport......................................................................................................................... 7 OFReport.................................................................................................................... 8 cul PN97470 - Page 18 of 64 cull 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v202O.4 Legend Hid. Origin 1 SCS Runoff 2 SCS Runoff 3 Combine 4 SCS Runoff 5 SCS Runoff 6 SCS Runoff 7 SCS Runoff 8 Reservoir 9 Combine 10 Reservoir 11 Combine 12 Combine �RE A.0 --��RE B.0 OST A.1—POST A.2 OST A.3 3- PRE (COMBINE 8 - ROUTE TANK JW 9 - Inflow to SCM (BIOIRET 10 - ROUTE SCM 11 - POST A.0 Description PRE A.0 PRE B.0 PRE (COMBINED) POST A.1 POST A.2 POST A.3 POST B.0 ROUTETANK Inflow to SCM (BIOIRET) ROUTE SCM POST A.0 POST (COMBINED) �sST B.0 12 - POST (COMBINED) Project: JSOC_SWM_Sites_RTA.gpw cul Friday, 09 / 30 / 2022 cul Hydrograph Return Period RecP� y raflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020.4 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr �1-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------ 0.024 0.184 0.000 ------- 1.022 ------- ------- 2.913 PRE A.0 2 SCS Runoff ------ 1.098 1.409 0.498 ------- 2.255 ------- ------- 3.574 PRE B.0 3 Combine 1,2 1.101 1.552 0.498 ------- 3.257 ------- ------- 6.446 PRE (COMBINED) 4 SCS Runoff ------ 0.872 1.081 0.455 ------- 1.640 ------- ------- 2.515 POST A.1 5 SCS Runoff ------ 0.841 1.149 0.288 ------- 2.024 ------- ------- 3.448 POST A.2 6 SCS Runoff ------ 0.315 0.382 0.181 ------- 0.564 ------- ------- 0.851 POST A.3 7 SCS Runoff ------ 0.646 0.918 0.179 ------- 1.712 ------- ------- 3.033 POST B.0 8 Reservoir 4 0.016 0.077 0.000 ------- 1.621 ------- ------- 2.497 ROUTE TANK 9 Combine 5,8 0.841 1.149 0.288 ------- 3.642 ------- ------- 5.928 Inflow to SCM (BIOIRET) 10 Reservoir 9 0.018 0.069 0.000 ------- 1.875 ------- ------- 5.273 ROUTE SCM 11 Combine 6,10 0.315 0.382 0.181 ------- 2.130 ------- ------- 6.048 POSTA.0 12 Combine 7,11 0.957 1.295 0.358 ------- 3.219 ------- ------- 8.960 POST (COMBINED) is 3-yr storm placeholder for 95th percentI le rainfall results Proj. file: JSOC_SWM_Sites_RTA.gpw Friday, 09 / 30 / 2022 cul Hydrograph Summary Report cul Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.024 1 723 327 ------ ------ ------ PRE A.0 2 SCS Runoff 1.098 1 717 2,278 ------ ------ ------ PRE B.0 3 Combine 1.101 1 718 2,605 1,2 ------ ------ PRE (COMBINED) 4 SCS Runoff 0.872 1 717 1,901 ------ ------ ------ POST A.1 5 SCS Runoff 0.841 1 718 1,689 ------ ------ ------ POST A.2 6 SCS Runoff 0.315 1 717 744 ------ ------ ------ POST A.3 7 SCS Runoff 0.646 1 718 1,300 ------ ------ ------ POST B.0 8 Reservoir 0.016 1 950 301 4 268.70 1,602 ROUTE TANK 9 Combine 0.841 1 718 1,990 5,8 ------ ------ Inflow to SCM (BIOIRET) 10 Reservoir 0.018 1 1300 204 9 265.00 1,796 ROUTE SCM 11 Combine 0.315 1 717 948 6,10 ------ ------ POSTA.0 12 Combine 0.957 1 718 2,247 7,11 ------ ------ POST (COMBINED) JSOC_SWM_Sites_RTA.gpw Return Period: 1 Year Friday, 09 / 30 / 2022 CUI Hydrograph Summary Report cul Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.184 1 720 715 ------ ------ ------ PRE A.0 2 SCS Runoff 1.409 1 717 2,961 ------ ------ ------ PRE B.0 3 Combine 1.552 1 718 3,676 1,2 ------ ------ PRE (COMBINED) 4 SCS Runoff 1.081 1 717 2,390 ------ ------ ------ POST A.1 5 SCS Runoff 1.149 1 718 2,323 ------ ------ ------ POST A.2 6 SCS Runoff 0.382 1 717 911 ------ ------ ------ POST A.3 7 SCS Runoff 0.918 1 718 1,843 ------ ------ ------ POST B.0 8 Reservoir 0.077 1 751 790 4 268.72 1,608 ROUTE TANK 9 Combine 1.149 1 718 3,113 5,8 ------ ------ Inflow to SCM (BIOIRET) 10 Reservoir 0.069 1 839 1,327 9 265.02 1,828 ROUTE SCM 11 Combine 0.382 1 717 2,238 6,10 ------ ------ POSTA.0 12 Combine 1.295 1 718 4,081 7,11 ------ ------ POST (COMBINED) JSOC_SWM_Sites_RTA.gpw Return Period: 2 Year Friday, 09 / 30 / 2022 CUI Hydrograph Summary Report cul Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 0.000 1 n/a 0 ------ ------ ------ PRE A.0 2 SCS Runoff 0.498 1 718 1,003 ------ ------ ------ PRE B.0 3 Combine 0.498 1 718 1,003 1,2 ------ ------ PRE (COMBINED) 4 SCS Runoff 0.455 1 717 951 ------ ------ ------ POST A.1 5 SCS Runoff 0.288 1 718 595 ------ ------ ------ POST A.2 6 SCS Runoff 0.181 1 717 413 ------ ------ ------ POST A.3 7 SCS Runoff 0.179 1 718 401 ------ ------ ------ POST B.0 8 Reservoir 0.000 1 n/a 0 4 267.08 951 ROUTE TANK 9 Combine 0.288 1 718 595 5,8 ------ ------ Inflow to SCM (BIOIRET) 10 Reservoir 0.000 1 n/a 0 9 264.28 595 ROUTE SCM 11 Combine 0.181 1 717 413 6,10 ------ ------ POSTA.0 12 Combine 0.358 1 718 814 7,11 ------ ------ POST (COMBINED) JSOC_SWM_Sites_RTA.gpw Return Period: 3 Year Friday, 09 / 30 / 2022 CUI nn Hydrograph Summary Report cul Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 1.022 1 718 2,311 ------ ------ ------ PRE A.0 2 SCS Runoff 2.255 1 717 4,879 ------ ------ ------ PRE B.0 3 Combine 3.257 1 718 7,189 1,2 ------ ------ PRE (COMBINED) 4 SCS Runoff 1.640 1 717 3,736 ------ ------ ------ POST A.1 5 SCS Runoff 2.024 1 717 4,183 ------ ------ ------ POSTA.2 6 SCS Runoff 0.564 1 717 1,366 ------ ------ ------ POST A.3 7 SCS Runoff 1.712 1 718 3,486 ------ ------ ------ POST B.0 8 Reservoir 1.621 1 718 2,136 4 268.91 1,685 ROUTE TANK 9 Combine 3.642 1 718 6,319 5,8 ------ ------ Inflow to SCM (BIOIRET) 10 Reservoir 1.875 1 723 4,533 9 265.22 2,342 ROUTE SCM 11 Combine 2.130 1 723 5,899 6,10 ------ ------ POSTA.0 12 Combine 3.219 1 721 9,385 7,11 ------ ------ POST (COMBINED) JSOC_SWM_Sites_RTA.gpw Return Period: 10 Year Friday, 09 / 30 / 2022 cul Hydrograph Summary Report cul Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020.4 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 2.913 1 718 5,915 ------ ------ ------ PRE A.0 2 SCS Runoff 3.574 1 717 7,988 ------ ------ ------ PRE B.0 3 Combine 6.446 1 718 13,903 1,2 ------ ------ PRE (COMBINED) 4 SCS Runoff 2.515 1 717 5,881 ------ ------ ------ POST A.1 5 SCS Runoff 3.448 1 717 7,327 ------ ------ ------ POST A.2 6 SCS Runoff 0.851 1 717 2,086 ------ ------ ------ POST A.3 7 SCS Runoff 3.033 1 717 6,334 ------ ------ ------ POST B.0 8 Reservoir 2.497 1 718 4,281 4 268.98 1,713 ROUTE TANK 9 Combine 5.928 1 717 11,608 5,8 ------ ------ Inflow to