HomeMy WebLinkAbout20150122 Ver 1_CAMA Application_201501272 0 1 5 0 1 22
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Pat McCrory Donald R van der Vaart
Governor Secretary
MEMORANDUM
TO Ms Cyndi Karoly
Env Biological Supervisor
Division of Water Quality Wetlands Unit
FROM Daniel Govom
Major Permits Processing Coordinator
Coastal Management Division
400 Commerce Avenue
Morehead City NC 28557
DATE 26 January 2015
SUBJECT CAMA Application Review
APPLICANT: River Forest Partners, LLC
Respond to Daniel Govoni
Morehead City Office
PROJECT LOCATION Project site is located at 738 East Main Street at the River Forest Manor
Property adjacent Pantego Creek in the Town of Belhaven, in Beaufort County, North Carolina
PROPOSED PROJECT Applicant proposes to replace dock B 8'x 232', and 9 slips and a 10'x 40'L-
head platform, replace a damaged 10'x 60' fuel dock and add a 4' x 24' and 3 pilings for one additional
slip on existing dock A Applicant proposes to repair existing buildings
Please indicate below your position or viewpoint on the proposed project and return this form by 16
February 2015. Please contact R Kelly Spivey at 252- 948 -3853, if you have any questions regarding the
proposed project When appropriate, in depth comments with supporting data are requested
REPLY This office has no objection to the project as proposed
This office has no comment on the proposed project
This office approves of the proposed project only if the recommended changes
are incorporated See attached
This office objects to the proposed project for reasons described in the attached
comments
Signed Date
943 Washington Square Mall, Washington, NC 27889 D
Phone 252 - 946 -6481 1 FAX 252 - 948 -0478 Internet www nccoastalmanage F!EJA 7 An Equal Opportunity 1 Afrmative Action Employer — Made in part by recycled paper
DIVISION OF COASTAL. MANAGEMENT
FIELD INVESTIGATION REPORT
APPLICANT'S NAME River Forrest Partners LLC
2 LOCATION OF PROJECT SITE Project site is located at 738 East Main Street at the River Forrest Manor
property adjacent Pantego Creek in the Town of Belhaven, in Beaufort County, North Carolina.
Photo Index - 2006 116 -8445, R -6 2000 116 -1464, S -6 1995 116 -1268, F -7
State Plane Coordinates - X 2,710,000 Y 657,200
Belhaven Quad (lower left corner)
3 INVESTIGATION TYPE CAMA
4 INVESTIGATIVE PROCEDURE Dates of Site Visit —12 December 201
Was Applicant Present — Yes
5 PROCESSING PROCEDURE Application Received — 26 January 2015'
Office - Washington
6 SITE DESCRIPTION
(A) Local Land Use Plan - Beaufort County
Land Classification From LUP — Municipal District
(B) AEC(s) Involved PTA
(D) Water Dependent Yes
(D) Intended Use Commercial
(E) Wastewater Treatment Existing - Town Sewer System
LJ A i �4 Y, '7 rT,
BUFF f e Y
Planned - N/A
(F)Type of Structures Existing - Piers, docks slips, marina house, restaurant/bed and breakfast,
riprap revetment and boat ramp
Planned - Replace existing Dock B and add 9 new slips with associated tie
pilings, finger piers, and new L -head platform, replace fuel dock and add
three tie pilings and finger pier to Dock A for one additional slip
(G) Estimated Annual Rate of Erosion Unknown
7 HABITAT DESCRIPTION
[AREA]
DREDGED FILLED OTHER
(A) Vegetated Wetlands
(B) Non - Vegetated Wetlands
Pante o Creek Bottom
3,432 ft2
(C) Other
(D) Total Area Disturbed 3,432 ft2 (0 08 acres)
(E) Primary Nursery Area No
(F) Water Classification SC NSW
Open No
8 PROJECT SUMMARY The applicant proposes to replace Dock B 8'x 232', add 9 slips and a 10'x 40'L-
head platform, replace a damaged 10' x 60' fuel dock and add a 4' x 24'and 3 tie pilings for one additional
slip on existing Dock A Applicant proposes to repair existing buildings
River Forrest Partners LLC
River Forrest Marina
Town of Belhaven
Pantego Creek
Beaufort County
Project Setting
The developed 4 34 acre project site known locally as the River Forrest Manor is located
at 738 East Main Street within the Town of Belhaven on its east side adjacent Pantego Creek in
Beaufort County, North Carolina The site is developed as a mixed commercial business that
once offered a restaurant, bed and breakfast and commercial marina with dockage, fuel and a
marina store The restaurant and bed and breakfast have been out of service for several years
The marina has continued its operations at a diminished level, providing some overnight dockage
mainly to transient vessels off the Atlantic Intracoastal Waterway The project site is situated in
