Loading...
HomeMy WebLinkAbout20150122 Ver 1_CAMA Application_201501272 0 1 5 0 1 22 NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Donald R van der Vaart Governor Secretary MEMORANDUM TO Ms Cyndi Karoly Env Biological Supervisor Division of Water Quality Wetlands Unit FROM Daniel Govom Major Permits Processing Coordinator Coastal Management Division 400 Commerce Avenue Morehead City NC 28557 DATE 26 January 2015 SUBJECT CAMA Application Review APPLICANT: River Forest Partners, LLC Respond to Daniel Govoni Morehead City Office PROJECT LOCATION Project site is located at 738 East Main Street at the River Forest Manor Property adjacent Pantego Creek in the Town of Belhaven, in Beaufort County, North Carolina PROPOSED PROJECT Applicant proposes to replace dock B 8'x 232', and 9 slips and a 10'x 40'L- head platform, replace a damaged 10'x 60' fuel dock and add a 4' x 24' and 3 pilings for one additional slip on existing dock A Applicant proposes to repair existing buildings Please indicate below your position or viewpoint on the proposed project and return this form by 16 February 2015. Please contact R Kelly Spivey at 252- 948 -3853, if you have any questions regarding the proposed project When appropriate, in depth comments with supporting data are requested REPLY This office has no objection to the project as proposed This office has no comment on the proposed project This office approves of the proposed project only if the recommended changes are incorporated See attached This office objects to the proposed project for reasons described in the attached comments Signed Date 943 Washington Square Mall, Washington, NC 27889 D Phone 252 - 946 -6481 1 FAX 252 - 948 -0478 Internet www nccoastalmanage F!EJA 7 An Equal Opportunity 1 Afrmative Action Employer — Made in part by recycled paper DIVISION OF COASTAL. MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME River Forrest Partners LLC 2 LOCATION OF PROJECT SITE Project site is located at 738 East Main Street at the River Forrest Manor property adjacent Pantego Creek in the Town of Belhaven, in Beaufort County, North Carolina. Photo Index - 2006 116 -8445, R -6 2000 116 -1464, S -6 1995 116 -1268, F -7 State Plane Coordinates - X 2,710,000 Y 657,200 Belhaven Quad (lower left corner) 3 INVESTIGATION TYPE CAMA 4 INVESTIGATIVE PROCEDURE Dates of Site Visit —12 December 201 Was Applicant Present — Yes 5 PROCESSING PROCEDURE Application Received — 26 January 2015' Office - Washington 6 SITE DESCRIPTION (A) Local Land Use Plan - Beaufort County Land Classification From LUP — Municipal District (B) AEC(s) Involved PTA (D) Water Dependent Yes (D) Intended Use Commercial (E) Wastewater Treatment Existing - Town Sewer System LJ A i �4 Y, '7 rT, BUFF f e Y Planned - N/A (F)Type of Structures Existing - Piers, docks slips, marina house, restaurant/bed and breakfast, riprap revetment and boat ramp Planned - Replace existing Dock B and add 9 new slips with associated tie pilings, finger piers, and new L -head platform, replace fuel dock and add three tie pilings and finger pier to Dock A for one additional slip (G) Estimated Annual Rate of Erosion Unknown 7 HABITAT DESCRIPTION [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (B) Non - Vegetated Wetlands Pante o Creek Bottom 3,432 ft2 (C) Other (D) Total Area Disturbed 3,432 ft2 (0 08 acres) (E) Primary Nursery Area No (F) Water Classification SC NSW Open No 8 PROJECT SUMMARY The applicant proposes to replace Dock B 8'x 232', add 9 slips and a 10'x 40'L- head platform, replace a damaged 10' x 60' fuel dock and add a 4' x 24'and 3 tie pilings for one additional slip on existing Dock A Applicant proposes to repair existing buildings River Forrest Partners LLC River Forrest Marina Town of Belhaven Pantego Creek Beaufort County Project Setting The