SCM (BIOIRET) 10 Reservoir 5.273 1 720 9,822 9 265.45 2,942 ROUTE SCM 11 Combine 6.048 1 719 11,908 6,10 ------ ------ POST A.0 12 Combine 8.960 1 718 18,242 7,11 ------ ------ POST (COMBINED) JSOC_SWM_Sites_RTA.gpw Return Period: 100 Year Friday, 09 / 30 / 2022 cul cul 8 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (NIA) 1 0.0000 0.0000 0.0000 -------- 2 69.8703 13.1000 0.8658 -------- 3 0.0000 0.0000 0.0000 -------- 5 79.2597 14.6000 0.8369 -------- 10 88.2351 15.5000 0.8279 -------- 25 102.6072 16.5000 0.8217 -------- 50 114.8193 17.2000 0.8199 -------- 100 127.1596 17.8000 0.8186 -------- File name: SampleFHA.idf Intensity = B / (Tc + D)^E Friday, 09 / 30 / 2022 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.69 4.61 3.89 3.38 2.99 2.69 2.44 2.24 2.07 1.93 1.81 1.70 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.57 5.43 4.65 4.08 3.65 3.30 3.02 2.79 2.59 2.42 2.27 2.15 10 7.24 6.04 5.21 4.59 4.12 3.74 3.43 3.17 2.95 2.77 2.60 2.46 25 8.25 6.95 6.03 5.34 4.80 4.38 4.02 3.73 3.48 3.26 3.07 2.91 50 9.04 7.65 6.66 5.92 5.34 4.87 4.49 4.16 3.88 3.65 3.44 3.25 100 9.83 8.36 7.30 6.50 5.87 5.36 4.94 4.59 4.29 4.03 3.80 3.60 Tc = time in minutes. Values may exceed 60. )m\60652522\400 Technical\431 Civil\Calculations\Stormwater\Models\Hvdraflow\NC NRCS FortBraaa Atlas-14.oco Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.07 3.71 1.80 0.00 5.45 0.00 0.00 8.20 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1 st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0 - 00 0.00 0.00 CPI PN97470 - Page 26 of 64 cul 10-Year Hydrograph and Routing Reports cul PN97470 - Page 27 of 64 cul Hydraflow Table of Contents JSOC_SWM_Sites_RTA.gpw Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Friday, 09 / 30 / 2022 Watershed Model Schematic...................................................................................... 1 10 -Year HydrographReports................................................................................................................... 2 Hydrograph No. 1, SCS Runoff, PRE A.0................................................................................ 2 Hydrograph No. 2, SCS Runoff, PRE B.0................................................................................ 3 Hydrograph No. 3, Combine, PRE (COMBINED).................................................................... 4 Hydrograph No. 4, SCS Runoff, POST A.1.............................................................................. 5 Hydrograph No. 5, SCS Runoff, POST A.2.............................................................................. 6 Hydrograph No. 6, SCS Runoff, POST A.3.............................................................................. 7 Hydrograph No. 7, SCS Runoff, POST B.0.............................................................................. 8 Hydrograph No. 8, Reservoir, ROUTE TANK.......................................................................... 9 PondReport - TANK......................................................................................................... 10 Hydrograph No. 9, Combine, Inflow to SCM(BIOIRET)........................................................ 12 Hydrograph No. 10, Reservoir, ROUTE SCM........................................................................ 13 PondReport - SCM........................................................................................................... 14 Hydrograph No. 11, Combine, POST A.O............................................................................... 16 Hydrograph No. 12, Combine, POST (COMBINED).............................................................. 17 OFReport.................................................................................................................. 18 cul PN97470 - Page 28 of 64 Cul 1 Watershed Model Schematic HydraflowHydrographsExtension for Autodesk@Civil 3D@byAutodesk,Inc. v2020.4 �RE A.0 --Pti RE B.0 3 -PRE (COMBINE�OST A.1 �OST A.2 �OST A.3 ff ST B.0 8 - ROUTE TANK 9 - Inflow to SCM (BIOI 10 - ROUTE SCM Legend Hid. Origin Description 1 SCS Runoff PRE A.0 2 SCS Runoff PRE B.0 3 Combine PRE (COMBINED) 4 SCS Runoff POST A.1 5 SCS Runoff POST A.2 6 SCS Runoff POST A.3 7 SCS Runoff POST B.0 8 Reservoir ROUTE TANK 9 Combine Inflow to SCM (BIOIRET) 10 Reservoir ROUTE SCM 11 Combine POSTA.O 12 Combine POST (COMBINED) 11 - POST A.0 12 - POST (COMBINED) Project: JSOC_SWM_Sites_RTA.gpw cul Friday, 09 / 30 / 2022 cul 2 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Friday, 09 / 30 / 2022 Hyd. No. 1 PRE A.0 Hydrograph type = SCS Runoff Peak discharge = 1.022 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 2,311 cuft Drainage area = 0.610 ac Curve number = 52 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.00 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 2.00 1.00 PRE A.0 Hyd. No. 1 -- 10 Year 2 4 6 8 10 12 14 Hyd No. 1 Q (cfs) 2.00 1.00 0.00 16 18 20 22 24 26 Time (hrs) cui PN97470 - Page 30 of 64 Hydrograph cul Report 3 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Hyd. No. 2 PRE B.0 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 0.310 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.45 in Storm duration = 24 hrs Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Friday, 09 / 30 / 2022 = 2.255 cfs = 11.95 hrs = 4,879 cuft = 89 = 0 ft = 6.00 min = Type II = 484 Q (cfs) 3.00 PRE B.0 Hyd. No. 2 -- 10 Year Q (cfs) 3.00 2.00 2.00 1.00 1.00 0.00 0.0 2.0 Hyd No. 4.0 6.0 8.0 10.0 2 12.0 14.0 16.0 0.00 18.0 20.0 Time (hrs) cul PN97470 - Page 31 of 64 cul 4 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Friday, 09 / 30 / 2022 Hyd. No. 3 PRE (COMBINED) Hydrograph type = Combine Peak discharge = 3.257 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 7,189 cuft Inflow hyds. = 1, 2 Contrib. drain. area = 0.920 ac PRE (COMBINED) Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 3 Hyd No. 1 Hyd No. 2 Time (hrs) cul PN97470 - Page 32 of 64 cul 5 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Friday, 09 / 30 / 2022 Hyd. No. 4 POST A.1 Hydrograph type = SCS Runoff Peak discharge = 1.640 cfs Storm frequency = 10 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 3,736 cuft Drainage area = 0.210 ac Curve number = 94 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.00 