Loading...
HomeMy WebLinkAboutU-2519BA Sediment Loss on December 15, 2022From:Price, Gregory W To:Sprinkle, Hannah H; Hair, Sarah E CIV USARMY CESAW (USA); Alsmeyer, Eric C CIV USARMY CESAW (USA) Cc:Rerko, James J; Underwood, Chris; McGinness, Christopher H; Bullard, Jason M Subject:U-2519BA Sediment Loss on December 15, 2022Date:Friday, December 16, 2022 10:43:46 AM Attachments:image001.png Hannah/Liz/Eric, Project U-2519 BA experienced 1.0” of rainfall on December 15, 2022, much of it in short duration, resulting in loss of approximately 8 cu yds of sediment at Permit Site 3. Majority of the fill was contained within the designated permitted fill area but the stream has not been piped yet. Contract workers are in process of removing sediment with buckets and shovels. Details are provided in email below. Let me know if you have any questions. Thanks. Gregory W. Price, PWSDivision 6 Environmental Program SupervisorNorth Carolina Department of Transportation 910 364 0683 office919 914 1200 mobilegwprice2@ncdot.gov 431 Transportation Drive Fayetteville, NC 28302 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties._____________________________________________________________ From: Sutherland, James <James.Sutherland@rsandh.com> Sent: Friday, December 16, 2022 8:46 AM To: Price, Gregory W <gwprice2@ncdot.gov> Cc: Peterson, Benjamin <benjamin.peterson@rsandh.com>; CruzAlicea, Hector <Hector.CruzAlicea@rsandh.com>; Conoly, Roy <Roy.Conoly@rsandh.com> Subject: [External] C204110 BA Erosion Control CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam.  Good morning Greg, We had 1” of rain on the BA phase of the outer loop yesterday. We found an area of silt loss in the stream at station 375+25 LT/RT of -L- that flows toward permit site 3. Approximately 8cy of silt entered the stream and although the majority stayed on the project, we traced silt approximately 100 yards downstream. Per plans, permit site 3 starts LT -L- directly off the project limits. Branch Civil is currently removing the material with shovels and buckets. No other loss was observed. Please let me know if you have any questions or need anything else. Thanks, Sent from my iphone ​James SutherlandTransportation Technician2110 Fort Bragg Rd, Suite 108, Fayetteville, NC 28303910‑987‑1460James.Sutherland@rsandh.comrsandh.com | ​Facebook | Twitter | LinkedIn | Blog Stay up-to-date with our latest news and insights. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.