Loading...
HomeMy WebLinkAboutNCS000508_SW Permit DOSA_20221216NC Department of Environmental Quality Division of Energy, Mineral and Land Resources NORTH CAROLINA fnvtr®nmsntal Quality Stormwater Permit Delegation of Signature Authority Form Directions are in red. => This form shall be used to delegate signature authority from the permit Owner (Permittee) to another party. Only the Responsible Official defined below may submit permit applications and reports required by the permit (such as Data Monitoring Reports and Annual Reports) until this form is completed and submitted to the DEMLR Stormwater Program. Please note that delegating signature authority does not relieve the Permit Owner from the responsibility for permit compliance. The permit Owner is the legal entity to which/whom a permit has been issued, and may be an individual or an organization such as a company or government agency. Every Owner is required to have a Responsible Official who meets the legal signature authority requirements in 40 CFR 122.22summarized below: • For a corporation, the Responsible Official shall be a president, secretary, treasurer, or vice- president in charge of a principal business function, or another individual who performs similar functions for the corporation, or the manager of one or more manufacturing, production, or operating facilities who is authorized to make management decisions about the facility operation. • For a partnership or sole proprietorship, the Responsible Official shall be a general partner or the proprietor, respectively; or • For a municipality, State, Federal, or other public agency, the Responsible Official shall be either a principal executive officer [City/County Manager] or ranking elected official [Mayor]. => Even if delegated signatory authority has been delegated to another individual, the Responsible Official retains responsibility for compliance with permit conditions. Organization Name: Piedmont Triad Airport Authority Responsible Official Name: Kevin J. Baker Responsible Official Title: Executive Director Email Address: lBakerK@GSOair.org I Phone: (336) 665-5600 Mailing Address: 1000A Ted Johnson Parkway City: Greensboro I State: �NC I zip: 127409 Stormwater Delegation of Signature Authority Form Page 1 A. Persons to Receive Signatory Authority Tr►e slgnwupres of the pop sons listed below indicates their acceptance of signatory authority. Delegated Party Name: J. Alex Rosser, P.E. Delegated Party Title: Chief Operating Officer / (Owner Contact Person) Permit Number: NCS000508 Email Address: RosserA@GSOair.org I Phone: (336) 665-5600 Mailing Address: Piedmont Triad Airport Authority; 1000A Ted Johnson Parkway City: Gree sboro I State: NC I Zip: 27409 Signature of Delegated Party indicating acceptance of Signatory Authority: Date: 2 1 2 Jon Delegated Party Name: Stephen Rich, P.E. Delegated Party Title: Project Manager / (Facility, Permit, Billing Contact Person) Permit Number: NCS000508 Email Address: RichS@GSOair.org Phone: (336) 665-5600 Mailing Address: Piedmont Triad Airport Authority; 1000A Ted Johnson Parkway City: Green boro State: NC Zip 27409 Signature of Delegated Party indicating acceptance of Signatory Authority: Date: Ii ? U Delegated Party Name: Richard Darling Delegated Party Title: Project Manager - Environmental / (Electronic Signature Authority) Permit Number: NCS000508 Email Address: rdarling@mbakerintl.com Phone: (919) 481-5740 Mailing Address: Michael Baker International; 200 Centreport Drive Suite 350 City: Gre sboro I State: NC I Zip: 27409 Signature of Delegated Party indicating acceptance of Signatory Authority: Date: 12/16/2022 or Delegated Party Name: Delegated Party Title: Permit Number: Email Address: Phone: Mailing Address: City: State: T Zip: Signature of Delegated Party indicating acceptance of Signatory Authority: Date: Stormwater Permit Delegation of Signatory Authority Form Page 2 B. Responsible Official Signature The Responsible Official, as identified in accordance with 40 CFR 122.22, is the appropriate individual with the authority to sign and submit reports for the organization. As the Responsible Official, I, Kevin J. Baker have the authority to enter into this Agreement for Piedmont Triad Airport Authority (Owner/Organization Name). (printed name), I request that the DEMLR Stormwater Program include the persons listed in Part A of this form signatory authority for the above -named permit. I acknowledge that I, and the persons listed in Part A of this form work at/for my organization and have authority to act as a signatory for purposes of the NCDEQ's electronic document systems. By submitting this application, I, Kevin J. Baker (printed name), have read, understand, and accept the terms and conditions of the stormwater permit(s) for which I am the Responsible Official. Executive Director Title Signature Date Stormwater Permit Delegation of Signatory Authority Form Page 3