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 2.00 1.00 w POST A.1 Hyd. No. 4 -- 10 Year 2.0 4.0 6.0 8.0 Hyd No. 4 Q (cfs) 2.00 1.00 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) cul PN97470 - Page 33 of 64 cul 6 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Friday, 09 / 30 / 2022 Hyd. No. 5 POST A.2 Hydrograph type = SCS Runoff Peak discharge = 2.024 cfs Storm frequency = 10 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 4,183 cuft Drainage area = 0.330 ac Curve number = 81 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.00 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 3.00 2.00 1.00 2.0 4.0 Hyd No. 5 6.0 8.0 POST A.2 Hyd. No. 5 -- 10 Year Q (cfs) 3.00 2.00 1.00 ..n•-- , ' I ' 0.00 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs) cul PN97470 - Page 34 of 64 cul 7 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Friday, 09 / 30 / 2022 Hyd. No. 6 POST A.3 Hydrograph type = SCS Runoff Peak discharge = 0.564 cfs Storm frequency = 10 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 1,366 cuft Drainage area = 0.070 ac Curve number = 98 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.00 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) POST A.3 Hyd. No. 6 -- 10 Year Q (cfs) ■I M1� 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 Hyd No. 6 20.0 Time (hrs) cul PN97470 - Page 35 of 64 cul 8 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Friday, 09 / 30 / 2022 Hyd. No. 7 POST B.0 Hydrograph type = SCS Runoff Peak discharge = 1.712 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 3,486 cuft Drainage area = 0.310 ac Curve number = 77 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 6.00 min Total precip. = 5.45 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 2.00 1.00 POST B.0 Hyd. No. 7 -- 10 Year 2 4 6 8 10 12 Hyd No. 7 14 Q (cfs) 2.00 1.00 0.00 16 18 20 22 24 Time (hrs) cull PN97470 - Page 36 of 64 Hydrograph cul Report 9 Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Friday, 09 / 30 / 2022 Hyd. No. 8 ROUTE TANK Hydrograph type = Reservoir Peak discharge = 1.621 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 2,136 cuft Inflow hyd. No. = 4 - POST A.1 Max. Elevation = 268.91 ft Reservoir name = TANK Max. Storage = 1,685 cuft Storage Indication method used Q (cfs) 2.00 1.00 ROUTE TANK Hyd. No. 8 -- 10 Year 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 Hyd No. 8 Hyd No. 4 ® Total storage used = 1,685 cuft Q (cfs) 2.00 1.00 0.00 20.0 Time (hrs) cui PN97470 - Page 37 of 64 Pond Report cul 10 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020.4 Pond No. 1 - TANK Pond Data Trapezoid -Bottom L x W = 25.0 x 16.0 ft, Side slope = 0.00: 1, Bottom elev. = 264.70 ft, Depth = 5.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 264.70 400 0 0 0.50 265.20 400 200 200 1.00 265.70 400 200 400 1.50 266.20 400 200 600 2.00 266.70 400 200 800 2.50 267.20 400 200 1,000 3.00 267.70 400 200 1,200 3.50 268.20 400 200 1,400 4.00 268.70 400 200 1,600 4.50 269.20 400 200 1,800 5.00 269.70 400 200 2,000 Friday, 09 / 30 / 2022 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 12.00 Inactive Inactive Inactive Crest Len (ft) = 4.97 Inactive Inactive Inactive Span (in) = 12.00 0.00 0.00 0.00 Crest El. (ft) = 268.70 0.00 0.00 0.00 No. Barrels = 1 0 0 0 WeirCoeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 265.00 0.00 0.00 0.00 Weir Type = 1 --- --- --- Length (ft) = 40.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation CIvA CIvB CIvC PrfRsr WrA WrB WrC WrD Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 264.70 0.00 --- --- --- 0.00 --- --- 0.05 20 264.75 0.00 --- --- --- 0.00 --- --- 0.10 40 264.80 0.00 --- --- --- 0.00 --- --- 0.15 60 264.85 0.00 --- --- --- 0.00 --- --- 0.20 80 264.90 0.00 --- --- --- 0.00 --- --- 0.25 100 264.95 0.00 --- --- --- 0.00 --- --- 0.30 120 265.00 0.00 --- --- --- 0.00 --- --- 0.35 140 265.05 0.00 --- --- --- 0.00 --- --- 0.40 160 265.10 0.00 --- --- --- 0.00 --- --- 0.45 180 265.15 0.00 --- --- --- 0.00 --- --- 0.50 200 265.20 0.00 --- --- --- 0.00 --- --- 0.55 220 265.25 0.00 --- --- --- 0.00 --- --- 0.60 240 265.30 0.00 --- --- --- 0.00 --- --- 0.65 260 265.35 0.00 --- --- --- 0.00 --- --- 0.70 280 265.40 0.00 --- --- --- 0.00 --- --- 0.75 300 265.45 0.00 --- --- --- 0.00 --- --- 0.80 320 265.50 0.00 --- --- --- 0.00 --- --- 0.85 340 265.55 0.00 --- --- --- 0.00 --- --- 0.90 360 265.60 0.00 --- --- --- 0.00 --- --- 0.95 380 265.65 0.00 --- --- --- 0.00 --- --- 1.00 400 265.70 0.00 --- --- --- 0.00 --- --- 1.05 420 265.75 0.00 --- --- --- 0.00 --- --- 1.10 440 265.80 0.00 --- --- --- 0.00 --- --- 1.15 460 265.85 0.00 --- --- --- 0.00 --- --- 1.20 480 265.90 0.00 --- --- --- 0.00 --- --- 1.25 500 265.95 0.00 --- --- --- 0.00 --- --- 1.30 520 266.00 0.00 --- --- --- 0.00 --- --- 1.35 540 266.05 0.00 --- --- --- 0.00 --- --- 1.40 560 266.10 0.00 --- --- --- 0.00 --- --- 1.45 580 266.15 0.00 --- --- --- 0.00 --- --- 1.50 600 266.20 0.00 --- --- --- 0.00 --- --- 1.55 620 266.25 0.00 --- --- --- 0.00 --- --- --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 CUI Continues on next page... PN97470 - Page 38 of 64 TANK Stage / Storage / Discharge Table Stage Storage Elevation o|vA n1vo o|vo Prfms, xx,A xx,o xx,o xx,o sxn| use, Total 1.00 640 266.30 000 - - - 000 - - - - - 0.000 1.85 000 20035 0.00 -- - -- 0.00 -- -- - -- -- 0.000 1.70 080 200.40 0.00 '- - -' 0.00 -- '- - -- -- 0.000 175 700 200.45 0.00 -' '- -' 0.00 -' -' '- -' -' 0.000 1.80 720 200.50 0.00 '- - -' 0.00 -- '- - -- -- 0.000 1.e5 740 266.55 0.00 -' '- -' 0.00 -' -' '- -' -' 0.000 1.90 700 200.60 0.00 '- - -' 0.00 -- '- - -- -- 0.000 1.95 780 200.05 0.00 -' '- -' 0.00 -' -' '- -' -' 0.000 2.00 800 200.70 0.00 '- - -' 0.00 -- '- - -- -- 0.000 2.05 820 20075 0.00 -' '- -' 0.00 -' -' '- -' -' 0.000 2.10 840 200.80 0.00 '- - -' 0.00 -- '- - -- -- 0.000 2.15 800 200.85 0.00 -' '- -' 0.00 -' -' '- -' -' 0.000 2.20 eeo 266.90 0.00 '- - -' 0.00 -- '- - -- -- 0.000 2.25 900 200.95 0.00 -' '- -' 0.00 -' -' '- -' -' 0.000 2.30 920 207.00 0.00 '- - -' 0.00 -- '- - -- -- 0.000 2.35 940 207.05 0.00 -' '- -' 0.00 -' -' '- -' -' 0.000 2.40 900 207.10 0.00 '- - -' 0.00 -- '- - -- -- 0.000 2.45 980 207.15 0.00 -' '- -' 0.00 -' -' '- -' -' 0.000 2.50 1.000 207.20 0.00 '- - -' 0.00 -- '- - -- -- 