Loading...
HomeMy WebLinkAbout20070295 Ver 5_20150127 Submittal to K Higgins_20150127J McaDAMs LETTER OF TRANSMITTAL To Ms Karen Hmains Raleigh Regional Office — Surface Water NC DENR - Division of Water Resources 1650 Mail Service Center, Raleigh, NC 27699 -1628 Re AMENDMENT to Neuse Buffer Authorization (DW R #07- 0295v4) South Lake at Holding Village I am sending you the following item(s) Date 0112.7 /V46 --A �i s tJ 6t (10 � 044 k,a,c-j Cap y Lv' �-4 C k. rr; S�►,4h PQr ket ,!- S rru c4wa. January 27. 2015 REGULAR MAIL Job No RAP -13020 `�GVn Iade1 COPIES DATE NO. DESCRIPTION 1 Signed Agent Authorization Form 1 Cover Letter 1 Figure 4 Overall Impact Ma Insets 1 -14 1 Previous /Pro osed Impact Inventor PCN) Table These are transmitted as checked below ❑ As requested ® For approval ❑ For review and comment Remarks Copy to ❑ For your use r Signed JJ // Kevin Yates Project Manager, Water Resources & Infrastructure Raleigh- Durham Charlotte 2905 Meridian Parkway 11301 Carmel Commons Blvd, Suite 111 Durham, North Carolina 27713 Charlotte, North Carolina (919) 361 -5000 (704) 527 -0800 Designing Tomorrows Infrastructure & Communities McAdamsCocom � 20 15 D 'J McADAMS MCAdamSCo.com Designing Tomorrow's Infrastructure & Communities January 25, 2015 Ms. Karen Higgins NCDWR -401 & Buffer Permitting Unit NC DENR - Division of Water Resources 1650 Mail Service Center, Raleigh, NC 27699 -1628 Re: Amendment to -Neuse Buffer Authorization DWR #- 07- 0295v4 South Lake at Holding Village Wake Forest, North Carolina RAP -13020 Dear Ms. Higgins: Per my conversation and request from Ms. Cherri Smith, of the NCDWR Raleigh Regional Office, enclosed is a summary of previously permitted and newly proposed riparian buffer imapcts associated with the project known as South Lake at Holding Village, within the Town of Wake Forest and drains to Smith Creek within the Neuse River Basin. 0 Signed Agent Authorization Forms 0 Fig.4- Overall Impact Map - Previously Permitted and Proposed Impacts (Insets 1 -14) • Riparian Buffer Authorization Form PREVIOUSLY AUTHORIZED IMPACTS: The property was originally to be developed by Planned Community Partners and East -West Partners in 2008 and a Neuse River Buffer Impact Permit was issued by DWQ on December 21, 2007, associated with the bridged road crossing and level- spreader impacts on the west side of the property (DWQ Project # 07- 0295vl/v2). However, due to economic conditions, the project was abandoned, and the property was purchased by a land holding company American Land Fund (ALF) in August 2011. In an effort to reduce liability and insurance on the property associated with the dam, a Nationwide Permit 3/ DWQ General Certification 3383, and The John R. McAdams Company, Inc. Neuse Buffer Authorization (DWR #07- 0295v3) was issued in 2012 in order to re -build the dam and bring it into compliance with NC Dam Safety. Raleigh / Durham, NC 2905 Meridian Parkway The most recent Neuse Buffer Authorization was issued on July 24, 2014, for Durham, North Carolina 27713 impacts associated with the proposed residential development, South Lake at (919) 361 -5000 Holding Village, located on the southside of Holding Lake (DWR #07- 0295v4). Table 1, below summarizes those previously permitted impacts, which include authorization for greenway and stormwater dissipater impacts. Please reference Charlotte, NC 11301 Carmel Commons Blvd, Figure 4, Insets 1 -11 for individual impact locations. Suite 111 Charlotte North Carolina 28226 (704) 527 -0800 MCAdamSCo.com Designing