an area that both residential and commercial development The Town of Belhaven has zoning
ordinances The project site is zoned Marine Business
The entire project site is uplands, with no wetlands at the site Development is centered
around the large distinguished Victorian style mansion built in the center of the property in the
early 1900s Vehicular access to the mansion is by an asphalt driveway and parking area Other
associated infrastructure includes a large attached open wooden deck, a tennis court and
swimming pool There is a smaller building adjacent the restaurant/bed and breakfast that
housed employees of the B and B but currently is used as short term room rental to the public
The marina is situated in a dredged basin with a dredged access channel off the federal
channel offshore in Pantego Creek The dredged basin is located 500' upstream of the federally
maintained wooden breakwater at the mouth of Pantego Creek Major CAMA Permit No 244-
88 issued on 8 December 1988 authorized a 100' extension and maintenance of an existing 500'
long riprap breakwater on the east side of the dredged basin as well as maintenance excavation of
the existing basin to a final depth of 8' below the normal water level (NWL) Existing water
depths in the basin average 8' below the NWL and range from minus 4 5' to 12' in depth There
are two existing piers /docks in the dredged basin Dock A is 8' x 300' with 13 existing
formalized slips with associated tie pilings and Dock B is 8' x 232' with 8 existing formalized
slips with associated tie pilings Dock B has suffered some storm related damage and has aged
structurally to the point that it has become unsafe /unusable for its intended purpose There is
also a 10' x 60' fuel /dingy dock at the base of Dock A that has suffered storm damage and all
that remains are some pilings and stringers There is an open wooden deck at the base of Dock A
as well as the marina office building Landward of the marina office are the above ground fuel
tanks and an equipment shelter There is an existing marine pumpout on Dock A Wastewater
from boats as well as from the existing buildings is handled by the Town of Belhaven sewer
system
The project site shoreline is stabilized with a riprap revetment constructed out of broken
concrete There is an existing boat ramp adjacent to the fuel /dingy dock Pantego Creek is
designated as Inland Waters by the Wildlife Resource Commission The Environmental
River Forrest Partners LLC
Pantego Creek
Beaufort County
Page Two
Management Commission classifies Pantego Creek as SC NSW This area is closed to
shellfishing
Project Description
The applicant is proposing to revitalize the existing mansion for the purpose of hosting
weddings and other social gatherings There is no other new upland development planned other
than restoration and maintenance of the existing facilities
The applicant proposes to improve the marina facilities by completely replacing Dock B
8' x 232' and adding a 10' x 40' L -head platform at the waterward end The applicant proposes
to construct 8 - 4'x15' finger piers servicing 17 proposed slips (8 existing and 9 new) The slips
will be 18' wide x 38' long, similar in length as the existing slips Two of the slips will have 13'
x 13' boat lifts The slips on Dock B will be for long term rental
The applicant proposes to improve Dock A by adding 1 - 4'x24' finger pier, one new slip
and three new tie pilings The 10' x 60 fael/dmgy dock will be replaced
Anticipated Impacts
Once complete, the project will increase boat traffic in the area and the associated
environmental impacts The additional finger piers and platform will increase the shaded impact
to Pantego Creek bottom by 796 ft'
Steve Trowell — Washington Regional Office — 22 January 2015
January 5, 2015
Mr Steve Trowell
Coastal Management Field Rep
Division of Coastal Management
943 Washington Square Mall
Washington, North Carolina 27889
Re River Forest Manor & Marina
Belhaven, NC
Dear Steve,
River Forest Partners LLC, a group of local citizen investors, purchased the River Forest Manor and Marina
(located at 738 E Main Street, Belhaven, NC) on October 23, 2014 We have already started renovating
the marina office building which includes the marina restrooms We should complete the renovation of
this building this month We have installed a new roof on both the Manor house and the 3 unit block
building behind the Manor We will be installing new windows in both buildings this month We are going