developed 4 34 acre project site known locally as the River Forrest Manor is located at 738 East Main Street within the Town of Belhaven on its east side adjacent Pantego Creek in Beaufort County, North Carolina The site is developed as a mixed commercial business that once offered a restaurant, bed and breakfast and commercial marina with dockage, fuel and a marina store The restaurant and bed and breakfast have been out of service for several years The marina has continued its operations at a diminished level, providing some overnight dockage mainly to transient vessels off the Atlantic Intracoastal Waterway The project site is situated in an area that both residential and commercial development The Town of Belhaven has zoning ordinances The project site is zoned Marine Business The entire project site is uplands, with no wetlands at the site Development is centered around the large distinguished Victorian style mansion built in the center of the property in the early 1900s Vehicular access to the mansion is by an asphalt driveway and parking area Other associated infrastructure includes a large attached open wooden deck, a tennis court and swimming pool There is a smaller building adjacent the restaurant/bed and breakfast that housed employees of the B and B but currently is used as short term room rental to the public The marina is situated in a dredged basin with a dredged access channel off the federal channel offshore in Pantego Creek The dredged basin is located 500' upstream of the federally maintained wooden breakwater at the mouth of Pantego Creek Major CAMA Permit No 244- 88 issued on 8 December 1988 authorized a 100' extension and maintenance of an existing 500' long riprap breakwater on the east side of the dredged basin as well as maintenance excavation of the existing basin to a final depth of 8' below the normal water level (NWL) Existing water depths in the basin average 8' below the NWL and range from minus 4 5' to 12' in depth There are two existing piers /docks in the dredged basin Dock A is 8' x 300' with 13 existing formalized slips with associated tie pilings and Dock B is 8' x 232' with 8 existing formalized slips with associated tie pilings Dock B has suffered some storm related damage and has aged structurally to the point that it has become unsafe /unusable for its intended purpose There is also a 10' x 60' fuel /dingy dock at the base of Dock A that has suffered storm damage and all that remains are some pilings and stringers There is an open wooden deck at the base of Dock A as well as the marina office building Landward of the marina office are the above ground fuel tanks and an equipment shelter There is an existing marine pumpout on Dock A Wastewater from boats as well as from the existing buildings is handled by the Town of Belhaven sewer system The project site shoreline is stabilized with a riprap revetment constructed out of broken concrete There is an existing boat ramp adjacent to the fuel /dingy dock Pantego Creek is designated as Inland Waters by the Wildlife Resource Commission The Environmental River Forrest Partners LLC Pantego Creek Beaufort County Page Two Management Commission classifies Pantego Creek as SC NSW This area is closed to shellfishing Project Description The applicant is proposing to revitalize the existing mansion for the purpose of hosting weddings and other social gatherings There is no other new upland development planned other than restoration and maintenance of the existing facilities The applicant proposes to improve the marina facilities by completely replacing Dock B 8' x 232' and adding a 10' x 40' L -head platform at the waterward end The applicant proposes to construct 8 - 4'x15' finger piers servicing 17 proposed slips (8 existing and 9 new) The slips will be 18' wide x 