Tomorrow's Infrastructure & Communities Ms. Karen Higgins South Lake January 25, 2015 Page 2 of 5 Table 1: PREVIOUSLYAUTIIORIZED RIPARIAN BUFFER IMPACTS: * All Uses are Deemed Allowable within the Neuse River Riparian Buffer Rules Table of Uses. Table 2: CURRENTLY PROPOSED RIPARIAN BUFFER IMPACTS: ]IF Impact Location _ Inset 12 (perm) Impact Type 1 � s Impacts (square feet) Impact Location Impact Type Zone 1 / Zone 2 Inset 2 (perm) Greenway 1,290 1,347 Inset 3 (perm) Stormwater Dissipater 306 206 1 Inset 4 (perm) 1 Stormwater Dissipater 450 307 Insets 8,9,10,11 Greenway 11,496 25,295 (perm)(combined total) Total Zone 1 Impacts: 13,542 sf TOTALS Total Zone 2 Impacts: 27,155 sf * All Uses are Deemed Allowable within the Neuse River Riparian Buffer Rules Table of Uses. Table 2: CURRENTLY PROPOSED RIPARIAN BUFFER IMPACTS: ]IF Impact Location _ Inset 12 (perm) Impact Type 1 � s Impacts (square feet) Zone 1 / Zone 2 Pier Access 365 Inset 12 (perm) Greenway 2,552 Inset 13 (perm) Pier Access 249 Inset 14 (perm) TOTALS Pier Access 374 125 Total Zone 1 Impacts: 988 sf Total Zone 2 Impacts: 2,677 sf * All Uses are Deemed Allowable within the Neuse River Riparian Buffer Rules Table of Uses. RAP -13020 Ms. Karen Higgins South Lake January 25, 2015 Page 3 of 5 CURRENTLY PROPOSED IMPACTS: After realizing what an asset Holding Lake will be to future residents, WSR HV LLC would like to construct 3 piers that would give the residents safe access to the lake. At this time Holding Lake dam is currently under re- construction (which was previously permitted DWR #07- 0295v3) to bring it up to code per NC Dam Safety standards, and is an ideal opportunity to construct these piers while lake levels have been drawn down. Once the dam is re- constructed and the lake has filled up, the riparian buffer will be re- established around the lake edge, and an access through the riparian buffer will be required in order to access each of the three piers. PROPOSED IMPACTS: The access piers are proposed in three strategic locations which would allow for uniform access from the greenway and the amenity center, while maintaining the integrity of the dam. In order to accommodate the pier access, a portion of the greenway in front of the amenity center was modified, which altered the originally permitted location and slightly increased the buffer impacts in this location. Table 2, above and the paragraph below describe the currently proposed impacts. Pier Access (Buffer) Impacts (Fig 4: Insets 12 -14): The pier access locations are sited adjacent to the previously permitted greenway along the perimeter of the lake, so additional access trails through the buffer are not required to reach the proposed piers. Each of the pier accesses through the buffer are at near perpendicular angles and total 1,113 sf, with 988 square feet of impact in zone 1 and 125 square feet of impact proposed in zone 2. Each pier will be tied into the 300 -ft contour along the perimeter of the lake and will be constructed using wooden pilings and treated lumber, and are intended to be constructed while the lake is drained for repairs. The access from the pier to the greenway will be a boardwalk type of structure. The pier and access is considered to be a water dependent structure and an allowable use within the Neuse River Riparian Buffer Rules Table of Uses. RAP -13020 Ms. Karen Higgins South Lake January 25, 2015 Page 4 of 5 There are no impacts to jurisdictional streams and / or wetlands associated with the pier(s) construction. There will be no