to renovate both buildings, taking the restaurant kitchen out of the Manor and converting it to a catering
kitchen The Manor will no longer have a restaurant We are going to be a wedding / special event venue
utilizing catering services for food We will continue to operate the marina offering both fuel sales and
transit rental on Dock A and long term slip rentals on Dock B We will use the existing fuel and pump out
facilities on Dock A
We will not be building any new buildings or parking facilities We do, however, want to replace the
existing 8 slip Dock B adding 9 new slips, two of which will have boatlifts and add a 10' x 40' platform at
the end of Dock B On Dock A, we want to add a finger pier and one slip We also want to rebuild the
dingy /small boat fueling dock at the base of Dock A We require no new signage / channel pilings or need
any dredging
Please call / email me with any questions We are going to restore the River Forest Manor, Belhaven's
famous landmark to its former grandeur, helping both the Town of Belhaven and eastern Beaufort
County's economy
Sincerely,
cf
C Brantley Tillman
River Forest Partners, LLC
738 E Main Street
Belhaven, NC 27810
mem W -1
L =� Is x �� �'• � � 3P ss5l ��% x `'.Y � "�� �iF
G ! k Ll ?k I rc
a xs
ia- aa �� J+ I�S� s � � f� �� P1 6 � '�� ,.„�'� pia` +. �..� � ��� � � - -. *'•� n � ; 7w,
��� f #� w:�l�ct 't I, • -v; '�`+fw �. ktl�4-451I�'++I�� "' �; �:'� p�, .sue
(last revised 12/27/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant/ Landowner Information ,
Business Name
River Forest Partners, Llc
Project Name (if applicable)
River Forest Marina
Applicant 1 First Name
Charles
MI
B
Last Name
Tillman
Applicant 2 First Name
MI
Last Name
If additional applicants, please attach an additional page(s) with names listed
Mailing Address
738 East Main Street
PO Box
City
Belhaven
State
NC
ZIP
27810
Country
USA
Phone No
252 - 943 - 0030 ext
FAX No
- -
Street Address (If different from above)
City
State
ZIP
Email
dockmaster @nverforestmarina com
2. Agent/Contractor Information
v =
Business Name
N/A
Agent/ Contractor 1 First Name
MI
Last Name
Agent/ Contractor 2 First Name
MI
Last Name
Mailing Address
PO Box
City
State
ZIP
Phone No 1
-
- ext
Phone No 2
- - ext
FAX No
Contractor #
Street Address (if different from above)
City
State
ZIP
Email
<Form continues on back>
252 - 309 -2308 .- T :. e;rva�u.r��wa�s� nsar���c�ee��.n�wt
'Foy m DCM MP -1 (Page 2 of 4)
APPLICATION for
Major Development Permit
3. Project Location
County (can be multiple)
Street Address
State Rd #
Beaufort
738 East Main Street
d Approximate elevation of tract above NHW (normal high water) or
Subdivision Name
City
State
Zip
River Forest Marina
Belhaven
NC
27810-
Phone No
Lot No (s) (if many, attach additional page with list)
252 - 943 - 0030 ext
N /A, , , ,
a in which NC river basin is the project located?
b Name of body of water nearest to proposed project
Tar /Pamlico
Pantego Creek
c Is the water body identified in (b) above, natural or manmade?
d Name the closest major water body to the proposed project site
®Natural ❑Manmade ❑Unknown
Pungo River
e Is proposed work within city limits or planning jurisdiction?
f If applicable, list the planning jurisdiction or city limit the proposed
®Yes ❑No
work falls within
Yes, Belhaven
4. Site Description
a Total length of shoreline on the tract (ft )
b Size of entire tract (sq ft )
642' +/-
4 34 acres
c Size of individual lot(s)
d Approximate elevation of tract above NHW (normal high water) or
N /A, I I
NWL (normal water level)
(If many lot sizes, please attach additional page with a list)
5' ❑NHW or ®NWL
e Vegetation on tract
Scattered pine trees and maintained lawn grass
f Man -made features and uses now on tract
Existing residence (former B &B), Marina office, above ground fuel tanks, existing Dock A and Dock B
g Identify and describe the existing land uses adjacent to the proposed project site
Residential
h How does local government zone the tract?
i Is the proposed project consistent with the applicable zoning?
Marine Business
(Attach zoning compliance certificate, if applicable)
®Yes ❑No ❑NA
j Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No
k Hasa professional archaeological assessment been done for the tract? If yes, attach a copy ❑Yes ED% ❑NA
If yes, by whom?
I Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA
National Register listed or eligible property?
