Loading...
HomeMy WebLinkAboutNCC192693_NOT Closeout Documents_20221214North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Forsyth Project: Link Apartments 4th St River basin: Yadkin-PeeDee Person financially responsible: Grubb Properties - Paul UShaughnessy, Director Project #: FORSY-2019-041 Address: 4601 Park Road, # 450, Charlotte, NC 28209 1. Project Location: 4th St, Winston-Salem Pictures: No 2. Weather and soil conditions: 40's, sunny, workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Scott Young Title: Inspection report: Sent Report Date given/sent: December 02, 2022 9. Corrective action needed: 10. Comments: The site was inspected on December 2, 2022 to facilitate a site closure. All construction has been completed at the site and temporary erosion and sedimentation control measures have been removed. Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. If you have any questions, please contact the Winston Salem Regional Office or nate.gainer@ncdenr.gov or 336-776-9660. Reported by: Nate Gainer Others present: Date of inspection: December 02, 2022 Time arriving on site: 9:00 AM Time leaving site: 9:15 AM