38' long, similar in length as the existing slips Two of the slips will have 13' x 13' boat lifts The slips on Dock B will be for long term rental The applicant proposes to improve Dock A by adding 1 - 4'x24' finger pier, one new slip and three new tie pilings The 10' x 60 fael/dmgy dock will be replaced Anticipated Impacts Once complete, the project will increase boat traffic in the area and the associated environmental impacts The additional finger piers and platform will increase the shaded impact to Pantego Creek bottom by 796 ft' Steve Trowell — Washington Regional Office — 22 January 2015 January 5, 2015 Mr Steve Trowell Coastal Management Field Rep Division of Coastal Management 943 Washington Square Mall Washington, North Carolina 27889 Re River Forest Manor & Marina Belhaven, NC Dear Steve, River Forest Partners LLC, a group of local citizen investors, purchased the River Forest Manor and Marina (located at 738 E Main Street, Belhaven, NC) on October 23, 2014 We have already started renovating the marina office building which includes the marina restrooms We should complete the renovation of this building this month We have installed a new roof on both the Manor house and the 3 unit block building behind the Manor We will be installing new windows in both buildings this month We are going to renovate both buildings, taking the restaurant kitchen out of the Manor and converting it to a catering kitchen The Manor will no longer have a restaurant We are going to be a wedding / special event venue utilizing catering services for food We will continue to operate the marina offering both fuel sales and transit rental on Dock A and long term slip rentals on Dock B We will use the existing fuel and pump out facilities on Dock A We will not be building any new buildings or parking facilities We do, however, want to replace the existing 8 slip Dock B adding 9 new slips, two of which will have boatlifts and add a 10' x 40' platform at the end of Dock B On Dock A, we want to add a finger pier and one slip We also want to rebuild the dingy /small boat fueling dock at the base of Dock A We require no new signage / channel pilings or need any dredging Please call / email me with any questions We are going to restore the River Forest Manor, Belhaven's famous landmark to its former grandeur, helping both the Town of Belhaven and eastern Beaufort County's economy Sincerely, cf C Brantley Tillman River Forest Partners, LLC 738 E Main Street Belhaven, NC 27810 mem W -1 L =� Is x �� �'• � � 3P ss5l ��% x `'.Y � "�� �iF G ! k Ll ?k I rc a xs ia- aa �� J+ I�S� s � � f� �� P1 6 � '�� ,.„�'� pia` +. �..� � ��� � � - -. *'•� n � ; 7w, ��� f #� w:�l�ct 't I, • -v; '�`+fw �. ktl�4-451I�'++I�� "' �; �:'� p�, .sue (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information , Business Name River Forest Partners, Llc Project Name (if applicable) River Forest Marina Applicant 1 First Name Charles MI B Last Name Tillman Applicant 2 First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed Mailing Address 738 East Main Street PO Box City Belhaven State NC ZIP 27810 Country USA Phone No 252 - 943 - 0030 ext FAX No - - Street Address (If different from above) City State ZIP Email dockmaster @nverforestmarina com 2. Agent/Contractor Information v = Business Name N/A Agent/ Contractor 1 First Name MI Last Name Agent/ Contractor 2 First Name MI Last Name Mailing Address PO Box City State ZIP Phone No 1 - - ext Phone No 2 - - ext FAX No Contractor # Street Address (if different from above) City State ZIP Email <Form continues on back> 252 - 309 -2308 .