footer, foundation for the pier structure(s), or bulkhead placed below the normal pool of the lake, therefore no 404 permit will be required from USAGE. Greenway Impacts (Inset 1): In order to accommodate the pier access, a portion of the greenway in front of the amenity center was modified, which altered the originally permitted location and slightly increased the buffer impacts to zone 2, in this location, totaling 2,667 sf. The gradient is low to flat in most of the greenway locations and the greenway will be slightly crowned to allow for drainage to slope off on both sides of the greenway and diffuse the flow into the pond. The only water draining off the greenway is limited to what water falls onto the greenway, the remainder of the drainage flows from the project will be diffuse through level spreaders. There are no jurisdictional streams or wetlands within the project area and no stream or wetland impacts associated with the proposed project. AVOIDANCE and MINIMIZATION: Impacts to jurisdictional streams and wetlands have been completely avoided while impacts to stream buffers have been minimized to the maximum extent practicable. Retaining walls will be placed along the rear of the lots where needed to completely avoid riparian buffer impacts. The original trail layout was arbitrarily placed to stay mostly within Zone 2 of the buffer, however, the centerline of the trail was recently staked off out in the field by the applicant to avoid large diameter trees, while staying under the canopy of large species in currently open areas and lesser sloped areas. Although there are parallel buffer impacts along the edge of the pond in Zones 1 and 2, this is a better alternative than keeping the original trail alignment on the steeper slopes of Zone 2 and requiring more removal of native vegetation. The greenway bridge and stormwater dissipaters are angled at a near 90- degree angle minimizing riparian buffer impacts. RAP -13020 Ms. Karen Higgins South Lake January 25, 2015 Page 5 of 5 DIFFUSE FLOW: All stormwater flows within the project will flow in a diffuse manner through the riparian buffer. All stormwater within the project aside from the greenway will outlet through a level- spreader before discharging into the riparian buffer. The gradient is low to flat in most of the greenway locations and the greenway will be slightly crowned to allow for drainage to slope off on both sides of the greenway and diffuse the flow into the pond. The only water draining off the greenway is limited to what water falls onto the greenway, the remainder of the drainage flows from the project will be diffuse through level spreaders. There are no jurisdictional streams or wetlands within the project area and no stream or wetland impacts associated with the proposed project. Consideration of this project is greatly appreciated. If you should have any questions or require additional information, please do not hesitate to contact me at (919) 287 -0895. Sincerely, Mcadams Company Kevin Yates Senior Environmental Consultant Project Manager Enclosures RAP -13020 C. Previously Authorized Impacts Inventory 1. Buffer Impacts 1 a. Project is in which protected ® Neuse ❑ Tar - Pamlico ❑ Catawba basin? ❑ Randleman ❑ Jordan ❑ Goose Creek 1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Buffer impact Reason for Type of impact Stream name Buffer mitigation Zone 1 Zone 2 number - impact (exempt, allowable, required? impact impact Permanent (P) allowable w/ (sq ft) (sq ft) or Temporary mitigation) Inset 1 (perm) Pier Access Allowable Holding Pond ❑ Yes ® No 365 0 Inset 1 (perm) Greenway Allowable Holding Pond ❑ Yes ® No 0 2,552 Inset 2 (perm) Pier Access Allowable Holding Pond ❑ Yes ® No 249 0 Inset 3 (perm) Pier Access Allowable Holding Pond ❑ Yes E No 374 125 Total buffer impacts 988 2,677 C. CURRENTLY PROPOSED IMPACTS INVENTORY 2. Buffer Impacts 1a. Project is in which protected ® Neuse ❑ Tar - Pamlico ❑ Catawba basin? ❑ Randleman ❑ Jordan ❑ Goose Creek 1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. _ Buffer impact Reason for Type of impact Stream name Buffer mitigation Zone 1 Zone 2 number - impact (exempt, allowable, required? impact impact Permanent (P) allowable w/ (sq ft) (sq ft) or Temporary mitigation) T Inset 2 (perm) Greenway Allowable Holding Pond ❑ Yes ® No 1,290 1,347 Inset 3 (perm) Stormwater Allowable Holding Pond [-]Yes ® No 306 206 Dissipater Inset 4 (perm) Stormwater Allowable Holding Pond ❑ Yes ® No 450 307 Dissipater Insets 8,9,10,11 Greenway Allowable Holding Pond ❑ Yes ® No 11,496 25,295 ( perm) (combined) Total buffer impacts 13,542 sf I 27,155 sf Since 1979 -- THE JOHN R. McADAMS COMPANY, INC. AGENT AUTHORIZATION FORM All Blanks To Be Filled In By The CurrentPrayerty Owner Name: WSR HV, LLC c/o Reader and Partners, LLC, as Operator Manager: Mr. Scott La Address: 8480 Honeycutt Road - Suite 2.00, Raleigh, NC 27615 Phone: (919) 714 -7279 Project Name /Description: South Lake at Holding Village — Wake Forest, NC Project Number: RAP - 1302.0 I Project Manager: I Bill Derks/ Kevin Yates Date: March 19.2014 U.S. Army Corps of Engineers Attn: Mr. David Shaeffer Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Re: Wetlands Related Consulting and Permitting To Whom It May Concern: I, the current owner, hereby designate and authorize The John R. McAdams Company, Inc. to act in my behalf as my agent in the processing of permit applications, to furnish upon request supplemental information in support of applications, etc. from this day forward. This notification supersedes any previous correspondence concerning the agent for this project. NOTICE: This authorization, for liability and professional courtesy reasons, is valid only for government officials to enter the property when accompanied by The John R. McAdams Company, Inc. staff. You should call The John R. McAdams Company, Inc. to arrange a site meeting prior to visiting the site. Print for Prope Owner Signature Cc: Ms. Karen Higgins NCDENR -DWQ 512 North Salisbury Street Raleigh, NC 27604 C I V I L E N G I N E E R I N G . L A N D P L A N N I N G • S U R V E Y I N G PO Box 14005 s Research Triangle Park, NC 27709 • (919) 361 -5000 • fax (919) 361 -2269 www.johnrmcadams.com Since 1979 i THE JOHN R. McADAMS COMPANY, INC. AGENT AUTHORIZATION FORM Name: ALF Holding Village, LLC c/o Kella Brasfield Address: 1001 Chestnut St., Suite 101, Philadelphia, PA 19107 Phone: (215) 599 -2180 Project Name/Description: Holding Village Pro ert -- Wake Forest NC Project Number: RAP -11010 Project Manager: I Bill Derksl Kevin Yates Date: June 12, 2012 U.S. Army Corps of Engineers Attn: Mr. James Lastinger Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Re: Wetlands Related Consulting and Permitting To Whom It May Concern: I, the cuxxent owner, hereby designate and authorize The John R. McAdams Company, Inc. to act in my belyalf as my agent in the processing of permit applications, to furnish upon request supplemental information in support of applications, etc, from this day forward. This notification supersedes any