Loading...
HomeMy WebLinkAbout20071647 Ver 1_More Info Letter_20070928~OF W A T~~Q Michael F. Easley, Governor ~Q G William G. Ross Jr., Secretary ~ ~ North Carolina Department of Environment and Natural Resources ~ ~ ~ -C Coleen H. Sullins, Director o ~~ ..s;,.,,~, ~~ Division of Water Quality ±+~:~t- . September 28, 2007 DWQ Project # 07-1647 Cherokee County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Hard Rock Mine, Inc. Attn: Glen Frank P.O. Box 128 Epworth, Georgia 30541 Subject Property: Hard Rock Mine Stream Impacts ® REQUEST FOR MORE INFORMATION ^ PERMITTING FEE MISSING/INCORRECT ^ RETURN OF APPLICATION PACKAGE Dear Mr. Frank: On September 28, 2007, the Division of Water Quality (DWQ) received your application dated September 26, 2007 for the above referenced project. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: ® Incorrect and/or missing wetland, intermittent-perennial stream and/or buffer impacts. DWQ is unable to review this project without noted or corrected impacts reflected. The fact that impacts are for restoration purposes does not remove them from consideration for 401 certification. See Other. ® OTHER: 1. A review of the application (page 8) reflects no impacts. However, the cover letter reflects 870 feet of restoration/relocation impacts. Please note these impacts on Page 8 and submit five (5) copies for review. Please contact the DWQ within three weeks of the date of this letter to verify that you have received this letter and that you remain interested in continuing to pursue permitting of your project and will be providing the DWQ the requested information at a later date. Please contact this office in writing. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as returned. No°i tltCazolina 401 OversighdExpress Review Permitting Unit ,~Q~tICQ~r/!f 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 /Internet: h~::712~_enrstate.nc.us-nctivetlands An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper This letter only addresses the application review and does net authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Mr. Ian McMillan or me at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss this matter~'~ :~ ~,;I ,<.a "_y >,' -. --7 3 Sinc e , CBK/rnj Cyndi Karoly, Supervisor ~Ol Oversight/Express Review Permitting Unit cc: Kevin Barnett, DWQ Asheville Regional Office USACE Asheville Regulatory Field Office Wetland and Natural Resource Consultants, Kevin Mitchell, P.O. Box 882, Canton, NC 28716 File Copy Central Files Filename: 071647HardRockMine(Cherokee)_Hold_Impacu x~