0.000 2.55 1.020 20725 0.00 -- - -- 0.00 -- -- - -- -- 0.000 2.60 1.040 207.30 0.00 '- - -' 0.00 -- '- - -- -- 0.000 2.85 1.000 20735 0.00 -- - -- 0.00 -- -- - -- -- 0.000 2.70 1.080 207.40 0.00 '- - -' 0.00 -- '- - -- -- 0.000 2.75 1.100 20745 0.00 -- - -- 0.00 -- -- - -- -- 0.000 2.80 1.120 207.50 0.00 '- - -' 0.00 -- '- - -- -- 0.000 2.e5 1.140 26755 0.00 -- - -- 0.00 -- -- - -- -- 0.000 2.90 1.160 267.60 0.00 '- - -' 0.00 -- '- - -- -- 0.000 2.95 1.180 20785 0.00 -- - -- 0.00 -- -- - -- -- 0.000 3.00 1.200 207.70 0.00 '- - -' 0.00 -- '- - -- -- 0.000 3.05 1.220 20775 0.00 -- - -- 0.00 -- -- - -- -- 0.000 310 1.240 207.80 0.00 '- - -' 0.00 -- '- - -- -- 0.000 3.15 1.200 20785 0.00 -- - -- 0.00 -- -- - -- -- 0.000 3.20 1.280 207.90 0.00 '- - -' 0.00 -- '- - -- -- 0.000 3.25 1.300 20795 0.00 -- - -- 0.00 -- -- - -- -- 0.000 3.30 1.320 208.00 0.00 '- - -' 0.00 -- '- - -- -- 0.000 3.35 1.340 20805 0.00 -- - -- 0.00 -- -- - -- -- 0.000 3.40 1.300 20810 0.00 '- - -' 0.00 -- '- - -- -- 0.000 3.45 1.380 20815 0.00 -- - -- 0.00 -- -- - -- -- 0.000 3.50 1.400 208.20 0.00 '- - -' 0.00 -- '- - -- -- 0.000 3.55 1.420 20825 0.00 -- - -- 0.00 -- -- - -- -- 0.000 3.60 1.440 208.30 0.00 '- - -' 0.00 -- '- - -- -- 0.000 3.85 1.400 20835 0.00 -- - -- 0.00 -- -- - -- -- 0.000 3.70 1.480 208.40 0.00 '- - -' 0.00 -- '- - -- -- 0.000 3.75 1.500 20845 0.00 -- - -- 0.00 -- -- - -- -- 0.000 3.80 1.520 208.50 0.00 '- - -' 0.00 -- '- - -- -- 0.000 3.85 1.540 20855 0.00 -- - -- 0.00 -- -- - -- -- 0.000 3.90 1.500 208.60 0.00 '- - -' 0.00 -- '- - -- -- 0.000 3.95 1.580 20885 0.00 -- - -- 0.00 -- -- - -- -- 0.000 4.00 1.000 208.70 0.00 '- - -' 0.00 -- '- - -- -- 0.000 4.05 1.020 20875 019io -- - -- 018 -- -- - -- -- 0185 410 1.040 208.80 0.54io '- - -' 0.52 -- '- - -- -- 0.523 4.15 1.000 20885 0.90io -- - -- 0.90 -- -- - -- -- 0.901 4.20 1.080 208.90 1.49io '- - -' 1.48 -- '- - -- -- 1.480 4.25 1.700 26895 2.07io -- - -- 2.07 -- -- - -- -- 2.068 4.30 1.720 269.00 2.72oo '- - -' 2.72 -- '- - -- -- 2.718 4.35 1.740 269.05 3.43oo -' '- -' 3.43 -' -' '- -' -' 3.426 4.40 1.700 20910 419oo '- - -' 419 -- '- - -- -- 4185 4.45 1.780 269.15 4.9eoo -- - -- 4.9e -- -- - -- -- 4.994 4.50 1.800 269.20 o.a000 '- - -' 5.85 -- '- - -- -- 5.851 4.55 1.820 269.25 6.73oo -- - -- 6.73o -- -- - -- -- 6.729 4.60 1.840 269.30 s.msoo '- - -' 6.95s -- '- - -- -- 6.945 4.05 1.800 209.35 7.0800 -' '- -' 7.08o -' -' '- -' -' 7.081 4.70 1.880 209.40 719oo '- - -' 7.19s -- '- - -- -- 7188 4.75 1.900 269.45 7.2800 -- - -- 7.28o -- -- - -- -- 7.279 4.80 1.920 269.50 7.3600 '- - -' 7.36o -- '- - -- -- 7.359 4.85 1.940 269o5 7.43oo -' '- -' 7.43o -' -' '- -' -' 7.431 4.90 1.900 209.60 7.50oo '- - -' 7.50o -- '- - -- -- 7.500 4.95 1.980 269.65 7.5600 -' '- -' 7.56o -' -' '- -' -' 7.562 5.00 2.000 269.70 7.62oo '- - -' 7.62o -- '- - -- -- 7.622 ou| cul 12 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Friday, 09 / 30 / 2022 Hyd. No. 9 Inflow to SCM (BIOIRET) Hydrograph type = Combine Peak discharge = 3.642 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 6,319 cuft Inflow hyds. = 5, 8 Contrib. drain. area = 0.330 ac Inflow to SCM (BIOIRET) Q (cfs) Hyd. No. 9 -- 10 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 — Hyd No. 9 Hyd No. 5 Hyd No. 8 Time (hrs) cul PN97470 - Page 40 of 64 cul 13 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Friday, 09 / 30 / 2022 Hyd. No. 10 ROUTE SCM Hydrograph type = Reservoir Peak discharge = 1.875 cfs Storm frequency = 10 yrs Time to peak = 12.05 hrs Time interval = 1 min Hyd. volume = 4,533 cuft Inflow hyd. No. = 9 - Inflow to SCM (BIOIRET) Max. Elevation = 265.22 ft Reservoir name = SCM Max. Storage = 2,342 cuft Storage Indication method used. ROUTE SCM Q (cfs) Hyd. No. 10 -- 10 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 10 — Hyd No. 9 ® Total storage used = 2,342 cult Time (hrs) cui PN97470 - Page 41 of 64 Pond Report cul 14 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D@ by Autodesk, Inc. v2020.4 Pond No. 2 - SCM Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 263.50 ft Stage / Storage Table Stage (ft) Elevation (ft) 0.00 263.50 0.50 264.00 1.00 264.50 1.50 265.00 2.00 265.50 2.50 266.00 Contour area (sqft) 00 1,262 1,525 2,003 3,144 3,144 Incr. Storage (cuft) 0 210 696 879 1,276 1,572 Total storage (cuft) 0 210 906 1,785 3,061 4,633 Friday, 09 / 30 / 2022 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 12.00 0.00 0.00 0.00 Crest Len (ft) = 5.50 10.00 0.00 0.00 Span (in) = 12.00 0.00 0.00 0.00 Crest El. (ft) = 265.00 265.70 0.00 0.00 No. Barrels = 1 0 0 0 WeirCoeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 262.40 0.00 0.00 0.00 Weir Type = 1 Broad --- --- Length (ft) = 40.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation CIvA CIvB CIvC PrfRsr WrA WrB WrC WrD Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 263.50 0.00 --- --- --- 0.00 0.00 --- 0.05 21 263.55 2.09 oc --- --- --- 0.00 0.00 --- 0.10 42 263.60 2.09 oc --- --- --- 0.00 0.00 --- 0.15 63 263.65 2.09 oc --- --- --- 0.00 0.00 --- 0.20 84 263.70 2.09 oc --- --- --- 0.00 0.00 --- 0.25 105 263.75 2.09 oc --- --- --- 0.00 0.00 --- 0.30 126 263.80 2.09 oc --- --- --- 0.00 0.00 --- 0.35 147 263.85 2.09 oc --- --- --- 0.00 0.00 --- 0.40 168 263.90 2.09 oc --- --- --- 0.00 0.00 --- 0.45 189 263.95 2.09 oc --- --- --- 0.00 0.00 --- 0.50 210 264.00 2.09 oc --- --- --- 0.00 0.00 --- 0.55 280 264.05 2.09 oc --- --- --- 0.00 0.00 --- 0.60 349 264.10 2.09 oc --- --- --- 0.00 0.00 --- 0.65 419 264.15 2.09 oc --- --- --- 0.00 0.00 --- 0.70 489 264.20 2.09 oc --- --- --- 0.00 0.00 --- 0.75 558 264.25 2.09 oc --- --- --- 0.00 0.00 --- 0.80 628 264.30 2.09 oc --- --- --- 0.00 0.00 --- 0.85 697 264.35 2.09 oc --- --- --- 0.00 0.00 --- 0.90 767 264.40 2.09 oc --- --- --- 0.00 0.00 --- 0.95 836 264.45 2.09 oc --- --- --- 0.00 0.00 --- 1.00 906 264.50 2.09 oc --- --- --- 0.00 0.00 --- 1.05 994 264.55 2.09 oc --- --- --- 0.00 0.00 --- 1.10 1,082 264.60 2.09 oc --- --- --- 0.00 0.00 --- 1.15 1,170 264.65 2.09 oc --- --- --- 0.00 0.00 --- 1.20 1,258 264.70 2.09 oc --- --- --- 0.00 0.00 --- 1.25 1,346 264.75 2.09 oc --- --- --- 0.00 0.00 --- 1.30 1,433 264.80 2.09 oc --- --- --- 0.00 0.00 --- 1.35 1,521 264.85 2.09 oc --- --- --- 0.00 0.00 --- 1.40 1,609 264.90 2.09 oc --- --- --- 0.00 0.00 --- 1.45 1,697 