previous correspondence concerning the agent for this project. NOTICE: This authorization, for liability and professional courtesy reasons, is valid only for government officials to enter the property when accompanied by The John R. McAdams Company, Inc. staff. You should call The John R. McAdams Company, Inc. to arrange a site ;meeting prior to visiting the site. print for /Property Owner Signa e Cc: Ms. Lauren Witherspoon NCDENR -DWQ 512 North Salisbury Street Raleigh, NC 27604 C I V I L E N G I N E E R I N G • L A N D P L A N N I N G • S U R V E Y I N G PO Box 14005 • Research Triangle Park, NC 27709 • (919) 361 -5000 ■ fax (919) 361 -2269 www.johnrmcadams.com .Irr VICINITY MAP Wo R PREVIOUSLY PERMITTED BUFFER IMPACTS ZONE 1 BUFFER IMPACT ZONE 1 ZONE 2 SHEET 1 LEVEL SPREADER EXHIBIT (NO IMPACTS) SHEET 2 1,290 1,347 SHEET 3 306 206 SHEET 4 450 307 SHEET 5 LEVEL SPREADER EXHIBIT (NO IMPACTS) SHEET 6 LEVEL SPREADER EXHIBIT (NO IMPACTS) SHEET 7 LEVEL SPREADER EXHIBIT (NO IMPACTS) SHEET 8 11,496 25,295 SHEET 9 SHEET 10 SHEET 11 TOTAL 13,542 27,155 PROPOSED BUFFER IMPACTS ZONE 1 BUFFER IMPACT ZONE 1 ZONE 2 SHEET 12 365 2,552 SHEET 13 249 0 SHEET 14 374 125 TOTAL 988 2,677 -rte, I� N m 1 ,I 1 I % I I ---------- Qr ' - = Cj CL �- w � � c IVy,ZQJOa V' 9 1 IN 1. OWNER / APPLICANT: ALF HOLDING VILLAGE, LLC. WSR HOLDING VILLAGE, LLC C/O READER AND PARTNERS, LLC 2. PROPERTY: DB 9235, PG 1661 OF THE WAKE COUNTY REGISTRY NCDOT PLANS FOR PROJECT # R -2809C 3. TOTAL PROPERTY AREA: 258 4. TOTAL PROJECT AREA: 96.93 ACRES 5. STREAM AND WETLANDS ORIGINALLY VERIFIED BY MR. JAMIE SHERN OF USACE ON 11 -06 -06 AND RE- VERIFIED BY MR. JAMES LASTINGER OF THE USACE ON 08 -15 -2012 (AID: SAW 2012 - 01298) 6. NEUSE RIVER STREAM BUFFERS VERIFIED BY MR. ERIC KULZ OF NCDWQ ON 02 -12 -07 AND IS STILL VALID PER NC DEVELOPMENT EXTENSION (SB831) LEGEND: STREAM FEATURE R WETLANDS PREVIOUS PERMITTED IMPACTS ZONE 1 BUFFER IMPACT ZONE 2 BUFFER IMPACT c p IMPACTS ZONE 1 BUFFER IMPACT ® ZONE 2 BUFFER IMPACT Qr ' - = Cj CL �- w � � c IVy,ZQJOa V' 9 1 IN 1. OWNER / APPLICANT: ALF HOLDING VILLAGE, LLC. WSR HOLDING VILLAGE, LLC C/O READER AND PARTNERS, LLC 2. PROPERTY: DB 9235, PG 1661 OF THE WAKE COUNTY REGISTRY NCDOT PLANS FOR PROJECT # R -2809C 3. TOTAL PROPERTY AREA: 258 4. TOTAL PROJECT AREA: 96.93 ACRES 5. STREAM AND WETLANDS ORIGINALLY VERIFIED BY MR. JAMIE SHERN OF USACE ON 11 -06 -06 AND RE- VERIFIED BY MR. JAMES LASTINGER OF THE USACE ON 08 -15 -2012 (AID: SAW 2012 - 01298) 6. NEUSE RIVER STREAM BUFFERS VERIFIED BY MR. ERIC KULZ OF NCDWQ ON 02 -12 -07 AND IS STILL VALID PER NC DEVELOPMENT EXTENSION (SB831) LEGEND: STREAM FEATURE R WETLANDS PREVIOUS PERMITTED IMPACTS JURISDICTIONAL FEATURES WITHIN TOTAL PROPERTY 1. TOTAL RIPARIAN WETLAND ACREAGE: 0.98 ACRES 2. TOTAL STREAM LENGTH: 7,584 LF 3. TOTAL PERENNIAL STREAM CHANNEL LENGTH: 5.552 LF 4. TOTAL INTERMITTENT STREAM CHANNEL LENGTH: 2,023 LF JURISDICTIONAL FEATURES WITHIN PROJECT AREA 1. TOTAL RIPARIAN WETLAND ACREAGE: 0.57 ACRES 2. TOTAL STREAM LENGTH: 3,972 LF 3. TOTAL PERENNIAL STREAM CHANNEL LENGTH: 1,940 LF 4. TOTAL INTERMITTENT STREAM CHANNEL LENGTH: 2,032 LF NOTES: 1. PROFILES ARE NOT FOR CONSTRUCTION. 2. FINAL LOCATION OF PIER(S) TO BE DETERMINED BY OWNER. 3. ON -STIE GEOTECHNICAL ENGINEER AND /OR CONTRACTOR SHALL EVALUATE SITE CONDITIONS AND DETERMINE APPROPRIATE DEPTH OF PILINGS, MATERIALS, STRUCTURAL INTEGRITY OF PIER(S) AND ASSOCIATED STRUCTURES. 0 GRAPHIC SCALE 200 0 100 200 400 1 inch = 200 ft. PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION cf) o o U�`d�� a U d- go ;8 z. pU Viz° nsg " 04 .