November 16, 2022
LETTER OF APPROVAL
D.R. Horton, Inc.
Attn: Tracey Davis, Division NPDES Administrator
2000 Aerial Center Parkway, Suite 110
Morrisville, NC 27560
RE: Project Name: Pinehurst South Cottages
Acres Approved: 14.36
Project ID: MOORE-2022-020
County: Moore City: Pinehurst Address: Blake Boulevard
River Basin: Cape Fear
Stream Classification: Other
Submitted By: LKC Engineering, PLLC
Date Received by LQS: November 2, 2022
Plan Type: Revised
Dear Ms. Davis:
This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter
of Approval. This plan approval shall expire three (3) years following the date of approval, if no land -
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not
perform adequately, a revised plan will be required (G.S. I I 3A-54. 1)(b).
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000
Construction General Permit. After the form is reviewed and found to be complete, you will receive a
link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive
the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this
project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI
form to Annette Lucas at danny.smith@ncdenr.gov or Paul Clark at Paul.clarkkncdenr.gov. After you
submit a complete and correct NOI Form, a COC will be emailed to you within three business days. A
$100 fee will be charged annually until a Notice of Termination is issued. This fee is to be sent to the
DEMLR Stormwater Central Office staff in Raleigh. If the owner/operator of this project changes in the
future, the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on
file at the job site:
1. The approved E&SC plan as well as any approved deviation.
Letter of Approval with Modifications
D.R. Horton, Inc.
November 16, 2022
Page 2 of 2
Northarolina Department of Environmental Quality � Division of Energy, Mineral and Land Resources
ati9 E;9Rt
�t��aRSI4 R�re s andproerties.If,fllowidetermined that e erosion anmentation control plan is inadequate to meet the requirements of the
office may require revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change
in the information included on the form. This permit allows for a land -disturbance, as called for on the
application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit
and would require a revised plan and additional application fee. In addition, it would be helpful if you notify
this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
ffJodi'Pace, EI
Regional Engineering Associate
DEMLR
Enclosures: Certificate of Approval
Modifications Required for Approval
NPDES NCGO1 Fact Sheet
cc: Philip Picerno, LKC Engineering, PLLC (electronic copy)
Scott Thomas, Building Code Official (electronic copy)
DEMLR - Fayetteville Regional Office File