HomeMy WebLinkAboutNCC224078_ESC Approval Submitted_20221212SWt ROY COOPER d r* w r Governor ELIZABETH BISER Secretary BRIAN WRENN°°"" Director NORTH CAROLINA Environmental Quality November 28, 2022 LETTER OF APPROVAL WITH MODIFICATIONS Land Acquisition and Development Services, LLC Attention: David Michaels, Company Agent PO Box 9147 Greensboro, NC 27429 RE: Project Name: Meadowview Glen Project ID: ALAMA-2023-011 Acres Approved: 9.96 County: Alamance City: Graham Address: Luthor Drive & Meadowview Drive River Basin: Cape Fear Stream Classification: WS-V; NSW, Lake Jordan Watershed Submitted By: BWA Date Received by LQS: November 14, 2022 Plan Type: Revised Dear Mr. Michaels: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The modifications required for approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Storinwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO10000 permit require that the following documentation be kept on file at the job site: r4ki— W North Carolina Department of Environmental Quality I Division of Energy, Mineral, and Land Resources Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27105 jg�IIEQ 336-776-9800 Letter of Approval with Modifications Land Acquisition and Development Services, LLC November 28, 2022 Page 2 of 4 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, �G Tamera Ep ' , PE Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval ec: James McGinley, PE [gmcginley@a borum-wade.com] Letter of Approval with Modifications Land Acquisition and Development Services, LLC November 28, 2022 Page 3 of 4 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Meadowview Glen Project ID: ALAMA-2023-011 County: Alamance Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: 1. Per Section 6.20 of the North Carolina Erosion and Sediment Control Planning and Design Manual, diversions that will stay in place longer than 30 working days should be seeded and mulched as soon as they are constructed to preserve dike height and reduce maintenance. [G.S. 113 A-57(2)] 2. The sediment basins should have flat bottoms to allow sediment laden water adequate spread across the bottom to increase opportunity for sediment deposition and lessening the chance of channel flow to the skimmer. [G.S. 113A-57(3)] 3. Concrete washout station and stockpiles should not be located within 50 feet of any storm drain, basin, or stream unless no alternative is feasible. [G.S. 143-215.1] 4. Double -row silt fence is not shown on the plans as requested in the Letter of Disapproval. Additionally, diversions do not function in lieu of silt fence and silt fence should be installed below the diversions. 5. Any off -site borrow and waste required for this project must come from a site with an approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. [15A NCAC 413,0110] 6. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] 7. The NCGO1 has a $100 yearly fee and our office often receives closure inspection requests days prior to yearly NCGO1 fee payment due dates. Be advised the project requires a closure inspection report by DEMLR prior to filing the Notice of Termination (NOT) to terminate NCGOI coverage. The closure inspection should not be requested until after the site has achieved full vegetative stabilization and measures have been removed. The removal of temporary ESC measures, including basins, requires prior approval. Often, a full growing season is necessary between initial seeding/mulching and removal of measures. Please plan your construction accordingly to avoid contacting our office prematurely for a closure Letter of Approval with Modifications Land Acquisition and Development Services, LLC November 28, 2022 Page 4 of 4 inspection. Also be advised you may be asked for representative site pictures prior to a closure inspection. [General Comment] 8. This letter constitutes approval with modifications. For inspection purposes, two copies of plans reflecting these modifications must be delivered to this office by January 2, 2023 or two weeks prior to the beginning of work, whichever date is earlier. [15A NCAC 4B .0107(c)] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities •� � c w CU P a� FS a� " .Poo y1 po lk o an W .P.m