=i h o ODD VJ � A V z 0 00 W W Q Q O z � � WO z 0 di O V a IMM4 4 A O 0 x PROJECT N0. RAP -11001 FILENAME: RAP 11001 X DESIGNED BY: - DRAWN BY: - SCALE: 1 = 200' DATE: 01-19-2015 SHEET NO. FIG. 4 �� MCADAMS ZONE 1 BUFFER IMPACT ZONE 2 BUFFER IMPACT PROPOSED IMPACTS ZONE 1 BUFFER IMPACT ® ZONE 2 BUFFER IMPACT JURISDICTIONAL FEATURES WITHIN TOTAL PROPERTY 1. TOTAL RIPARIAN WETLAND ACREAGE: 0.98 ACRES 2. TOTAL STREAM LENGTH: 7,584 LF 3. TOTAL PERENNIAL STREAM CHANNEL LENGTH: 5.552 LF 4. TOTAL INTERMITTENT STREAM CHANNEL LENGTH: 2,023 LF JURISDICTIONAL FEATURES WITHIN PROJECT AREA 1. TOTAL RIPARIAN WETLAND ACREAGE: 0.57 ACRES 2. TOTAL STREAM LENGTH: 3,972 LF 3. TOTAL PERENNIAL STREAM CHANNEL LENGTH: 1,940 LF 4. TOTAL INTERMITTENT STREAM CHANNEL LENGTH: 2,032 LF NOTES: 1. PROFILES ARE NOT FOR CONSTRUCTION. 2. FINAL LOCATION OF PIER(S) TO BE DETERMINED BY OWNER. 3. ON -STIE GEOTECHNICAL ENGINEER AND /OR CONTRACTOR SHALL EVALUATE SITE CONDITIONS AND DETERMINE APPROPRIATE DEPTH OF PILINGS, MATERIALS, STRUCTURAL INTEGRITY OF PIER(S) AND ASSOCIATED STRUCTURES. 0 GRAPHIC SCALE 200 0 100 200 400 1 inch = 200 ft. PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION cf) o o U�`d�� a U d- go ;8 z. pU Viz° nsg " 04 .=i h o ODD VJ � A V z 0 00 W W Q Q O z � � WO z 0 di O V a IMM4 4 A O 0 x PROJECT N0. RAP -11001 FILENAME: RAP 11001 X DESIGNED BY: - DRAWN BY: - SCALE: 1 = 200' DATE: 01-19-2015 SHEET NO. FIG. 4 �� MCADAMS =374 �_ -- \ STREAM FEATURE "A° TOTAL -LENGTH: 377 LF \ v 3i �/ _ \ \_ — 6 � \\ \ \ \\ \ \y Xx WETLAND AREA "A"' I- j9 / / \� )� _ 0.36 ACRES � — — — 324 326 /'1 L�; J� W D WETLAND AREA "B" — — — \ 0.02 ACRES \\ z 0 x GRAPHIC SCALE 50 0 25 50 100 1 inch = 50 ft. PROJECT rro, RAP -11001 HOLDING VILLAGE T1 JOHN RA 5 coMPAY, INC. r FILENAME: RAP11001 X n > tj SCALE: „ IMPACT MAPS 2905 _ Meridian _ 50, 1 Durham. No Carolina 227713 DATE' WAIF FOREST, NORTH CAROLINA MCADAMS Idcenae No.: G0293 Isoo)93&5846•M�°a=m�'o "' 04 -24 -2014 SHEET 1 HOLDING— — — \ \ \ \ \ \ \ \\ \ \ \ \ \ems \ \ \ \ LAKE hI� \— \\ \ \ NEUSE RIVER BUFFER ZONE 1 PERMANENT IMPACT = 374 SF I \ NEUSE RIVER BUFFER ZONE 2 \� � PERMANENT IMPACT = 125 SF 8 IJ \ 0 �u� \ \ \ \ \ \ \ \ \ \\ \ \ \ PREVIOUS PERMITTED IMPACTS uV I N G� LI G E ® ZONE 1 BUFFER IMPACT LD ZONE 2 BUFFER IMPACT z PROPOSED IMPACTS 29a5 _ Meridian x Durham. No Carolina 227713 GRAPHIC SCALE WAIF FOREST, CAROLINA ZONE 1 BUFFER IMPACT: 374 SF 50 0 25 50 100 SHEET 14 ET 14 ZONE 2 BUFFER IMPACT: 125 SF 1 inch = 50 ft. 00 rEOaECT rro, RAP -11 001 uV I N G� LI G E W T1 JOHN RA 5 coMPAY, INC. r FILENAME: RAP11001 X LD n > tj SCALE: „ IMPACT MAPS 29a5 _ Meridian _ 50, 1 Durham. No Carolina 227713 DATE' 01-19-2015 WAIF FOREST, CAROLINA MCADAMS Idcenae No.: G0293 (s00) 73&5846 • M�°a =mom 0'— SHEET 14 ET 14 X 4 - -� — __256/ i NEUSE RIVER BUFFER ZONE I � / PERMANENT IMPACT = 1,290 SF',,, AVA Q \ p5iqo \ ZONE 2 \,� - - - - -/ — — — — - -� ZONE 1 // o, STREAM FEATURE "C2" _ A- UNNAMED TRIBUTARY TO ) \ \ \ y SMITH CREEK 562 LF \ GREENWAY BRIDGE _ \ — - NEUSE RIVER BUFFER ZONE 2 �\ \ \ SPANNING 20 LF OF PERMANENT IMPACT = 1,347 SF \ \ _ STREAM (SEE EXHIBIT) � 50' NEUSE RIVER &\ \ \ WAKE FOREST \ STREAM BUFFER ® ZONE 1 BUFFER IMPACT: 1,290 SF z ZONE 2 BUFFER IMPACT: 1,347 SF x GRAPHIC SCALE 50 0 25 50 100 1 inch = 50 ft. rEOaECT rro, RAP -11001 HOLDING VILLAGE T1 JOHN RA 5 coMPAY, INC. r FILENAME: RAP11001 X n > tj SCALE: „ IMPACT MAPS 2905 _ Meridian _ 50, 1 Durham, No Carolina 227713 DATE' WAIF FOREST, NORTH