HomeMy WebLinkAbout20221419 Ver 1_More Info Requested_20221025Baker, Caroline D
From: Smith, Cherri L
Sent: Tuesday, October 25, 2022 12:28 PM
To: david@tingenremodeling.com
Cc: bradofwest@gmail.com; Cohn, Colleen M; Thomas, Zachary T
Subject: Application for Riparian Buffer Authorization
Attachments: Example of a Single Family Impact Map.docx
Hi David,
We've received your application for a single-family Riparian Buffer Authorization and need some additional information
before this application can be processed.
We need a site plan showing what your projects consists of and how it overlaps into the riparian buffer. I'm sure a site
plan is something that you've already prepared for this project. It needs to show the riparian buffer associated with the
stream and its location on the property. The 50-foot riparian buffer consists of two zones: Zone 1 is the 30 feet closest
to the stream, and Zone 2 is the outer 20 feet. I've attached an example of a Single -Family Impact Map so you can see
that it's simple.
We also need to know the square footage of impact in Zones 1 and 2. Impacts in Zone 1 often trigger mitigation that is
paid for through an approved mitigation bank.
Feel free to email this additional information. Thank you.
Cherri
Chem Smith
Environmental Specialist (part-time)
Division of Water Resources
Raleigh Regional Office
3800 Barrett Dr.
Raleigh, NC 27609
919-791-4200
Single Family Impact Map
Impact Zone (21.31 Sq. I