- T :. e;rva�u.r��wa�s� nsar���c�ee��.n�wt 'Foy m DCM MP -1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd # Beaufort 738 East Main Street d Approximate elevation of tract above NHW (normal high water) or Subdivision Name City State Zip River Forest Marina Belhaven NC 27810- Phone No Lot No (s) (if many, attach additional page with list) 252 - 943 - 0030 ext N /A, , , , a in which NC river basin is the project located? b Name of body of water nearest to proposed project Tar /Pamlico Pantego Creek c Is the water body identified in (b) above, natural or manmade? d Name the closest major water body to the proposed project site ®Natural ❑Manmade ❑Unknown Pungo River e Is proposed work within city limits or planning jurisdiction? f If applicable, list the planning jurisdiction or city limit the proposed ®Yes ❑No work falls within Yes, Belhaven 4. Site Description a Total length of shoreline on the tract (ft ) b Size of entire tract (sq ft ) 642' +/- 4 34 acres c Size of individual lot(s) d Approximate elevation of tract above NHW (normal high water) or N /A, I I NWL (normal water level) (If many lot sizes, please attach additional page with a list) 5' ❑NHW or ®NWL e Vegetation on tract Scattered pine trees and maintained lawn grass f Man -made features and uses now on tract Existing residence (former B &B), Marina office, above ground fuel tanks, existing Dock A and Dock B g Identify and describe the existing land uses adjacent to the proposed project site Residential h How does local government zone the tract? i Is the proposed project consistent with the applicable zoning? Marine Business (Attach zoning compliance certificate, if applicable) ®Yes ❑No ❑NA j Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k Hasa professional archaeological assessment been done for the tract? If yes, attach a copy ❑Yes ED% ❑NA If yes, by whom? I Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> 252 -838 -2806 .. i -ESa RCOPS aEf���a .a��oc��st�lc�����c�eatecat.�e� Forin DCM MP -1 (Page 3 of 4) AI'MIWi1IVN iui Mayor Development Permit m (i) Are there wetlands on the site? ❑Yes ®No (n) Are there coastal wetlands on the site? [-]Yes ®No (m) If yes to either (i) or (n) above, has a delineation been conducted? [-]Yes ®No (Attach documentation, If available) n Describe existing wastewater treatment facilities Existing Town sewer o Describe existing drinking water supply source Existing Town water p Describe existing storm water management or treatment systems None - surface run off 5. Activities and Impacts a Will the project be for commercial, public, or private use? ®Commercial ❑Public/Government ❑Private /Community b Give a brief description of purpose, use, and daily operations of the protect when complete Dock A provides dockage, fuel and pumpout for transit boats Dock B will be for long term slip rentals c Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored Use standard marina pile driving equipment for dock replacement, repair and new construction as per cross sections shown on sheets 2, 3, 4 and 5 d List all development activities you propose Replace Dock B and add 9 additional slips with 10'x40' landing /platform at the end of pier Replace small boat dock and add one finger pier and slip to Dock A e Are the proposed activities maintenance of an existing protect, new work, or both? Both f What is the approximate total disturbed land area resulting from the proposed project? None ❑Sq Ft or ❑Acres g Will the proposed protect encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h Describe location and type of existing and proposed discharges to waters of the state / ?6n 074 ga i Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No [DNA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ®NA I Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal <Form continues on back> 2 5 2 - a G a - 22 9 0 a .. 