CAROLINA MCADAMS Idce No.: C-020 (800)733- 5W- McAdamsCo.cam 04 -24 -2014 SHEET 2 i NEUSE RIVER BUFFER ZONE 2 - PERMANENT IMPACT = 205 SF / l j� HOLDINq Pi ND I I I III ( II �' 11 I II I II IIII \ \I � II I I I 111 I II \ I I I I I I I \II I II 1 1\ II II II 1 II II II � I �I NEUSE RIVER BUFFERI ZONE 1 1 \ 1 1\ \� E \1 1 \ \ \\ ERMANENT \IMPA \ \ 306 SF\ \ \ \ \ 1 SP VALE� \ \ \ \ \ 50 FT NEUSE STREAM BUFFER \ \ ® ZONE 1 BUFFER IMPACT: 306 SF ZONE 2 BUFFER IMPACT: 206 SF I II \ —Z 1� z I i z 0 x GRAPHIC SCALE 50 0 25 50 100 1 inch = 50 ft. =moo OJECT NoRAP -11001 u, \/ /��j j� T �A LD I N � LI G E T1lE JOHN R, INCA 5 coMPANY, uac. RAP11001 X i i V \..A G�FILENAME: CALE: „ IMPACT MAPS _ _ _ 50, 1 Durham. No Carolina 227713 ATE' WAIF FOREST, NORTH CAROLINA MCADAMS Idcenae No.:'020 (soo)7335846•M�°a =m�o.cam 04 -24 -2014 SHEET 3 50' NEUSE RIVER & WAKE FOREST \ \ \ \ \\ \ \\ \ \ \ \ \ \I 1 \ \ \ \\ STREAM BUFFER \\ \ \\ \ \\ \\ \ \\ 1 I I I 1 111 \ \ \\ \\ - 32� \ \ NEUSE RIVER BUFFER ZONE 1 I I I \ \ \ � PERMANENT IMPACT\ — \ 0 \ \�\ \\ HOLDING P ND _ \ NEUSE RIVER BUFFER ZONE 2 a PERMANENT IMPACT = 307 SF \ \ \ \\ \ \ \ b\ \\ \\ \ \ IF \I \ \ \ LEVEL\ S \RE�DER LD ul I \ N X33° I I I \ IMPACTS FROM o� GREENWAY TRAIL \ °> \ \ \ \ \ \\ (SEE SHEETS 5 -7) \ \� ZONE 1 BUFFER IMPACT: 450 SF z ZONE 2 BUFFER IMPACT: 307 SF x GRAPHIC SCALE 50 0 25 50 100 I I I I 1 inch = 50 ft. J rEOaECT rro, Z RAP -11 001 uV LD I N G� LI G E T1 JOHN RA 5 coMPAY, INC. r'n FILENAME: RAP11001 X tj SCALE: „ IMPACT MAPS Meridian _ _ 50, 1 Durham. No Carolina 227713 DATE' WAIF FOREST, NORTH CAROLINA MCADAMS Idce No.: C-020 (800)733 -,646• McAdamsCo.cam 04 -24 -2014 SHEET 4 \ \ - -- \ 50' NEUSE RIVER &— WAKE FOREST STREAM BUFFER Jr 31 c,, 3 6 L- -2`ONE 2 —��� \ \ \ I j l l j I ••af\ _ ��,�_� �� / I I SWMF AI \ \30\ \\8 J/ LEVEL SPREADER x z 0 .3 GRAPHIC SCALE 50 0 25 50 100 1 inch = 50 ft. rEOaECT rro. Z RAP -11 001 uV LD I N G� LI G E W T1 JOHN RA 5 coMPAY, INC. r'n FILENAME: RAP11001 X > tj SCALE: „ IMPACT MAPS 29a5 _ Meridian _ 50, 1 Durham. No Carolina 227713 DATE' WAIF FOREST, NORTH CAROLINA MCADAMS Idcenae No.: G0293 (s00)73&5846• M�°a =m�0'- 04 -24 -2014 SHEET 5 1/1 \ \ / LEVEL SPREADER 1 ,1-, \` \j\ � \ \ � y z 0 x GRAPHIC SCALE 50 0 25 50 100 I I I I 1 inch = 50 ft. =moo OJECT NoRAP -11001 u, \/ /��j j� T �A LD I N � LI G E T1lE JOHN R, INCA 5 coMPANY, uac. RAP11001 X i i V \..A G�FILENAME: CALE: „ IMPACT MAPS _ _ _ 50, 1 Durham. No Carolina 227713 ATE' WAIF FOREST, NORTH CAROLINA MCADAMS Idcenae No.:'020 (soo)7335846•M�°a =m�o.cam 04 -24 -2014 SHEET 6 268 \ \ 26 � j III I X111 1 282 11111 I 1 IMPACTS FROM \ /IIII 111 11 I 1 GREENWAY TRAIL SEE SHEET 2) 1� � 24 1 I 2s \ \ \ \ `\ S W \M � C\ I LEVEL SPREADER \ SE RIVER & 50' NEU WAKE FOREST STREAM BUFFER x z 0 .3 GRAPHIC SCALE 50 0 25 50 100 1 inch = 50 ft. rEOaECT rro, RAP -11 001 uV LD I N G� LI G E W T1 JOHN RA 5 coMPAY, INC. FILENAME: r' RAP11001 X n > tj SCALE: „ IMPACT MAPS 29a5 _ Meridian _ 50, 1 Durham. No Carolina 227713 DATE' WAIF FOREST, NORTH CAROLINA MCADAMS Idcenae No.: G0293 (soo)73&5846• M�°a =m�0'- 04 -24 -2014 7 SHEET 7 ��\ \ \\ \ ✓ \ \ ��� HOLDING POND REUSE RIVER BUFFER ZONE 1 GREENWAY - i PERMANENT IMPACT (TYP.) = 11,496 SF TOTAL — NEUSE RIVER BUFFER ZONE 2 GREENWAY_ _ / / PERMANENT IMPACT (TYP.) = 25,295 SF TOTAL CD 29 \ �. \'�. • \�' Sl gal \a�\ 31� \ �\ — — ��— — 1 324 -- � 22 310 312 — \ i \ \ o \ \ \ \ \ I 2,9 / CP \20 \ i \ \ \\ \ \\ \\ \ / \\ \ \ \ \\ \\ �\ Lo _ LLJ \ 332 \ — — \ \ \ \ \ \ \ 3/ \ \ \ ul _ _ x �p TOTAL BUFFER