264.95 2.09 oc --- --- --- 0.00 0.00 --- 1.50 1,785 265.00 2.09 oc --- --- --- 0.00 0.00 --- 1.55 1,913 265.05 2.09 oc --- --- --- 0.20 0.00 --- 1.60 2,040 265.10 2.09 oc --- --- --- 0.58 0.00 --- 1.65 2,168 265.15 2.09 oc --- --- --- 1.06 0.00 --- 1.70 2,296 265.20 2.09 oc --- --- --- 1.64 0.00 --- 1.75 2,423 265.25 2.29 oc --- --- --- 2.29 0.00 --- 1.80 2,551 265.30 3.01 oc --- --- --- 3.01 0.00 --- --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.000 --- --- --- 0.205 --- --- --- 0.579 --- --- --- 1.064 --- --- --- 1.638 --- --- --- 2.288 --- --- --- 3.008 CUI Continues on next page... PN97470 - Page 42 of 64 Cul 15 SCM Stage / Storage / Discharge Table Stage Storage Elevation CIvA CIvB CIvC PrfRsr WrA WrB WrC Wrl) ExfiI User Total ft Cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 1.85 2,678 265.35 3.79 oc --- --- --- 3.79 0.00 --- --- --- --- 3.791 1.90 2,806 265.40 4.63 oc --- --- --- 4.63 0.00 --- --- --- --- 4.632 1.95 2,934 265.45 5.26 oc --- --- --- 5.26 s 0.00 --- --- --- --- 5.261 2.00 3,061 265.50 5.46 oc --- --- --- 5.45 s 0.00 --- --- --- --- 5.455 2.05 3,218 265.55 5.60 oc --- --- --- 5.60 s 0.00 --- --- --- --- 5.595 2.10 3,375 265.60 5.71 oc --- --- --- 5.71 s 0.00 --- --- --- --- 5.708 2.15 3,533 265.65 5.81 oc --- --- --- 5.81 s 0.00 --- --- --- --- 5.806 2.20 3,690 265.70 5.90 oc --- --- --- 5.90 s 0.00 --- --- --- --- 5.895 2.25 3,847 265.75 5.98 oc --- --- --- 5.97 s 0.29 --- --- --- --- 6.264 2.30 4,004 265.80 6.05 oc --- --- --- 6.05 s 0.82 --- --- --- --- 6.872 2.35 4,161 265.85 6.12 oc --- --- --- 6.12 s 1.51 --- --- --- --- 7.629 2.40 4,319 265.90 6.19 oc --- --- --- 6.19 s 2.32 --- --- --- --- 8.515 2.45 4,476 265.95 6.26 oc --- --- --- 6.26 s 3.25 --- --- --- --- 9.504 2.50 4,633 266.00 6.32 oc --- --- --- 6.32 s 4.27 --- --- --- --- 10.59 ... End Cul PN97470 - Page 43 of 64 cul 16 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Friday, 09 / 30 / 2022 Hyd. No. 11 POST A.0 Hydrograph type = Combine Peak discharge = 2.130 cfs Storm frequency = 10 yrs Time to peak = 12.05 hrs Time interval = 1 min Hyd. volume = 5,899 cuft Inflow hyds. = 6, 10 Contrib. drain. area = 0.070 ac POST A.0 Q (cfs) Hyd. No. 11 -- 10 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 11 — Hyd No. 6 Hyd No. 10 Time (hrs) cul PN97470 - Page 44 of 64 cul 17 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Friday, 09 / 30 / 2022 Hyd. No. 12 POST (COMBINED) Hydrograph type = Combine Peak discharge = 3.219 cfs Storm frequency = 10 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 9,385 cuft Inflow hyds. = 7, 11 Contrib. drain. area = 0.310 ac POST (COMBINED) Q (cfs) Hyd. No. 12 -- 10 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 — Hyd No. 12 Hyd No. 7 Hyd No. 11 Time (hrs) cul PN97470 - Page 45 of 64 cul 18 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for AUtodeskS Civil 3DO by Autodesk, Inc. v2020.4 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (NIA) 1 0.0000 0.0000 0.0000 -------- 2 69.8703 13.1000 0.8658 -------- 3 0.0000 0.0000 0.0000 -------- 5 79.2597 14.6000 0.8369 -------- 10 88.2351 15.5000 0.8279 -------- 25 102.6072 16.5000 0.8217 -------- 50 114.8193 17.2000 0.8199 -------- 100 127.1596 17.8000 0.8186 -------- File name: SampleFHA.idf Intensity = B / (Tc + D)^E Friday, 09 / 30 / 2022 Return Period Intensity Values (in/hr) (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.69 4.61 3.89 3.38 2.99 2.69 2.44 2.24 2.07 1.93 1.81 1.70 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.57 5.43 4.65 4.08 3.65 3.30 3.02 2.79 2.59 2.42 2.27 2.15 10 7.24 6.04 5.21 4.59 4.12 3.74 3.43 3.17 2.95 2.77 2.60 2.46 25 8.25 6.95 6.03 5.34 4.80 4.38 4.02 3.73 3.48 3.26 3.07 2.91 50 9.04 7.65 6.66 5.92 5.34 4.87 4.49 4.16 3.88 3.65 3.44 3.25 100 9.83 8.36 7.30 6.50 5.87 5.36 4.94 4.59 4.29 4.03 3.80 3.60 Tc = time in minutes. Values may exceed 60. )m\60652522\400 Technical\431 Civil\Calculations\Stormwater\Models\Hvdraflow\NC NRCS FortBraaa Atlas-14.oco Storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.07 3.71 1.80 0.00 5.45 0.00 0.00 8.20 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1 st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0 - 00 0.00 0.00 CPI PN97470 - Page 46 of 64 cul NOAA Atlas-14 Rainfall Data cul PN97470 - Page 47 of 64 NOAA Atlas 14, Volume 2, Version 3 ' Location name: Fort Bragg, North Carolina, USA*AMIN Latitude: 35.1189°, Longitude:-79.3504' Elevation: 419.14 ft** `source: ESRI Maps_ source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 0.439 0.519 0.604 0.667 0.740 0.793 0.843 0.889 0.944 0.987 5-min (0.399-0.485) (0.472-0.573) (0.549-0.667) (0.605-0.735) (D.669-0.815) (0.714-0.872) (0.755-0.926) (0.792-0.976) (0.834-1.04) (0.865-1.09) 0.701 0.829 0.967 1.07 1.18 1.26 1.34 1.41 1.49 1.55 10-min (0.638-0.775) (0.755-0.917) (0.878-1.07) (0.967-1.18) ( 1.07-1.3D) (1.14-1.39) (1.20-1.47) 11 1.26-1.55) (1.32-1.64) ( 1.36-1.71) 0.876 1.04 1.22 1.35 1.50 1.60 1.69 1.78 1.88 1.95 15-min (0.797-0.968) (0.949-1.15) 1 (1.11-1.35) 1 (1.22-1.49) 1 (1.35-1.65) 1 (1.44-1.76) 1 (1.52-1.86) 11 (1.58-1.95) (1.66-2.07) (1.71-2.15) 1.20 1.44 1.74 1.95 2.22 2.41 2.59 2.77 2.99 3.16 30-min 1 ( .09-1.33) (1.31-1.59) (1.58-1.92) (1.77-2.15) (2.00-2.44) (2.17-2.65) (2.32-2.85) (2.47-3.04) (2.64-3.29) (2.77-3.47) 1.50 1.81 2.23 2.54 2.95 3.27 3.57 3.88 4.29 4.61 60-min (1 .36-1.66) (1.65-2.00) (2.02-2.46) (2.31-2.80) (2.66-3.25) (2.94-3.59) (3.20-3.93) (3.46-4.26) (3.794.72) ( 4.D4-5.07) 1.76 2.13 2.66 3.07 3.61 4.03 4.46 4.89 5.47 5.92 2-hr 1 ( .59-1.96) (1.93-2.37) (2.40-2.97) (2.77-3.42) (3.23-4.02) (3.60-4.49) (3.95-4.96) (4.31-5.43) ( 4.77-6.08) (5.12-6.59) 3-hr 1.68-62608 2.04 2552 2.56-3316 2.96 3066 3.50135 3.93 4191 4. 65348 4.80 6008 5.40 6392 5.87-67459 6.63 6-hr 2.01 2.46 2.44-62097 3.06 3?73 3. 54 34 4.216.17 4.73 5185 5. 6 6555 5.81-7.29 6.56 8832 7. 4 9417 2. 4. 9. 12-hr 2.372�90 2.87 3051 3.62D .44 4. 26819 5.03 6321 5. 