1- 888-4RCOAST .n Form DCM MP -1 (Page 4 of 4) AYYLR.A 11UN 101 Major Development Permit 6. Additional Information In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application package to be complete Items (a) — (0 are always applicable to any major development application Please consult the application instruction booklet on how to properly prepare the required items below a A project narrative b An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale Please give the present status of the proposed project Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed c A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site d A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties e The appropriate application fee Check or money order made payable to DENR f A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mad Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management Name Adam O'Neal Phone No 252 - 943 -5939 Address 693 Water Street, Belhaven, NC 27810 Name Axson Smith Phone No 252 - 945 -5579 Address 810 E Main Street, Belhaven, NC 27810 Name Phone No fi Address g A list of previous state or federal permits issued for work on the project tract Include permit numbers, permittee, and issuing dates N/A h Signed consultant or agent authorization form, if applicable i Wetland delineation, if necessary I A signed AEC hazard notice for projects in oceanfront and inlet areas (Must be signed by property owner) k A statement of compliance with the N C Environmental Policy Act (N C G S 113A 1 -10), if necessary If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application The project will be subject to the conditions and restrictions contained in the permit I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up monitoring of the project I further certify that the information provided in this application is truthful to the best of my knowledge Date `' t} Print Name 2` \1C -�, '\--Z i-.. -e S �— ?a, e C •� a v, e ��� \tl vv'c, ~\ t W \�V\h t= QZ Signature Please indicate application attachments pertaining to your proposed project ❑DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts ❑DCM MP -3 Upland Development NZbCM MP -4 Structures Information 252 -808 -2805 .. 11- 888 -4RCO ST :. ;rrwv4.rccoasta1mana9eiment.net Form ®CM MP-4 (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Mayor Permit, Form DCM MP -1 Be sure to complete all other sections of the Joint Application that relate to this proposed project Please include all supplemental information 9. _ DOCKING FACILITY /MARINA CHARACTERISTICS El This section not applicable a (i) Is the docking facility /marina b (i) Will the facility be open to the general public? ®Commercial ❑Public/Government ❑Private /Community ®Yes ❑No c (i) Dock(s) and /or pier(s) d (i) Are Finger Piers included? ®Yes ❑No (u) Number 2 If yes r (m) Length 60' , (n) Number 9 , (iv) Width 8', 10' (iii) Length it j (v) Floating []Yes ®No (iv) Width 4' (v) Floating []Yes ®No e (i) Are Platforms included? ®Yes ❑No f (i) Are Boatlifts included? ®Yes ❑No If yes If yes (u) Number 1 at end of Dock B (u) Number 2 (iii) Length 40' (m) Length 13' (iv) Width 10' (iv) Width 13' (v) Floating ❑Yes ®No Note Roofed areas are calculated from dnpline dimensions g (i) Number of slips proposed h Check all the types of services to be provided 10 ❑ Full service, including travel lift and /or rail, repair or (u) Number of slips existinq maintenance service Dock B - 8, Dock A-13 ❑ Dockage, fuel, and marine supplies ® Dockage ( "wet slips ") only, number of slips ❑ Dry storage, number of boats ❑ Boat ramp(s), number of boat ramps ® Other, please describe Existing Marine pumpout i Check the proposed type of siting ❑ Land cut and access channel ❑Open water, dredging for basin and /or channel ®Open water, no dredging required ❑Other, please describe existing dredged channel to basin k Typical boat length 40' m (i) Will the facility have tie pilings? ®Yes ❑No (u) If yes number of tie pilings? 