<Form continues on next page>
252 -838 -2806 .. i -ESa RCOPS aEf���a .a��oc��st�lc�����c�eatecat.�e�
Forin DCM MP -1 (Page 3 of 4)
AI'MIWi1IVN iui
Mayor Development Permit
m (i) Are there wetlands on the site? ❑Yes ®No
(n) Are there coastal wetlands on the site? [-]Yes ®No
(m) If yes to either (i) or (n) above, has a delineation been conducted? [-]Yes ®No
(Attach documentation, If available)
n Describe existing wastewater treatment facilities
Existing Town sewer
o Describe existing drinking water supply source
Existing Town water
p Describe existing storm water management or treatment systems
None - surface run off
5. Activities and Impacts
a Will the project be for commercial, public, or private use? ®Commercial ❑Public/Government
❑Private /Community
b Give a brief description of purpose, use, and daily operations of the protect when complete
Dock A provides dockage, fuel and pumpout for transit boats
Dock B will be for long term slip rentals
c Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored
Use standard marina pile driving equipment for dock replacement, repair and new construction as per cross sections shown
on sheets 2, 3, 4 and 5
d List all development activities you propose
Replace Dock B and add 9 additional slips with 10'x40' landing /platform at the end of pier Replace small boat dock and add
one finger pier and slip to Dock A
e Are the proposed activities maintenance of an existing protect, new work, or both? Both
f What is the approximate total disturbed land area resulting from the proposed project? None ❑Sq Ft or ❑Acres
g Will the proposed protect encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA
that the public has established use of?
h Describe location and type of existing and proposed discharges to waters of the state
/ ?6n 074 ga
i Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No [DNA
If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ®NA
I Is there any mitigation proposed? ❑Yes ®No ❑NA
If yes, attach a mitigation proposal
<Form continues on back>
2 5 2 - a G a - 22 9 0 a .. 1- 888-4RCOAST .n
Form DCM MP -1 (Page 4 of 4) AYYLR.A 11UN 101
Major Development Permit
6. Additional Information
In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application
package to be complete Items (a) — (0 are always applicable to any major development application Please consult the application
instruction booklet on how to properly prepare the required items below
a A project narrative
b An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale Please give the present status of the
proposed project Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed
c A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site
d A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties
e The appropriate application fee Check or money order made payable to DENR
f A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mad Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management
Name Adam O'Neal Phone No 252 - 943 -5939
Address 693 Water Street, Belhaven, NC 27810
Name Axson Smith Phone No 252 - 945 -5579
Address 810 E Main Street, Belhaven, NC 27810
Name Phone No
fi
Address
g A list of previous state or federal permits issued for work on the project tract Include permit numbers, permittee, and issuing dates
N/A
h Signed consultant or agent authorization form, if applicable
i Wetland delineation, if necessary
I A signed AEC hazard notice for projects in oceanfront and inlet areas (Must be signed by property owner)
k A statement of compliance with the N C Environmental Policy Act (N C G S 113A 1 -10), if necessary If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act
7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application
The project will be subject to the conditions and restrictions contained in the permit
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up
monitoring of the project
I further certify that the information provided in this application is truthful to the best of my knowledge
Date `' t} Print Name 2` \1C -�, '\--Z i-.. -e S �— ?a, e
C •� a v, e ��� \tl vv'c, ~\ t W \�V\h t= QZ
Signature
Please indicate application attachments pertaining to your proposed project
❑DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts
❑DCM MP -3 Upland Development
NZbCM MP -4 Structures Information
252 -808 -2805 .. 11- 888 -4RCO ST :. ;rrwv4.rccoasta1mana9eiment.net
Form ®CM MP-4
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Mayor Permit, Form DCM MP -1 Be sure to complete all other sections of the Joint
Application that relate to this proposed project Please include all supplemental information
9. _ DOCKING FACILITY /MARINA CHARACTERISTICS El This section not applicable
a (i) Is the docking facility /marina b (i) Will the facility be open to the general public?
®Commercial ❑Public/Government ❑Private /Community ®Yes ❑No
c (i) Dock(s) and /or pier(s)
d (i) Are Finger Piers included? ®Yes ❑No
(u) Number 2
If yes
r
(m) Length 60'
,
(n) Number 9 ,
(iv) Width 8', 10'
(iii) Length it j
(v) Floating []Yes ®No
(iv) Width 4'
(v) Floating []Yes ®No
e (i) Are Platforms included? ®Yes ❑No
f (i) Are Boatlifts included? ®Yes ❑No
If yes
If yes
(u) Number 1 at end of Dock B
(u) Number 2
(iii) Length 40'
(m) Length 13'
(iv) Width 10'
(iv) Width 13'
(v) Floating ❑Yes ®No
Note Roofed areas are calculated from dnpline dimensions
g (i) Number of slips proposed
h Check all the types of services to be provided
10
❑ Full service, including travel lift and /or rail, repair or
(u) Number of slips existinq
maintenance service
Dock B - 8, Dock A-13
❑ Dockage, fuel, and marine supplies
® Dockage ( "wet slips ") only, number of slips
❑ Dry storage, number of boats
❑ Boat ramp(s), number of boat ramps
® Other, please describe
Existing Marine pumpout
i Check the proposed type of siting
❑ Land cut and access channel
❑Open water, dredging for basin and /or channel
®Open water, no dredging required
❑Other, please describe
existing dredged channel to basin
k Typical boat length 40'
m (i) Will the facility have tie pilings?
