HomeMy WebLinkAboutWLS Neuse 02 UMB, Scarborough Site (SAW-2017-02527) Year 2 Annual Monitoring Report Review and Credit Release RequestFrom: Davis. Erin B
To: Baker. Caroline D
Subject: FW: [External] WLS Neuse 02 UMB, Scarborough Site (SAW-2017-02527) Year 2 Annual Monitoring Report
Review and Credit Release Request
Date: Monday, December 12, 2022 3:00:24 PM
Laserfiche Upload: Email & Attachment
DW R#: 20180181 v.1
Doc Date: 11/10/22
Doc Type: Mitigation — Mitigation Information
Doc Name: General topic of email title
From: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil>
Sent: Thursday, November 10, 2022 10:29 AM
To: Tugwell, Todd J CIV USARMY CESAW (US)<Todd.J.Tugwell@usace.army.mil>; Kim Browning
<Kimberly.D.Browning@usace.army.mil>; Haywood, Casey M CIV USARMY CESAW (USA)
<Casey.M.Haywood@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Wilson, Travis W.
<travis.wilson@ncwildlife.org>; Bowers, Todd <bowers.todd@epa.gov>
Cc: Cara Conder <cara@waterlandsolutions.com>
Subject: [External] WLS Neuse 02 UMB, Scarborough Site (SAW-2017-02527) Year 2 Annual
Monitoring Report Review and Credit Release Request
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to Report Spam.
Good morning,
*Please Note — at this time, I am not planning an IRT site visit for Year 2, so please let me know if you
would like to conduct an on -site visit.
The below reference bank Sponsor has submitted an Annual Monitoring Report for NCIRT review,
and is requesting a release of credits. The Annual Monitoring Report has been posted to the RIBITS
Cyber Repository for the bank site (see link and instructions provided below). If you are unable to
access the document or prefer to have a hard copy mailed to you, please let me know as soon as
possible, and I will arrange to get you a copy of the report.
This review will follow the process outline for Credit Release Approval in the 2008 Mitigation Rule
(Section 332.8(o)(9)), which requires an IRT review period of 15 calendar days from the date of this
email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown
below. Comments provided after the 15-day comment deadline may not be considered. If you
would like to request a site visit prior to submitting comments, please notify me as soon as possible
but prior to the 15-day comment due date. If a site visit is required, the due date for IRT comments
will be extended to 15 days after the date of site visit. Once I have received a request for a site visit,
I will coordinate with the IRT and Sponsor to arrange for the on -site meeting; however, please note
that due to workload it may take a month or longer to arrange the meeting. Within 30 days of the
conclusion of the IRT review period (comment deadline), a copy of all comments will be provided to
the bank Sponsor and the IRT along with District Engineer's intent to approve or disapprove this
credit release.
Sponsor:
Water Land Solutions
Bank Name:
WLS Neuse 02 Umbrella Mitigation Bank
Site Name:
Scarborough Site
USACE ID:
SAW-2017-02527
River Basin:
Neuse
HUC:
03020202
County:
Wayne
Requested Credit Release: Year 2 Annual Monitoring
10% of the total stream restoration and enhancement credits: 1,086.3 Warm Water Stream Credits
10% of the total wetland restoration and enhancement credits: 10.97 Riparian Wetland Credits
15-Day Comment Start Date: November 10, 2022
15-Day Comment Deadline: November 25, 2022
45-Day Credit Release Approval Deadline: December 25, 2022
NOTE: Deadlines will be extended if an on -site meeting is requested.
Please be sure to log on to RIBITS before following the link below. Once in the Cyber Repository,
select the arrow beside appropriate folder to view and/or download the documents.
Cyber Repository Link: https://ribits.ops.usace.army.mil/ords/f?
a=107:278:17251627652425::: RP.278: P278 BANK I D:4886
I have also provided a link to videos that were too large for RIBITS: https://waterlandsolutions-
my.sharepoint.com/:f:/p/cara/Esrg02aTzbZAhO2Gazd2pTcBoxvQB50DvAWWsyt4UaJomg?
e=BMLAEA
Thank you and please contact me with any questions,
Sam Dailey (she/her)
Chief, Charlotte Regulatory Field Office
U.S. Army Corps of Engineers, Wilmington District
8430 University Executive Park Drive, Suite 615
Charlotte, INC 28262
Email: Samanth a.J.Dail eyna usace.army.mil
Cell: (704) 589-8397