9-47 07 6.36 7496 7.06 8?92 8.02-310.3 8.78-141.4 3.07 3.71 4.68 5.45 6.50 7.34 8.20 9.10 10.3 11.3 24-hr (2.85-3.33) (3.444.03) (4.33-5.08) (5.03-5.90) (5.98-7.04) (6.73-7.94) (7.50-8.87) 11 (8.30-9.83) (9.38-11.2) (10.2-12.2) 3.58 4.31 5.40 6.26 7.43 8.37 9.33 10.3 11.7 12.8 2-day (3.32-3.86) (4.014.65) (5.01-5.82) (5.80-6.74) 1 (6.86-8.00) (7.70-9.01) (8.57-10.0) 11 (9.44-11.1) (10.6-12.6) (11.6-13.8) 3.79 4.57 5.68 6.57 7.78 8.75 9.74 10.8 12.2 13.3 3-day (3.54-4.07) (4.264.90) (5.29-6.10) (6.11-7.04) (7.21-8.34) (8.08-9.38) 1 (8.97-10.5) (9.88-11.6) (11.1-13.1) (12.1-14.3) 4.01 4.82 5.97 6.88 8.14 9.13 10.2 11.2 12.7 13.8 4-day (3.75-4.29) (4.51-5.16) (5.58-6.38) (6.42-7.34) (7.56-8.69) (8.46-9.75) 1 (9.38-10.9) 1 (10.3-12.0) (11.6-13.6) (12.6-14.8) 12 4.1 7-day 3 4 33 4496 5. 85493 6. 7025 7.23 8030 8.47-9.74 9.44-10.9 10.4- 2.1 11 5-13.3 12.18-15.0 13 9516.3 5.3064 819417 10-day 5. 5.9.12 7.88209 8.11.3 9.37o1D.6 10.4-11.8 113�13.0 1213-14.1 1317415.8 1417617.0 0. 17618.8 20-day 2.3 6.7.1457 7.98 8495 9.4 D.6 10.6 ,2.9 1212.1 7 131415.0 1415-16.4 155.5 1713 19.8 18 50 30-day 8 8 9738 9.88- 1.1 115�12.9 12.18-14.3 14.4-16.2 15.17---17.6 16.19-19.1 18.11 0.5 19.7 2.5 21 0-24.0 11.2 13.2 15.1 16.6 18.5 20.0 21.4 22.8 24.6 26.0 45-day (10.6-11.9) 11 (12.5-13.9) 11 (14.3-15.9) (15.7-17.5) (17.5-19.5) (18.8-21.1) (20.1-22.6) 1 (21.4-24.1) (23.1-26.1) (24.3-27.6) 13.4 15.7 17.9 19.5 21.6 23.2 24.7 26.2 28.1 29.6 60-day (12.8-14.2) (14.9-16.6) (16.9-18.8) (18.5-20.5) (20.4-22.7) (21.9-24.4) (23.3-26.0) (24.7-27.6) (26.4-29.7) (27.7-31.3) t Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90 % confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical cul PN97470 - Page 48 of 64 NOAA Atlas 14, Volume 2, Version 3 ' Location name: Fort Bragg, North Carolina, USA*AMIN Latitude: 35.1189°, Longitude:-79.3504' Elevation: 419.14 ft** `source: ESRI Maps_ "source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in incheslhour)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5.27 6.23 7.25 8.00 8.88 9.52 10.1 10.7 11.3 11.8 5-min (4.79-5.82) (5.66-6.88) (6.59-8.00) (7.26-8.82) (8.03-9.78) (8.57-10.5) (9.06-11.1) (9.50-11.7) ( 10.0-12.5) 10.4-13.0) 4.21 4.97 5.80 6.40 7.08 7.58 8.04 8.45 8.96 9.32 10-min (3.83-4.65) (4.53-5.50) (5.27-6.41) (5.80-7.05) (6.40-7.79) (6.83-8.33) (7.20-8.83) (7.54-9.29) ( 7.91-9.85) (8.17-10.3) 3.50 4.17 4.89 5.39 5.98 6.40 6.78 7.11 7.52 7.80 15-min (3.19-3.87) (3.80-4.61) (4.44-5.40) (4.89-5.94) (5.40-6.58) (5.76-7.04) (6.07-7.44) (6.34-7.81) (6.64-8.26) (6.84-8.58) 2.40 2.88 3.47 3.91 4.43 4.82 5.19 5.53 5.98 6.32 30-min (2.19-2.65) (2.62-3.18) (3.16-3.84) (3.55-4.31) (4.00-4.88) (4.34-5.30) (4.65-5.70) (4.93-6.08) (5.28-6.57) (5.54-6.95) 1.50 1.81 2.23 2.54 2.95 3.27 3.57 3.88 4.29 4.61 60-min (1 .36-1.66) (1.65-2.00) (2.02-2.46) (2.31-2.80) (2.66-3.25) (2.94-3.59) (3.20-3.93) (3.46-4.26) (3.79-4.72) 4.04-5.07) 0.878 1.06 1.33 1.53 1.81 2.02 2.23 2.44 2.73 2.96 2-hr (0.794-0.980) (0.962-1.19) 1 (1.20-1.48) 1 (1.38-1.71) 11 (1.62-2.01) 1 (1.80-2.24) (1.98-2.48) (2.15-2.72) (2.39-3.04) (2.56-3.29) 1.09 1.8 3-hr 0.560-0 691 0.6778--0 837 0.8594105 0.987---11.22 1.17-31.45 1.31-41764 1.45-61482 1.60--2?02 1. 00.30 1.95 2853 1g3953 6-hr 0.336-04 11 0.407---0 496 0.511-0 623 0.592--0..725 0.703-0 864 0.790-0 977 0.879--11.09 0.970-1.22 1.10-21.39 1 67 0.532 12-hr 0.197-0.241 0.238-0.292 0.300--0 368 0.350-0430 0.4D18-0516 0.4772-0586 0.5228-0 661 0.586-0. 40 0.666-0 854 .863 0.728-0 946 0.128 0.155 0.195 0.227 0.271 0.306 0.342 0.379 0.430 0.471 24-hr (0.119-0.139) (0.143-0.168) (0.181-0.212) (0.209-0.246) (0.249-0.293) (0.281-0.331) (0.313-0.370) (0.346-0.410) (0.391-0.465) (0.426-0.509) 0.074 0.090 0.112 0.130 0.155 0.174 0.194 0.215 0.243 0.266 2-day (0.069-0.080) (0.084-0.097) (0.104-0.121) (0.121-0.140) (0.143-0.167) (0.160-0.188) (0.178-0.209) (0.197-0.232) (0.222-0.263) (0.241-0.287) 0.053 0.063 0.079 0.091 0.108 D.122 0.135 D.150 0.169 0.184 3-day (0.049-0.057) (0.059-0.068) (0.074-0.085) (0.085-0.098) (0.100-0.116) (0.112-0.130) (0.125-0.145) (0.137-0.161) (0.154-0.182) (0.168-0.199) 0.042 0.050 0.062 0.072 0.085 1.095 0.106 0.117 0.132 0.144 4-day (0.039-0.045) (0.047-0.054) (0.058-0.066) (0.067-0.076) (0.079-0.090) (0.088-0.102) (0.098-0.113) (0.108-0.125) (0.121-0.141) (0.131-0.154) 0.021 7-day 0.026-0 030 0.031 0 035 0.038-0043 0. 4 -0 049 0.050-0 058 0.056-0065 006 -0 072 D. 68-D 079 0.076-0 089 0. 8 -0 097 10-day .142 0.021--0 024 0.02 -0 028 0.030-0034 0.03 -0 038 0.039-0 044 0.043-D 049 0047--0 054 0.051 D 059 0.057--0 066 0. 61--0 071 021 123 1.127 1.14 20-115 day 0.014-0 016 0.017--0 019 0.020-0022 0.02 -0 025 0. 0028 0.028-0031 0.03 0-0 034 0.033-D 037 0.036-0 041 0.039-0 044 0.112 30-day .121 0.01 -0 013 0.014-0 015 0.016-0018 0.018-002D 0.020-0 022 0.02 -0 024 0.023--0 026 0.025-D 028 0.027--0 031 0.029-0 033 0.01D 0.012 0.014 0.015 0.017 1.018 0.020 1.021 0.023 0.024 45-day (0.010-0.011) (0.012-0.013) (0.013-0.015) (0.015-0.016) (0.016-0.018) (0.017-0.020) (0.019-0.021) (0.020-0.022) (0.021-0.024) (0.023-0.026) 0.009 O.D11 0.012 0.014 0.015 0.016 0.017 D.018 0.020 0.021 60-day (0.009-0.010) (0.010-D.D11) (0.012-0.013) (O.D13-D.014) (0.014-0.016) (0.015-0.017) (0.016-0.018) (0.017-D.D19) (0.018-0.021) (0.019-0.022) frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). rs inparenthesis are PF estimates at lower and upper hounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a EP,.�afn,121,on uration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not d against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. rfer to NOAA Atlas 14 document for more information. Back to Top PF graphical cul PN97470 - Page 49 of 64 CUI Bioretention SCM Underdrain Calculations CUI PN97470 - Page 50 of 64 cul NCDEQ Stormwater Design Manual 0 Environmental Quality When an impoundment is located in karst topography, gravelly sands, or fractured bedrock, a liner may be needed to sustain a permanent pool of water. If geotechnical tests confirm the need for a liner, acceptable options can include: 6 to 12 inches of clay soil (minimum 15 percent passing the #200 sieve and a maximum permeability of 1 x 10-5 cm/sec), a 30 mil poly -liner, or a bentonite liner. Underdrain Systems Underdrain systems are utilized in several SCM designs, and can have many different configurations. The underdrain system will either daylight, connect to another SCM, or connect to the conveyance system. All piping within the underdrain system should have a minimum slope of 0.5 percent and should be constructed of Schedule 40 or SDR 35 smooth wall PVC pipe. The underdrain pipes should be designed to carry 2-10 times the maximum flow exfiltrating