®Yes ❑No
(u) If yes number of tie pilings?
1+—A�'
Describe the typical boats to be served (e g , open runabout,
charter boats, sad boats, mixed types)
Average size vessel 35' to 45'
Will service vessels from 18' to 100' +
I (i) Will the facility be open to the general public?
®Yes []No
Z152-S08-2,S08 :. 1- 888- 4RCOAST K: �ev-lsed= 12 /2TIGS
2. DOCKING FACILITY /MARINA OPERATIONS El This section not applicable
a Check each of the following sanitary facilities that will be included in the proposed project
® Office Toilets
® Toilets for patrons, Number 2, Location Existing Marina Office Building
® Showers
® Boatholdmg tank pumpout, Give type and location Existing Marina Office, Pumpout of Dock A
b Describe treatment type and disposal location for all sanitary wastewater
Existing municipal sewer service from Town of Belhaven
c Describe the disposal of solid waste, fish offal and trash
Trash Service Town of Belhaven
d How will overboard discharge of sewage from boats be controlled9
Signage for pumpout, vessel monitoring by dockmaster
e (i) Give the location and number of "No Sewage Discharge" signs proposed
3 - one at marina office and one at base of each dock
(u) Give the location and number of " Pumpout Available' signs proposed
3 - one at marina office and one at base of each dock
f Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products
N/A
g Where will residue from vessel maintenance be disposed of'?
N/A
h Give the number of channel markers and "No Wake" signs proposed No new markers
i Give the location of fuel - handling facilities, and describe the safety measures planned to protect area water quality
Existing fuel facilities, no additions proposed
/ What will be the marina policy on overnight and live- aboard dockage
No live - aboards, overnight dockage for transient boats
k Describe design measures that promote boat basin flushing?
N/A
I If this project is an expansion of an existing marina, what types of services are currently provided?
Expansion of number of slips
m Is the marina /docking facility proposed within a primary or secondary nursery area?
❑Yes ®No
252 - 808 -2808 :: ` -638 4RCOAST revs see. 1227/06
Foy Ln w DCM G P-4 (StrUCftCTG -S, [ange 3 of 4)
n Is the marina /docking facility proposed within or adjacent to any shellfish harvesting area?
❑Yes ED%
o is ine marina /OOGKIlly IdUllty NiuPUaau wui nn vi —J—u a a_..,,
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected
❑CW ❑SAV ❑SB
OWL ®None
p Is the proposed marina /docking facility located within or within close proximity to any shellfish leases? ❑Yes ®No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease
3. BOATHOUSE (including covered lifts) ®This section not applicable
a (i) Is the boathouse structure(s)
❑Commercial ❑Public/Government ❑ Private/Comm unity
(n) Number
(m) Length
(iv) Width
Note Roofed areas are calculated from dnplme dimensions
4. GROIN (e g, wood, sheetpile, etc If a rock groin, use MP -2, Excavation and Fill) ®This section not applicable
a (i) Number
(u) Length
(iii) Width
5. BREAKWATER (e g, wood, sheetpde, etc) _ This section not applicable
a Length b Average distance from NHW, NWL, or wetlands
c Maximum distance beyond NHW, NWL or wetlands
6. MOORING PILINGS and BUOYS [09 This section not appbcable
a Is the structure(s)
❑Commercial ❑Public /Government ❑Private /Community
c Distance to be placed beyond shoreline
Note This should be measured from marsh edge, if present
e Are of the swing
7. GENERAL
b Number
d Description of buoy (color, inscription, size, anchor, etc )
252- &08.2808 :, I- SB84RC tTST -. gee; rev:s a, 1212T/03
F:wm 0CM NW-4. Page 4 of 4)
a Proximity of structure(s) to adjacent riparian property lines
38' from west side, 80' from east side
Note For buoy or mooring pthng, use arc of swing Including length
of vessel
c Width of water body
3,450'
e (i) Will navigational aids be required as a result of the project?