1+—A�' Describe the typical boats to be served (e g , open runabout, charter boats, sad boats, mixed types) Average size vessel 35' to 45' Will service vessels from 18' to 100' + I (i) Will the facility be open to the general public? ®Yes []No Z152-S08-2,S08 :. 1- 888- 4RCOAST K: �ev-lsed= 12 /2TIGS 2. DOCKING FACILITY /MARINA OPERATIONS El This section not applicable a Check each of the following sanitary facilities that will be included in the proposed project ® Office Toilets ® Toilets for patrons, Number 2, Location Existing Marina Office Building ® Showers ® Boatholdmg tank pumpout, Give type and location Existing Marina Office, Pumpout of Dock A b Describe treatment type and disposal location for all sanitary wastewater Existing municipal sewer service from Town of Belhaven c Describe the disposal of solid waste, fish offal and trash Trash Service Town of Belhaven d How will overboard discharge of sewage from boats be controlled9 Signage for pumpout, vessel monitoring by dockmaster e (i) Give the location and number of "No Sewage Discharge" signs proposed 3 - one at marina office and one at base of each dock (u) Give the location and number of " Pumpout Available' signs proposed 3 - one at marina office and one at base of each dock f Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products N/A g Where will residue from vessel maintenance be disposed of'? N/A h Give the number of channel markers and "No Wake" signs proposed No new markers i Give the location of fuel - handling facilities, and describe the safety measures planned to protect area water quality Existing fuel facilities, no additions proposed / What will be the marina policy on overnight and live- aboard dockage No live - aboards, overnight dockage for transient boats k Describe design measures that promote boat basin flushing? N/A I If this project is an expansion of an existing marina, what types of services are currently provided? Expansion of number of slips m Is the marina /docking facility proposed within a primary or secondary nursery area? ❑Yes ®No 252 - 808 -2808 :: ` -638 4RCOAST revs see. 1227/06 Foy Ln w DCM G P-4 (StrUCftCTG -S, [ange 3 of 4) n Is the marina /docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ED% o is ine marina /OOGKIlly IdUllty NiuPUaau wui nn vi —J—u a a_..,, (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected ❑CW ❑SAV ❑SB OWL ®None p Is the proposed marina /docking facility located within or within close proximity to any shellfish leases? ❑Yes ®No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease 3. BOATHOUSE (including covered lifts) ®This section not applicable a (i) Is the boathouse structure(s) ❑Commercial ❑Public/Government ❑ Private/Comm unity (n) Number (m) Length (iv) Width Note Roofed areas are calculated from dnplme dimensions 4. GROIN (e g, wood, sheetpile, etc If a rock groin, use MP -2, Excavation and Fill) ®This section not applicable a (i) Number (u) Length (iii) Width 5. BREAKWATER (e g, wood, sheetpde, etc) _ This section not applicable a Length b Average distance from NHW, NWL, or wetlands c Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS [09 This section not appbcable a Is the structure(s) ❑Commercial ❑Public /Government ❑Private /Community c Distance to be placed beyond shoreline Note This should be measured from marsh edge, if present e Are of the swing 7. GENERAL b Number d Description of buoy (color, inscription, size, anchor, etc ) 252- &08.2808 :, I- SB84RC tTST -. gee; rev:s a, 1212T/03 F:wm 0CM NW-4. Page 4 of 4) a Proximity of structure(s) to adjacent riparian property lines 38' from west side, 80' from east side Note For buoy or mooring pthng, use arc of swing Including length of vessel c Width of water body 3,450' e (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (u) If yes, explain what type and how they will be implemented b Proximity of structure(s) to adjacent docking facilities +150' d Water depth at waterward end of structure at NLW or NWL g'+ Dock A, 7' Dock B 8. OTHER 1K] This sect iIon not applicable a Give complete description S - ?,o vS Date River Forest Marina Project Name, River Forest Partners, LLC Applicant Name V\/-\ k� Applic nt Si natur-ee�_ e V.,�b C- -996-4 ant.