from the SCM medium. Choose a value within this range to reflect the expected stability of the drainage area. This maximum flow is computed from Darcy's law and assuming maximum ponding and complete saturation along the depth of the medium. Manning's formula is then used to size the pipe. Due to the risk of underdrain clogging, designers are encouraged to install more than one underdrain of smaller diameter in order to facilitate drainage. The minimum size of pipe should be 4-inch diameter. The spacing of collection laterals should be no greater than 10 feet center to center, and a minimum of two pipes should be installed to allow for redundancy (Hunt and White, 2001). A minimum of 4 rows of perforations should be provided around the diameter of the pipe (more for pipes 10 inches in diameter and larger), and the perforations should be placed 6 inches on center within each row for the entire length of the drainage lateral. Perforations should be 3/8-inch in diameter. The underdrain pipes should have a minimum of 3 inches of washed #57 stone above and on each side of the pipe (stone is not required below the pipe). Above the stone, either filter fabric or two inches of choking stone is recommended to protect the underdrain from blockage. Avoid filter fabric if there is any question about the future stability of the drainage area. Above the filtering device, a minimum of 2 inches of washed sand should be installed. Choking stone (#8 or #89) in lieu of filter fabric is recommended if there is potential for higher sediment loads that would lead to clogging. Pipe socks are also not recommended. Typically, bioretention SCMs in the Piedmont region of North Carolina will require underdrains with an up -turned elbow. The number of pipes needed for the underdrain system can be determined using the following 3- step process: 1. Determine flow rate through the soil media and apply a safety factor of 10 (this is now the underdrain design flow, Q). 2. Use Equation 1 below FILTER MEDIA SURFACE AREA —1260 SF 6 i n/h r = 0.5 ft/h r ... 0.5* 1260 / 3600 = 0.175 cfs x 10 = 1.75 cfs 2 i n/h r = 0.16 ft/h r ... 0.16* 1260 / 3600 = 0.056 cfs x 10 = 0.56 cfs A-5. Common SCM Structures & Materials 12 Revised: 2-11-2018 cui PN97470 - Page 51 of 64 NCDEQ Stormwater Design Manual cul En vironmental Quality Equation 1: Underdrain Pipe Size (3) for 6 in/hr (MAX): Q = 1.75 cfs --> D = 9.82 inches Q n 8 for 4 in/hr: Q = 1.16 cfs --> D = 8.41 inches D = 16 So.s for 3 in/hr: Q = 0.88 cfs --> D = 7.57 inches for 2 in/hr (MIN): Q = 0.56 cfs --> D = 6.41 inches where: D = Diameter of single pipe (inches) n = Roughness factor (recommended to be 0.011) S = Internal slope (recommended to be 0.5%) Q = Underdrain design flow (cfs) 3. The only unknown is D. This is the diameter of a single pipe that could carry all the water were it to be the only underdrain. Underdrain pipe diameters are typically either 4 inches or 6 inches. Table 1 and 2 below convert D (in inches) to an equal number of 4 or 6 inch underdrains at 0.5% slope. Table 1: Number of 4" Pipes Required in the Underdrain 5.13 2 5.95 3 4 - 4" underdrains to 6.66 4 handle a media infiltration rate of u p to 2 in/hr. 7.22 5 7.75 6 8.20 7 Table 2: Number of 6" Pipes Required in the Underdrain ff ' is Less Than No. of 6" Pipes 2 - 6" underdrains to 7.84 2 handle a media infiltration rate up to 3 in/hr. 9.11 3 4 - 6" underdrains to 10.13 4 handle a media infiltration rate of up to 6 in/hr. A-5. Common SCM Structures & Materials 13 Revised: 2-11-2018 SUMMARY: Selecting underdrains for 3 in/hr (nominal) target. USE two 6-inch underdrains connected to one 8-inch underdrain manifold. Turn up manifold with 90d elbows to set the internal water storage (IWS) depth as shown on drawing, 7A�O - Paae 52 of 6, cul NCDEQ Stormwater Design Manual Environmental Quality R i ill 4 C P_ I Outlets of SCMs are the devices that control the flow of stormwater out of the SCM to the conveyance system (stormwater pipe, natural drainageway, etc.). While most of the water quality treatment takes place within the SCM, the outlet design is often integral to treatment efficiency, as well as being a critical factor in stormwater volume control. Water quality is affected by how quickly the water is removed from the treatment unit, thereby affecting sedimentation time and possibly causing resuspension of particles. The depth from which the water is drawn also affects water quality, since the water is typically cleaner the higher it is in the water column. Finally, the design of the outlet is also the main means of controlling peak flow volumes and rates. Outlet designs are specific for each SCM depending on the goals to be achieved. The following sections will discuss many of the most common outlet designs. Hydraulic calculations for outlets types as well as storage and drawdowns are provided in Part B, Calculation Guidance. It should be noted that floatation issues should be considered with any structure (outlet box, riser, etc.) placed within a SCM. Designers should consider including provisions such as adjustable weirs to regulate and optimize water surface elevations and bottom drains and valves to allow the SCM to be drained for repairs and maintenance A drawdown orifice should have a turned -down elbow or other safeguard in order to prevent trash or other material floating on the surface from clogging the pipe. An example is shown in Figure 5. A-5. Common SCM Structures & Materials 14 Revised: 2-11-2018 cui PN97470 - Page 53 of 64 CUI Bioretention SCM Outlet Control Structure Weir and Orifice Flow Data CUI PN97470 - Page 54 of 64 cul 2.00 1.90 1.80 1.70 1.60 1.50 1.40 1.30 1.20 z 1.10 1.00 CL W 0 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0.00 2.00 4.00 6.00 8.00 trolling Flow (Weir Equations) CLOGGING 266.60 266.20 Q (Orifice) cfs 266.00 """ Q (Weir) cfs Total Q (Controlling) 265.80 cfs Elevation (ft) 265.60 265.40 041.1.1Ki7 265.00 10.00 12.00 14.00 16.00 18.00 20.00 Flow (cfs) cui PN97470 - Page 55 of 64 CUI Total Q Depth Q (Orifice) Q (Weir) (Controlling) Elevation ft cfs cfs cfs 265.00 0.00 265.01 0.01 0.88 0.01 0.01 265.03 0.025 1.40 0.05 0.05 265.05 0.05 1.97 0.15 0.15 265.10 0.10 2.79 0.43 0.43 265.15 0.15 3.42 0.78 0.78 265.20 0.20 3.95 1.21 1.21 265.25 0.25 4.41 1.68 1.68 