❑Yes ®No ❑NA
(u) If yes, explain what type and how they will be implemented
b Proximity of structure(s) to adjacent docking facilities
+150'
d Water depth at waterward end of structure at NLW or NWL
g'+ Dock A, 7' Dock B
8. OTHER 1K] This sect iIon not applicable
a Give complete description
S - ?,o vS
Date
River Forest Marina
Project Name,
River Forest Partners, LLC
Applicant Name
V\/-\ k�
Applic nt Si natur-ee�_
e V.,�b C-
-996-4 ant.�et revised: 12127/06
Adam O'Neal
693 Water Street
Belhaven, N C 27810
Mr Steve Trowell
NCDENR
943 Washington, N C 27889
Washington, NC 27889
Dear Mr. Trowell,
I have reviewed the attached pier improvement proposal by River Forest Partners, LLC and have
no objection
Sincerely,
Adam O'Neal
- S3NIl NV'IVdi® —.
n0q S
T,
e v
'Motzr tiE* Fs 0
°�4 ®44p41441A @�'BPtdd; ®�ry�����
0
F +F a I • C!
Ilk
PIA
11 e�� od ao
art
ah �rl !1
_a tit er
k l�
y rj fl d i `G� O O
.. �} 1 vm.�..r. ` l w �. �e *�.,``• ,,,L�». ^c9e ` :�, p�0�.s
Lj
i
Fri r�`�9 N �S3NIl N'dl2!`dd18 b'W`dO_
IPA
m a
, 1
oo
Ou
Mr. Axson Smith
810 E Main Street
Belhaven, N C 27810
Mr. Steve Trowell
NCDENR
943 Washington, N C 27889
Washington, NC 27889
Dear Mr Trowell,
I have reviewed the attached pier improvement proposal by River Forest Partners, LLC and have
no objection.
Since ely,
Axs Smith
M °49,82072 S
m �
lb. ® ®�de�b�OBppU��d0oo09gggv �+
All A Ga
lop
kell
RA
vt
d-
a„ E o
nii'i u`? .� ��
��
',p��`
ySaNI -I NVINW18 VWd�
„L 6� 49 �� �+
J
tp
�� 2S or,
b tt t
11 I
ee
Yr
gz ) 0 6 j <
2
o (6 c saw 'k v VI
ESN. -A ex, ' i V� r t,
A `A
gw
-141
i
f
t
t
3
e�r�-- rsm.Nt _ � __ ,,.-tt{ •�'t',
i
«...,.�,�s....nasc, :art
1
t
j
�
• i
1
I
r i �
t
f
r
F
2
' n ' Le .� t
d
t
t
E y
~�5 F
Win,; -
P '
Win,; -
IV"
fit
tyl
�J
4✓
�'�„
h�
OYD
V
Pb
m
G+
Cr
'f7
h
Il�i'y� -;`iii
wMtpo.
Pr Fg
00
s. ell
u OIL
1�1
IT H
Wlc
Li;
DUO
to
Out
C)C)m
iu
Z-t
W Z U-j t:
rz.
z Z=2
O:z
�-Ln
M
\
\
M-11
X
l
CI
\
\
g
FEN
'•iii d9I ice— _ /^
.a. FiR I., TOWN OF BELHAVEN \
�/ �M13]> _ \
\H13 l 1 ZONING
All
C . {y
SAO
FRA
r �
7
/
021
� I
aim
Or
� KillV R
p��o0
IDG SO.
WAY
IN, PU
elm
•� pia
a°
Thal map shall eery as the Official Zoning Map
for the town of Belhaven, North Carolina and �� i •• a
shag replace ad previous maps. This n1op
adopted by the Belhaven Town Counca
WX
� J
P 7-1_."�.
V-11
FM
M
in
ILL
M�_N'
N2720
0
Y
W -1
WATER USE DISTRICT
R -5
RESIDENTIAL
R -510
RESIDENTIAL MOBILE HOME
RA
RESIDENTIAL /AGRICULTURAL
GS
GENERAL BUSINESS
HB
HIGHWAY BUSINESS
I
INDUSTRIAL
MB
MARINE BUSINESS
®
PRIMARY FIRE DISTRICT
AEC
AREA OF ENVIROMENTAL CONCERN
RAILROAD RIGHT —OF —WAY
mm
iP. 1
i
0
ENGINEERS
PLANNERS
SURVEYORS = _
JARVIS ASSOCIATES9 P.A.
930 E. SECOND STREET
WASHINGTON, NORTH CAROLINA 27889
(252) 974 -7794
--------ZONE BOUNDARY
_
--------TOWN BOUNDARY
��� °_'
_,_ _,_,_,_ ETI BOUNDARY
, RAILROAD
I 1 h
/
!
f ESTUARINE SHORELINE
(7$' SETBACK)
1
1:
1000 0 1000 2000
"
®
e
q �s f� /'�
Scale 99 1 0009
Scale
!