�et revised: 12127/06 Adam O'Neal 693 Water Street Belhaven, N C 27810 Mr Steve Trowell NCDENR 943 Washington, N C 27889 Washington, NC 27889 Dear Mr. Trowell, I have reviewed the attached pier improvement proposal by River Forest Partners, LLC and have no objection Sincerely, Adam O'Neal - S3NIl NV'IVdi® —. n0q S T, e v 'Motzr tiE* Fs 0 °�4 ®44p41441A @�'BPtdd; ®�ry����� 0 F +F a I • C! Ilk PIA 11 e�� od ao art ah �rl !1 _a tit er k l� y rj fl d i `G� O O .. �} 1 vm.�..r. ` l w �. �e *�.,``• ,,,L�». ^c9e ` :�, p�0�.s Lj i Fri r�`�9 N �S3NIl N'dl2!`dd18 b'W`dO_ IPA m a , 1 oo Ou Mr. Axson Smith 810 E Main Street Belhaven, N C 27810 Mr. Steve Trowell NCDENR 943 Washington, N C 27889 Washington, NC 27889 Dear Mr Trowell, I have reviewed the attached pier improvement proposal by River Forest Partners, LLC and have no objection. Since ely, Axs Smith M °49,82072 S m � lb. ® ®�de�b�OBppU��d0oo09gggv �+ All A Ga lop kell RA vt d- a„ E o nii'i u`? .� �� �� ',p��` ySaNI -I NVINW18 VWd� „L 6� 49 �� �+ J tp �� 2S or, b tt t 11 I ee Yr gz ) 0 6 j < 2 o (6 c saw 'k v VI ESN. -A ex, ' i V� r t, A `A gw -141 i f t t 3 e�r�-- rsm.Nt _ � __ ,,.-tt{ •�'t', i «...,.�,�s....nasc, :art 1 t j � • i 1 I r i � t f r F 2 ' n ' Le .� t d t t E y ~�5 F Win,; - P ' Win,; - IV" fit tyl �J 4✓ �'�„ h� OYD V Pb m G+ Cr 'f7 h Il�i'y� -;`iii wMtpo. Pr Fg 00 s. ell u OIL 1�1 IT H Wlc Li; DUO to Out C)C)m iu Z-t W Z U-j t: rz. z Z=2 O:z �-Ln M \ \ M-11 X l CI \ \ g FEN '•iii d9I ice— _ /^ .a. FiR I., TOWN OF BELHAVEN \ �/ �M13]> _ \ \H13 l 1 ZONING All C . {y SAO FRA r � 7 / 021 � I aim Or � KillV R p��o0 IDG SO. WAY IN, PU elm •� pia a° Thal map shall eery as the Official Zoning Map for the town of Belhaven, North Carolina and �� i •• a shag replace ad previous maps. This n1op adopted by the Belhaven Town Counca WX � J P 7-1_."�. V-11 FM M in ILL M�_N' N2720 0 Y W -1 WATER USE DISTRICT R -5 RESIDENTIAL R -510 RESIDENTIAL MOBILE HOME RA RESIDENTIAL /AGRICULTURAL GS GENERAL BUSINESS HB HIGHWAY BUSINESS I INDUSTRIAL MB MARINE BUSINESS ® PRIMARY FIRE DISTRICT AEC AREA OF ENVIROMENTAL CONCERN RAILROAD RIGHT —OF —WAY mm iP. 1 i 0 ENGINEERS PLANNERS SURVEYORS = _ JARVIS ASSOCIATES9 P.A. 930 E. SECOND STREET WASHINGTON, NORTH CAROLINA 27889 (252) 974 -7794 --------ZONE BOUNDARY _ --------TOWN BOUNDARY ��� °_' _,_ _,_,_,_ ETI BOUNDARY , RAILROAD I 1 h / ! f ESTUARINE SHORELINE (7$' SETBACK) 1 1: 1000 0 1000 2000 " ® e q �s f� /'� Scale 99 1 0009 Scale ! 1 1 mm iP. 1 i 0 ENGINEERS PLANNERS SURVEYORS = _ JARVIS ASSOCIATES9 P.A. 930 E. SECOND STREET WASHINGTON, NORTH CAROLINA 27889 (252) 974 -7794 °52" s7° EPiC S02003'f6'E WE HEREBY CERTIFY THAT WE ARE THE OmERS OF THE PROPERTY SHOYN, AND DESCRIBED HEREON, X3401 IS LOCATED IN THE SUBDIVISION JURISDICTION OF THE 3.45` -; � 1E 4' TIE TOM OF BELHAVEN AND THAT VE HEREBY ADOPT THIS PLAN OF SUBDIVISION %1TH CRY OUR FREE CONSENT AND ESTABLISH td' IMUM BUILD114G SETBACK LINES AS t � 11, QIP � -�. �,. � DATE OWNER �^ Mz. SET CC PP �. r5P1lf Ai 64 �', ` OWNER 's 40 oma. MCiNITY SKETCH' � Q' (NOT TO Ste )�V s _ A'LEGEND OAU INE lop t ` 4.34 a d ar �3 A %ER DpSwmv =t THr 19 CCCJ47 �!A 9R SFT dh ° :% 1 i^ tiu K nPS ArO PaAff a PP R'ir'eYF wA$' }EBL MINIMUM Bd/I1iidFdG LINE � ;+ °EXISTING FOUND IRON £ r JAQ �, , .'• BPIPELO IKWAIaA Etna 3F OiiE OVc' EAD Poi# BLOCK 1°TALI„ A,Pd£1 40, z �o :�. Qtr /0.43' FROM LDtiE OF PP POMR POLE SIDE1tAi tt LP unrar POLE CMTROL CORNER � � r f / AS 44LT 5Tr2t1CTti4 :� o c:t rS pf c f s�1r Tu#xJULIAN GOFF chi DB 1781 PG 45 r ASPHALT % Sx#siTrr � pC,'s .. Extslrsrr - . s :?ueT>c ..