Loading...
HomeMy WebLinkAboutNCS000251_SWPPP 4_20221207N �� permit No t4csow2s 1 AIVALVTICAL MONITORING REQUIREMENT, caimonitor~ monitori ofstormwater discharges shall be performed as z ni[oring will res $ shall be performed during a representative storm evetniedThe required in sb All the permit at c it in a minimum often analytical samplings bein -� storm water discharge outfall (SDO). g c°Mlucted over the term of A representative this save atoms event is a storm event that measures greater than 0.1 inches of rainfall. The time 72 hours. A sing event and tite previous storm event measuring it rains but stops bef °nn event may have a period of no precipitation greater up to �0 hours. For examplemust be at , roducin a disch reproducing any collectable discharge, a sam l ar c be ins within 10 hours. ' p e ma y be O°Ilected if the next rain Table 1. Anal vtical Monitorin Re uirements Discharge Characteristics Measurement Frequency) Sample Sample Non -Polar Oil & Grease / TPH Units T e2 Location3 EPA Method 1664 SGT-HEM mg/11, semi-annual Grab SDO Biochemical Ox � Y en Demand m semi-annual Chemical Oxygen D Grab SDO Nitrogen. errand m �- semi-annual Grab SDO g ,Total semi-annual Phosphorous mg� Grab SDO Total mg/L semi-annual Cresol, Total Grab SDO Phenol4 mg/L semi-annual Grab SWDBO mg/L semi-annual Grab SWDBO Formaldehyde4 semi-annual mg/L Grab SWDBO PH Total Rainfalls standard semi-annual Grab SDO inches semi-annual Rain _ Gauge Footnotes: 1 Measurement Frequency: Twice per year during a representative storm event. 2 Grab samples shall be collected within the first 30 minutes of discharge. 3 Sample Location: Samples shall be collected at all the stormwater discharge outfalls (SDO) including the stormwater detention basin outfall (S WDBO). 4 Monitor in stormwater detention basin (SWDB) prior to each storm event that could prompt discharge. The Chemetrics test and gas chromatograph analysis is recommended for detection of phenol and formaldehyde. Spray irrigation is required iftest results exceed 2. 0 mg/L for phenol or ].0 mg/L for formaldehyde. Spray irrigation treatment shall continue until samples show concentrations in the SWDB are below these thresholds. 5 For each sampled representative storm event the total precipitation must be recorded. An on -site rain gauge or local rain gauge reading must be recorded. The permittee shall complete the minimum ten analytical samplings in accordance with the schedule specified below in Table 2. A minimum of 60 days must separate Period 1 and Part I1 Page 5 of 10