1
1
mm
iP. 1
i
0
ENGINEERS
PLANNERS
SURVEYORS = _
JARVIS ASSOCIATES9 P.A.
930 E. SECOND STREET
WASHINGTON, NORTH CAROLINA 27889
(252) 974 -7794
°52" s7° EPiC S02003'f6'E WE HEREBY CERTIFY THAT WE ARE THE OmERS OF THE PROPERTY SHOYN, AND
DESCRIBED HEREON, X3401 IS LOCATED IN THE SUBDIVISION JURISDICTION OF THE
3.45` -; �
1E 4' TIE TOM OF BELHAVEN AND THAT VE HEREBY ADOPT THIS PLAN OF SUBDIVISION %1TH
CRY OUR FREE CONSENT AND ESTABLISH td' IMUM BUILD114G SETBACK LINES AS
t �
11, QIP � -�. �,. � DATE OWNER �^
Mz. SET CC PP �.
r5P1lf Ai
64
�', ` OWNER
's
40
oma.
MCiNITY SKETCH' �
Q'
(NOT TO Ste )�V
s _ A'LEGEND OAU INE
lop
t
` 4.34 a d ar �3
A
%ER DpSwmv =t
THr 19 CCCJ47 �!A
9R SFT dh ° :% 1 i^ tiu K
nPS ArO PaAff a PP
R'ir'eYF wA$'
}EBL MINIMUM Bd/I1iidFdG LINE � ;+ °EXISTING FOUND IRON
£ r JAQ �, , .'• BPIPELO IKWAIaA Etna 3F
OiiE OVc' EAD Poi#
BLOCK 1°TALI„ A,Pd£1
40, z �o :�. Qtr /0.43' FROM LDtiE OF
PP POMR POLE SIDE1tAi tt
LP unrar POLE
CMTROL CORNER
� � r
f / AS 44LT 5Tr2t1CTti4 :� o
c:t rS pf c f s�1r Tu#xJULIAN GOFF
chi DB 1781 PG 45
r
ASPHALT
% Sx#siTrr �
pC,'s
.. Extslrsrr - . s :?ueT>c
..- PHALT
f r
34..44` TIE r
PCD1'i1D1 DFk4;#E1i11 STREET -. g'AXSt# SMITH
AS SHOWN CDS•° AN UNRECORDED 05E w 176
'140
SU-,, 'Y T1TLED'F 1�E TIE " s, U CTS Cry
of A.s�i.TY SMTH AM VA -
DATED 10-28-11969.
THIS APEA IS ALSO CLAIMED 3Y 'Par. ,� SdR ONLINE
,60AM W, ONEAL AS TRACT 2 PER
CDS 14.69 PG $33
S ix�
y
a
'+ y_ ,,:;,f `:tP a•' .f> ASP"ALT
JU
f{ 4 S yt fP OAT
La. d
Ai
CK
WOOD DECK
�; �' oma.. ,' °fie• -'�
°Of E
S 2 k0i
t,.z� �• i�11gr4
N Y tJ C.3
VIP
6
�� '" �� `moi �'.'�t.�'�-�b� Cij^•�-� #�fi' 4
A
r;{'d�p j;, tea{ a '�
lu ssc z t'fi.'"i! a �' d"k �,PILE Cryp"
ALONG PANTEGO CREEK
FROM A TO 183
SEARING
LENGTH
N64a18'02AW
52.24'
N7 -51'27-
28.50'
N84041*14'W
19,841
S63%8114"w
11.85=
S24004'20'W
115.72'
N66005'05`W
33.10,
N6[*44'39'W
15.90`
N67001'01"
39.12'
N76f50%7"W
21.21°
N88045°34'
2.91''
S89057'03"'W
9.16`
s 3 77°02'{ 311
28.13'
N65*25 53"W
48,51,
N57°2 08'W
27.83'
FTd54...0.,,.,6*38,.......,...�Y*
28.8551
N7904.4'03"
28.79'
N61°05'37'W
26.60'
N47008`04*W
13.46*
[::N06°.5f5�
7.145:
BEEENRENCES
D81856 PG 864
ESTATE FILE 05-176
LES 327 PG 389
DD 591 PG 787
DB 787 PC 4.65
UNRECORDED MAP ENTITLED
"PROPERTIESOF AXTON SMITH
AND VAFE" DATED I0-28--69.
n. 'I elk
i�.F3iA_ G0,1. CREEK g�iE tTYP1 � .._....
k t t, I
`� SCALE: 1 = 50'
1.6"�` q.,` �".`�'R� �'3 + Si'ita�: �.% (%j -� l i.. 4 4*z ,.¢. @ p ��4 'E""? y 'Y fa,S.