- PHALT f r 34..44` TIE r PCD1'i1D1 DFk4;#E1i11 STREET -. g'AXSt# SMITH AS SHOWN CDS•° AN UNRECORDED 05E w 176 '140 SU-,, 'Y T1TLED'F 1�E TIE " s, U CTS Cry of A.s�i.TY SMTH AM VA - DATED 10-28-11969. THIS APEA IS ALSO CLAIMED 3Y 'Par. ,� SdR ONLINE ,60AM W, ONEAL AS TRACT 2 PER CDS 14.69 PG $33 S ix� y a '+ y_ ,,:;,f `:tP a•' .f> ASP"ALT JU f{ 4 S yt fP OAT La. d Ai CK WOOD DECK �; �' oma.. ,' °fie• -'� °Of E S 2 k0i t,.z� �• i�11gr4 N Y tJ C.3 VIP 6 �� '" �� `moi �'.'�t.�'�-�b� Cij^•�-� #�fi' 4 A r;{'d�p j;, tea{ a '� lu ssc z t'fi.'"i! a �' d"k �,PILE Cryp" ALONG PANTEGO CREEK FROM A TO 183 SEARING LENGTH N64a18'02AW 52.24' N7 -51'27- 28.50' N84041*14'W 19,841 S63%8114"w 11.85= S24004'20'W 115.72' N66005'05`W 33.10, N6[*44'39'W 15.90` N67001'01" 39.12' N76f50%7"W 21.21° N88045°34' 2.91'' S89057'03"'W 9.16` s 3 77°02'{ 311 28.13' N65*25 53"W 48,51, N57°2 08'W 27.83' FTd54...0.,,.,6*38,.......,...�Y* 28.8551 N7904.4'03" 28.79' N61°05'37'W 26.60' N47008`04*W 13.46* [::N06°.5f5� 7.145: BEEENRENCES D81856 PG 864 ESTATE FILE 05-176 LES 327 PG 389 DD 591 PG 787 DB 787 PC 4.65 UNRECORDED MAP ENTITLED "PROPERTIESOF AXTON SMITH AND VAFE" DATED I0-28--69. n. 'I elk i�.F3iA_ G0,1. CREEK g�iE tTYP1 � .._.... k t t, I `� SCALE: 1 = 50' 1.6"�` q.,` �".`�'R� �'3 + Si'ita�: �.% (%j -� l i.. 4 4*z ,.¢. @ p ��4 'E""? y 'Y fa,S. 4�{dusax .d1V$�.x'4. �»�$ 4.L i.o'I ' r s � ; ti REVISED 12/10/14: �LEI a 'S NAME —CHANGED T STATE OF NORTH cARWNA L r,1124 $' els ADDED O S O THE PORTIO OF RSR VIEN TOWNOFiA EN � STREET THAT .ABU'T'S THE RIVER. I CERTIFY THAT THE. SUBDI4TSION PLAT _gHCVIN HEREON HAS BEEII IRE TOM��,��` �c t r � a FOUND TO CWPLY ATH THE StISDIMSOF REGULA11ONS �� � �' OF BI='I EA'�° N AND WAS Af' ' 0"r BY WE TOWN BOARD J&&�_ �� �� If3loth, 201&?x3IJER iOXt' E T Y 2 -MAP IS H .� I ,k � NAL PLAN` FOR TOM DANA DATE RIVER RES GERM . ,. PtiE iTYFj PARTNER L MyM frFEST PARTNERS, LLC ° 1004 WAC`%` FOREST ROAD I c s..;tv 27604 "CURRENT OWNER -- RIATER FOREST PARTNERS, IAC NLMS17R LOTS. � BEING A PORION OF GPIN #7605-97-7667 ACRZAGE .'} LOT: .. , , .3 AC TOWN OF 1, 3 3 � F �N,S C 'Tr'y T T< ` f h' S Stil-i -E&MS A P �� D La f �1 €�€ s LAND STIP THE AHIM OF A C NSY to HUNOPAUTY F -AREA ^ALCULATED BY COORDINATES 6 , i � �� TOWNSHIP �y THAT WS AN OR£'fMiCE 't` l � �" .Y ���Crz S � € 3I i 1. iRlAdek€€ t,�: BUILDING Uiti3S UNLESS OT�s�2 � i<OTE7° � -STREET RIGHTS OF WAYS I DETER&tINEtD BY �" °� Ia # ° A. mjNIh9l,tVt FRONT' YARD $ETSAC K IS' EXISTING IRONS p^ �AND IMPROVEMENTS. B. D9ilddDst_IM SIDE SACK M V -R#P AN LIMES WERE DELENIATED BY STEVE TROT LL � C 7� � COUNTY D. MINIMU7.,V REAR YARD SETBACK IS THE CURRENT & APPROVE -0 ON $,4t'Y 10th, 2013. i.3 w WATER 04 SBA FROM A 1I 5Ofl= NORTH CAROLINA WATER flL;t'tS3M 2. Se e*; ' ZQFA4 , IS MARNE WSINESS SURVEYED: LV9 � 2013 L NDA E GASKINS, CERTIFY THAT INS PLAT WAS DRAM UNDER MY 3, T: =RapmTY is LOCATM IMIKN :A SPECIAL. PERMV FRO.LP A <AJRVEY MADE UNDER DRY SUPERVISION (DEED HAZAZ� >:A AV L�CMP7t RECORDED IN BOOK �. PAS ), €HAT THE � - SCALE g " ' MVM,, R n T S � :- w^�. EPNRLY 1NDICATED AS DRAl�i:�i MOM Bt €' � "� _ =1 F 1 S .__.._., P THAT THE RATIO OF &cF - i 37A457&C, 20 I PfOUS04 � • _-TGTMw3+z TIM_f T`HM 1--u WAS %: C31'rE DATE .. , ... , .SAY 1 2303 ST€xTE ?zf E LAND gq C 3C}23 a 5 7SD AS CMINe aMAVENASK N .i._3,�"3. a '� D 'bf°TNFSS MY ORIGINAL StaWIIURE, REGISTRATION NUMBER Me ALCERTIFY REViOFFICER OF CRAVEN COUNTY, C R7IFY —�) Ei N g P.A. THIS 10LDAY OF "E A E20I3 IHE ERTFCTON IS AFFIXED TTHI Py§TO MEEETS ALL STATUTORY REQUIRDAENTS FOR RECORDING PROFES SIONAL LAND SURVEYING utDAtt E. �Iu� L-,�- PO Box 354Phone: 252-24-4--0599 DATE Voeoro" NC 28586 Fax: 252-24-4-5899