Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutNC0025763_Authorization to Construct_20130709A tP1ri'/'th/ hli rUcaUZs763
Town of Kure Beach
A To C No.025763A01
Issued April 16, 2013
Engineer's Certification
the construction of the modifications and improvements to the Kure
1200 H Avenue in New Hanover County for The Town of Kure Beach, hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the following
construction:
JUL 09 2016
1.1,1f str ictvre r=inerc Section
, as a duly registered Professional Engineer in
the State of North Carolina, having been authorized to observe (► -no • Ica ., weekly/full time)
WWTP, located on
Installation of dechlorination system u izing Calcium Thiosulfate pursuant to
the fast track application received on pril 9, 2013, and in conformity with the
Minimum Design Criteria for Dechlorination Facilities.
I certify that the construction of the above referenced project was observed to be built
within substantial compliance and intent of the approved plans and specifications.
Signature
Date 7 - 3 - 20 l 3
Send to:
Registration No. 21 q`/y
Attn: Michelle McKay, E.I.
Infrastructure Finance Section
DENR/DWQ
1633 Mail Service Center
Raleigh, NC 27699-1633
4. g -ZEAL
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Pat McCrory Charles Wakild, P. E. John E. Skvarla, III
Governor Director Secretary
April 16, 2013
Henry E. Beeker, Jr., Director, Public Works Dept.
Town of Kure Beach
117 Settlers Lane
Kure Beach, North Carolina 28449
SUBJECT: Authorization to Construct
A to C No. 025763A01
Town of Kure Beach
Kure Beach WWTP
Dechlorination Facilities
New Hanover County
Dear Mr. Beeker:
A fast track application for Authorization to Construct dechlorination facilities was
received on April 9, 2013, by the Division of Water Quality (Division). Authorization is hereby
granted for the construction of modifications to the existing Kure Beach WWTP, with discharge
of treated wastewater into the Cape Fear River in the Cape Fear River Basin.
This authorization results in no increase in design or permitted capacity and is awarded
for the construction of the following specific modifications:
Installation of a dechlorination system utilizing Calcium Thiosulfate pursuant to
the fast track application received on April 9, 2013, and in conformity with the
Minimum Design Criteria for Dechlorination Facilities.
This Authorization to Construct is issued in accordance with Part III, Paragraph A of
NPDES Permit No. NC0025763 issued November 4, 2011, and shall be subject to revocation
unless the wastewater treatment f Pnstructed in accordance with the conditions and
limitations specified in P t o. NC0025763.
In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those as may
be required by this Division, such as the construction of additional or replacement wastewater
treatment or disposal facilities.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604
Phone: 919-807-6300 t FAX: 919-807-6492
Internet www.ncwateroualitv.orq
An Equal Opportunity 1 Affirmative Action Employer
DENR-WATER DUALITY
POINT SOURCE BRANCH
NorthCarolina
Naturally
Henry E. Beeker, Jr., Director, Public Works Dept
April 16, 2013
Page 2
The Wilmington Regional Office, telephone number (910) 796-7215 shall be notified at
least forty-eight (48) hours in advance of operation of the installed facilities so that an on site
inspection can be made. Such notification to the regional supervisor shall be made during the
normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State
Holidays.
Upon completion of construction and prior to operation of these permitted facilities, the
attached Engineer's Certification form must be received from a professional engineer certifying
that the permitted facility has been installed in accordance with the NPDES Permit and this
Authorization to Construct. Mail the Certification to: Construction Grants & Loans,
DWQ/DENR, 1633 Mail Service Center, Raleigh, NC 27699-1633.
Upon classification of the facility by the Certification Commission, the Permittee shall
employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the
wastewater treatment facilities. The operator must hold a certificate of the type and grade at least
equivalent to or greater than the classification assigned to the wastewater treatment facilities by
the Certification Commission.
The Permittee must also employ a certified back-up operator of the appropriate type and
grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each
Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding
weekends and holidays, must properly manage the facility, must document daily operation and
maintenance of the facility, and must comply with all other conditions of T15A:8G.0202.
A copy of the approved plans and specifications shall be maintained on file by the
Permittee for the life of the facility.
During the construction of the proposed additions/modifications, the permittee shall
continue to properly maintain and operate the existing wastewater treatment facilities at all times,
and in such a manner, as necessary to comply with the effluent limits specified in the NPDES
Permit.
You are reminded that it is mandatory for the project to be constructed in accordance
with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North
Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's
responsibilities shall be in complying with these Acts.
Prior to entering into any contract(s) for construction, the recipient must have obtained all
applicable permits from the State.
Failure to abide by the requirements contained in this Authorization to Construct may
subject the Permittee to an enforcement action by the Division in accordance with North
Carolina General Statute 143-215.6A to 143-215.6C.
Henry E. Beeker, Jr., Director, Public Works Dept
April 16, 2013
Page 3
The issuance of this Authorization to Construct does not preclude the Permittee from
complying with any and all statutes, rules, regulations, or ordinances which may be imposed by
other government agencies (local, state, and federal) which have jurisdiction.
If you have any questions or need additional information, please do not hesitate to contact
Seth Robertson, P.E. at telephone number (919) 707-9175.
Sincerely,
cf.0
Id
Charles Wakild, P. E.
MM/sr
cc: Brian G. Cox, P.E., Engineering Services, PA, Gamer NC
New Hanover County Health Department
DWQ Wilmington Regional Office, Surface Water Protection
Point Source Branch, NPDES Program
Michelle McKay, E.I.
ATC File