IMPACTS FOR GREENWAY ZONE 1 GREENWAY BUFFER IMPACT: 11,496 SF TOTAL GRAPHIC SCALE 50 0 25 50 100 ZONE 2 GREENWAY BUFFER IMPACT: 25,295 SF TOTAL 1 inch - 5C ft. a' V e z s f- y � r , O X O E O O o 'n a II Q a _ o O z w w Z m 'J McADAMS SHEET�6 / % 1\ \\ \ \�LA T L�NE\ \ \ \ SHEET 5 I\ \ \ \ \ \ \ \ -.HOLDING POND NEUSE RIVER BUFFER ZONE 2 GREENWAY \ \ PERMANENT IMPACT (TYP.) = 25,295 SE TOTAL \ NEUSE RIVER BUFFER ZONE 1 GREENWAY I PERMANENT IMPACT (TYP.) = 11,496 SF TOTAL 274 x-29 1 _ \ / / ZONE 1 298 ( / _ --oo� __�/ / �� // // / l l� �✓ / / // l/ / �l lj/ / �l 298 �� o ONE 2/ ' / ✓ / / / % / �// / / /�/ / / / / / N / /� /� / 8 302 / / / � / / / / / /��/ � / / r\ ( / / /// / / / // // /'�/ l l � l lNl �l l \ \ l` /�✓ / `� // X286 //Y U'v Zi- �p TOTAL BUFFER IMPACTS FOR GREENWAY ZONE 1 GREENWAY BUFFER IMPACT: 11,496 SF TOTAL GRAPHIC SCALE 50 0 25 50 100 ZONE 2 GREENWAY BUFFER IMPACT: 25,295 SF TOTAL 1 inch 5C ft. a' V e z - _ Y FD x o E 0 ON o 'n a II Q a _ o O z w w z m 'J McADAMs INFUSE /RIVER /BUFFER ZONE 2 GREENWAY PERMANENT IMPACT (I YP.) = 25,295 TOTAL \ / HOLDING PO IC OIE 12 111 11~ NEUSE RIVER BUFFER ZONE 1 GREENWAY I I 1 \1 1�1 PERMANENT IMPACT (TYP.) 11,496 SF TOTAL/ �� - I - - -- - _ - - - -- - -- - _ ___ ___ _________ _ I \ 1 /jll T w!wJ1 ��, i /- /1flllll��l /��- - - - - -- I I I I \ 1 I I 1 1 I 1 I 1 \ \\ - �3ir� TOTAL BUFFER IMPACTS FOR GREENWAY (a ® ZONE 1 GREENWAY BUFFER IMPACT: 11,496 SF TOTAL GRAPHIC SCALE 50 0 25 50 100 ZONE 2 GREENWAY BUFFER IMPACT: 25,295 SF TOTAL 1 inch = 5C ft. z d � U f- ti r- INS FD x o E 0 ON o 'n a- a II Q a o O z w w z m 'J McADAMs - -- ' I HOLDING POND NEUSE RIVER BUFFER ZONE 2 GREENWAY PERMANENT IMPACT (TYP.) = 25,295 SF TOTAL LONE-/l ICI ICE DI \ /CD DI ICCCD 7r1NIC 1 ('D CCNI IAIA V i ADDITIONAL ZONE 2 IMPACT ASSOCIATED WITH GREENWAY EXTENSION FROM DAM TO AMENITY CENTER : + 4,937 SF TOTAL BUFFER IMPACTS FOR GREENWAY ® ZONE 1 GREENWAY BUFFER IMPACT: 11,496 SF TOTAL ZONE 2 GREENWAY BUFFER IMPACT: 25,295 SF TOTAL / i i a GRAPHIC SCALE 50 0 215 50 100 1 inch = 50 ft. U �N U � N � r a � � A U =F t� o X � � � N � Q I � � v 0 z z 4 E- U � d z w a w v A iJ MCADAMS ZONE 2 �__^- =c•1 i y / / / CA z0N f1 t. I NEUSE RIVER BUFFER 4 ZONE 1 PERMANENT IMPACT = 365 SF/ I 1 NI USE RIVER BUFFER ZONE 2 PERMANENT IMPACT = 2,552 SF `.`�, / / i ► � I �/ � / 1/f 'A1 �I � // 1/ /f � /l l � f i / HOLDING LAj KE I f PREVIOUS PERMITTED IMPACTS ZONE 1 BUFFER IMPACT l \ r {^ ZONE 2 BUFFER IMPACT l l l j \, \, \� 'j, 1, 1 �[;' 1; PROPOSED IMPACTS GRAPHIC SCALE ZONE 1 BUFFER IMPACT: 365 SF � 5C7 0 25 50 1(3U v !{r ZONE 2 BUFFER IMPACT: 2,552 SF 1 inch = 50 ft. L— PROJECT NO. RAP -11001 HOLDING VILLAGE l�JORR coMen.INC. FILENAME: RAP11001X [] SCALE: IMPACT MAPS 2905 Meddles PedkwW Durham, North CetoUm 27719 1 50' �./�7�y. WAKE FOREST NORTH CAROLINA Lttx n No.: C-0299 (900) 7936849 �hSu5rinmeCn.cam vii DATE: 01 -19 -2015 SHEET 12 MCADAMS LAKE G \ \ \ \ NEUSE RIVER BUFFER ZONE 1— \ PERMANENTIMPACT = 249 SIF — — — — — --,ZONE \\ i/ PREVIOUS PERMITTED IMPACTS ® ZONE 1 BUFFER IMPACT z ZONE 2 BUFFER IMPACT x PROPOSED IMPACTS GRAPHIC SCALE ZONE 1 BUFFER IMPACT: 249 SF 50 0 25 50 100 ZONE 2 BUFFER IMPACT: 0 SE iiiiiiiiiiiiiiiiiiiiiillill iiiiiiiiiiiiiiiiiiiiiillillill 1111111111111 MI ="mm" 1 inch 50 ft. J No. RAP -11001 ILENAME: HOLDING VILLAGE 1I-lE JOHN R McADAMS COMPANY, INC. RAP1 1 001 X GPROJECT CALE: " IMPACT l�/,[APS _ _ 1 - 50' nurlLe -. N Camlina 27713 ATE' 01 WAKE FOREST, NORTH CAROLINA MCADAMS license No.: G0 O9 (800)733 -5W MckLi wCo.cm -19 -2015 SHEET 13