265.30 0.30 4.83 2.21 2.21 265.35 0.35 5.22 2.79 2.79 265.40 0.40 5.58 3.41 3.41 265.45 0.45 5.92 4.07 4.07 265.50 0.50 6.24 4.76 4.76 265.55 0.55 6.55 5.50 5.50 265.60 0.60 6.84 6.26 6.26 265.65 0.65 7.12 7.06 7.06 265.70 0.70 7.39 7.89 7.39 265.75 0.75 7.64 8.75 7.64 265.80 0.80 7.90 9.64 7.90 265.85 0.85 8.14 10.56 8.14 265.90 0.90 8.37 11.51 8.37 265.95 0.95 8.60 12.48 8.60 266.00 1.00 8.83 13.48 8.83 266.05 1.05 9.05 14.50 9.05 266.10 1.10 9.26 15.55 9.26 266.15 1.15 9.47 16.62 9.47 266.20 1.20 9.67 17.71 9.67 267.20 2.20 13.09 43.97 13.09 268.20 3.20 15.79 77.14 15.79 269.20 4.20 18.09 115.99 18.09 270.20 5.20 20.13 159.78 20.13 271.20 6.20 21.98 208.03 21.98 272.20 7.20 23.69 260.33 23.69 273.20 8.20 25.28 316.41 25.28 274.20 9.20 26.78 376.02 26.78 Weir Flow Calculations Weir Equation: Q = 3.3Nh)'.s • Q = Gapaeity in CFS • P = Feet perimeler • h = Head in Feet • 'Neir Information Total perimeter of grate, PGRATE ••• OrMice Flow Calculations Orifice Row Equation: Q = GAA • Q = Capacity in CFS • A = Free open area of grate in sq. IL • 9 = a2.2 {fee# per serfsecy • h = Head in feel • Orifte Information Weff = Leff = P = of Lweir = Clogging = Peff = Peff = 16.00 inches inches inches (50% = flow from one direction) (used for weir & orifice) feet feet (with clogging) 33.00 98.00 100% 50% 8.17 4.08 y r: + - H �o-K rr r V 4 u f try n V-7 Ir Unit open area for orifice equation (from Neenah) = 0.4 ftz per LF Aunit = 1.3333 ftz per LF Atota, = 3.6667 ft z Atota1,eff = 1.8333 ft z j N N 2 Z O U w CO CUI PN97470 - Page 56 of 64 cul 2.00 1.90 1.80 1.70 1.60 1.50 1.40 1.30 1.20 $ 1.10 sz 1.00 a� 0 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0.00 2.00 4.00 6.00 8.00 trolling Flow (Weir Equations) CLOGGING 266.60 41-1. Us] 266.20 _ Q (Orifice) cfs 266.00 """ Q (Weir) cfs Total Q (Controlling) 265.80 cfs Elevation (ft) 265.60 265.40 265.20 265.00 10.00 12.00 14.00 16.00 18.00 20.00 Flow (cfs) cui PN97470 - Page 57 of 64 CUI Total Q Depth Q (Orifice) Q (Weir) (Controlling) Elevation ft cfs cfs cfs 265.00 0.00 265.01 0.01 1.77 0.03 0.03 265.03 0.025 2.79 0.11 0.11 265.05 0.05 3.95 0.30 0.30 265.10 0.10 5.58 0.85 0.85 265.15 0.15 6.84 1.57 1.57 265.20 0.20 7.90 2.41 2.41 265.25 0.25 8.83 3.37 3.37 265.30 0.30 9.67 4.43 4.43 265.35 0.35 10.44 5.58 5.58 265.40 0.40 11.17 6.82 6.82 265.45 0.45 11.84 8.14 8.14 265.50 0.50 12.48 9.53 9.53 265.55 0.55 13.09 10.99 10.99 265.60 0.60 13.68 12.53 12.53 265.65 0.65 14.23 14.12 14.12 265.70 0.70 14.77 15.78 14.77 265.75 0.75 15.29 17.50 15.29 265.80 0.80 15.79 19.28 15.79 265.85 0.85 16.28 21.12 16.28 265.90 0.90 16.75 23.01 16.75 265.95 0.95 17.21 24.95 17.21 266.00 1.00 17.65 26.95 17.65 266.05 1.05 18.09 29.00 18.09 266.10 1.10 18.52 31.09 18.52 266.15 1.15 18.93 33.24 18.93 266.20 1.20 19.34 35.43 19.34 267.20 2.20 26.19 87.94 26.19 268.20 3.20 31.58 154.27 31.58 269.20 4.20 36.18 231.97 36.18 270.20 5.20 40.26 319.57 40.26 271.20 6.20 43.96 416.05 43.96 272.20 7.20 47.37 520.66 47.37 273.20 8.20 50.56 632.82 50.56 274.20 9.20 53.55 752.04 53.55 Weir Flow Calculations Weer "uatian: Q = MP(h)'-', 0 =Capacity in CFS • P = Feet parimeler h = Read in Feet ` Weir Information Total perimeter of grate, PGRATE ••• Orifice Flow Calculations Orf ise Row Equation_ Q = O,6,4 2gh Q = Capacity in CFS A = Free open area of grate in aq_ R ` g = 32.2 (feet per 3erfsec) h = Head in feet ` Ori8ee Information Weff = 16.00 inches Leff = 33.00 inches P = 98.00 inches of Lweir = 100% (50% = flow from one direction) Clogging = 0% (used for weir & orifice) Peff = 8.17 feet P'eff = feet (with clogging) ir T-i 0 0 o H r 17 n t�• �r Unit open area for orifice equation (from Neenah) = 0.4 ftz per LF Aunit = 1.3333 ftz per LF AA,,,,,,, = 3.6667 ft z Atota1,eff = 3.6667 ft z : _ N Z O N W (n 9 CUI PN97470 - Page 58 of 64 cul 1 " DEPREssm 1 _7 . ,' �v SECTION G- rr� SECTION H-H z lit " 01� vrj� I N H im.-- mrm7 i -# i�H �w IF . PLAN OF GRATING CAST IRON it" i$ " it 16 aj.OW cv cv ar_6u SECTION E-E 3'-B" F --j I FI PLAN OF FRAME CAST IRON y ,c,,r n 1 ra T- 1/b 1 ,. , -.. ,, —Ti ,? I :fit i� R■ r� � - a 2: 1 cu EN 2--6- SECTION F-F z LL J L OnOm w a �C� V) Li C> J CC CC 7 � a Ln CD Lu m d W a to LU H � J U3 __j 1--L H W � W i� cn O ZD Q 0 U- 840.16 cul PN97470 - Page 59 of 64 CUI Erosion & Sediment Control Outlet Protection CUI PN97470 - Page 60 of 64 cul Channel Report Hydraflow Express Extension for AUtodeskS Civil 3DO by Autodesk, Inc. Tuesday, Sep 6 2022 OVERFLOW FROM CONTAINMENT TO BIORETENTION (OP-1) Circular Highlighted Diameter (ft) = 1.00 Depth (ft) = 0.58 Q (cfs) = 1.600 Area (sqft) = 0.47 Invert Elev (ft) = 264.00 Velocity (ft/s) = 3.38 Slope (%) = 0.50 Wetted Perim (ft) = 1.73 N-Value = 0.013 Crit Depth, Yc (ft) = 0.54 Top Width (ft) = 0.99 Calculations EGL (ft) = 0.76 Compute by: Known Q Known Q (cfs) = 1.60 Elev (ft) Section Depth (ft) 266.00 2.00 265.50 1.50 265.00 1.00 gyp 264.50 — 0.50 264.00 0.00 263.50 -0.50 0 1 2 3 cul Reach (ft) PN97470 - Page 61 of 64 cul Depth Q Area Veloc wp (ft) (cfs) (sgft) (ft/s) (ft) 0.10 0.053 0.041 1.29 0.64 0.20 0.223 0.113 1.98 0.93 0.30 0.494 0.198 2.49 1.16 0.40 0.850 0.294 2.89 1.37 0.50 1.268 0.395 3.21 1.57 0.60 1.698 0.493 3.44 1.77 0.70 2.113 0.588 3.59 1.98 0.80 2.462 0.674 3.65 2.22 0.90 2.685 0.745 3.60 2.50 1.00 2.518 0.785 3.21 3.14 Hydraflow Express - OVERFLOW FROM CONTAINMENT TO BIORETENTION (OP-1) - 09/6/22 1 cul PN97470 - Page 62 of 64 cul Yc TopWidth Energy (ft) (ft) (ft) 0.10 0.60 0.13 0.20 0.80 0.26 0.30 0.92 0.40 0.39 0.98 0.53 0.48 1.00 0.66 0.56 0.98 0.78 0.63 0.92 0.90 0.68 0.80 1.01 0.71 0.60 1.10 0.68 0.00 1.16 Hydraflow Express - OVERFLOW FROM CONTAINMENT TO BIORETENTION (OP-1) - 09/6/22 2 cui PN97470 - Page 63 of 64 Channel Report cul Hydraflow Express Extension for AUtodeskS Civil 31DO by Autodesk, Inc. BIORETENTION OUTFALL (OP-2) Circular Diameter (ft) = 1.00 Invert Elev (ft) = 262.40 Slope (%) = 0.50 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 1.90 Elev (ft) 264.00 263.50 263.00 262.50 262.00 261.50 Tuesday, Sep 6 2022 Highlighted Depth (ft) = 0.65 Q (cfs) = 1.900 Area (sqft) = 0.54 Velocity (ft/s) = 3.50 Wetted Perim (ft) = 1.88 Crit Depth, Yc (ft) = 0.59 Top Width (ft) = 0.95 EGL (ft) = 0.84 Section Depth (ft) .60 1.10 0.10 -0.40 1 1 -0.90 0 1 2 3 cul Reach (ft) PN97470 - Page 64 of 64