4�{dusax .d1V$�.x'4. �»�$ 4.L i.o'I
' r
s � ;
ti REVISED 12/10/14:
�LEI a 'S NAME —CHANGED T
STATE OF NORTH cARWNA
L r,1124 $' els ADDED O S O THE PORTIO OF RSR VIEN
TOWNOFiA EN � STREET THAT .ABU'T'S THE RIVER.
I CERTIFY THAT THE. SUBDI4TSION PLAT _gHCVIN HEREON HAS BEEII
IRE TOM��,��` �c t r � a
FOUND TO CWPLY ATH THE StISDIMSOF
REGULA11ONS �� � �'
OF BI='I EA'�° N AND WAS Af' ' 0"r BY WE TOWN BOARD J&&�_ �� ��
If3loth, 201&?x3IJER iOXt' E T Y 2 -MAP IS H .� I
,k � NAL PLAN` FOR
TOM DANA DATE
RIVER RES
GERM . ,. PtiE iTYFj PARTNER L
MyM frFEST PARTNERS, LLC °
1004 WAC`%` FOREST ROAD
I c s..;tv 27604 "CURRENT OWNER -- RIATER FOREST PARTNERS, IAC
NLMS17R LOTS. � BEING A PORION OF GPIN #7605-97-7667
ACRZAGE .'} LOT: .. , , .3 AC
TOWN OF
1, 3 3 � F �N,S C 'Tr'y T T< ` f h' S Stil-i -E&MS A P �� D La f �1 €�€
s LAND STIP THE AHIM OF A C NSY to HUNOPAUTY F -AREA ^ALCULATED BY COORDINATES 6 , i � �� TOWNSHIP �y
THAT WS AN OR£'fMiCE 't` l � �" .Y ���Crz S � € 3I i 1. iRlAdek€€ t,�: BUILDING Uiti3S UNLESS OT�s�2 � i<OTE7° � -STREET RIGHTS OF WAYS I DETER&tINEtD BY �" °� Ia #
° A. mjNIh9l,tVt FRONT' YARD $ETSAC K IS' EXISTING IRONS p^ �AND IMPROVEMENTS.
B. D9ilddDst_IM SIDE SACK M V -R#P AN LIMES WERE DELENIATED BY STEVE TROT LL � C 7� � COUNTY
D. MINIMU7.,V REAR YARD SETBACK IS THE CURRENT & APPROVE -0 ON $,4t'Y 10th, 2013. i.3
w WATER 04 SBA FROM A 1I 5Ofl= NORTH CAROLINA
WATER flL;t'tS3M
2. Se e*; ' ZQFA4 , IS MARNE WSINESS SURVEYED: LV9 � 2013
L NDA E GASKINS, CERTIFY THAT INS PLAT WAS DRAM UNDER MY 3, T: =RapmTY is LOCATM IMIKN :A SPECIAL.
PERMV FRO.LP A <AJRVEY MADE UNDER DRY SUPERVISION (DEED HAZAZ� >:A
AV
L�CMP7t RECORDED IN BOOK �. PAS ), €HAT THE � - SCALE g
" '
MVM,, R n T S � :- w^�. EPNRLY 1NDICATED AS DRAl�i:�i MOM Bt €' � "� _ =1
F 1 S .__.._., P THAT THE RATIO OF &cF - i 37A457&C, 20 I
PfOUS04 � • _-TGTMw3+z TIM_f T`HM 1--u WAS
%: C31'rE DATE .. , ... , .SAY 1 2303 ST€xTE ?zf E LAND gq C 3C}23
a 5 7SD AS CMINe aMAVENASK N .i._3,�"3. a '� D
'bf°TNFSS MY ORIGINAL StaWIIURE, REGISTRATION NUMBER Me ALCERTIFY
REViOFFICER OF CRAVEN COUNTY, C R7IFY
—�) Ei N g
P.A.
THIS 10LDAY OF "E A E20I3 IHE ERTFCTON IS AFFIXED TTHI Py§TO
MEEETS ALL STATUTORY REQUIRDAENTS FOR RECORDING PROFES SIONAL LAND SURVEYING
utDAtt E. �Iu� L-,�- PO Box 354Phone: 252-24-4--0599
DATE Voeoro" NC 28586 Fax: 252-24-4-5899