Loading...
HomeMy WebLinkAbout20141169 Ver 1_On-Hold Letter_20150127PWAA NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor CERTIFIED MAIL - RETURN RECEIPT REQUESTED Mr. Richard W. Hancock, P.E., Manager Project Development and Environmental Analysis North Carolina Department of Transportation 1598 Mail Service Center Raleigh, North Carolina, 27699 -1598 Donald van der Vaarl Secretary January 27, 2015 Subject: Proposed improvements to US 17 from south of Belgrade at SR 1330/SR1439 to the New Bern Bypass in Onslow, Jones, and Craven Counties, TIP R -2514 B, C, & D. NCDWR Project No. 20141169 Dear Mr. Hancock: The Division of Water Resources has reviewed your submittal for a 401 Water Quality Certification for the aforementioned project. Review of your application revealed it lacking necessary information required for making an informed permit decision. The permit application was deficient in the following areas: • Section B — At Site 14, it appears as if the fill impact and excavation impact numbers are reversed; please verify if the presented impact are correct. • In the application, Table 1, R- 2514B, the stated subtotal of permanent wetland impacts (9.63 acres) do not total the sum of the impacts presented nor the impacts summary sheet (9.59 acres). Please verify. • Section C — The Stormwater Management Plan states that approximately 2/3d' of the project is located in the Neuse River Basin, which is a riparian buffer basin. However, the plan does not include a Swale summary table as does Section D. Please forward a summary for this area. • Section C — There are two sets of impacts for power lines; one has impact sites 1 -5 and the other has impacts sites 1 -27. Please resolve this discrepancy. • Section D — At Utility Site I there appears to be power pole /line relocations. The amount of hand clearing requested seems to be excessive for the proposed activity. Please explain why this amount of clearing is necessary. • Section D — At Utility Site 2 the amount of hand clearing proposed seems excessive for the proposed utility relocation. Pleases explain why this amount of clearing is necessary. Therefore, pursuant to 15A NCAC 2H .0507(a)(5), we will have to place the permit application on hold until we are supplied the necessary information. You have 21 days to respond in writing with the requested information or notification to this office that the information is forthcoming. If, at the end of the 21 days, this office has not received this information in writing, we will assume you are withdrawing your application and it will be returned. Furthermore, until the information is received by the NC 1617 Mail Service Center, Raleigh, North Carolina 27699 -1617 Phone: 919 - 807- 63001Internet: www.ncdenr,gov An Equal opportunity 1 Alfrmalive Action Employer Division of Water Resources, we request (by copy of this letter) that the US Army Corps of Engineers place the permit application on hold. If you have any questions or require additional information, please contact David Wainwright at (919) 707 -8787 or David. Wainwright @ncdenr.gov. Sincerely, S. Jay Zimmerman, Acting Director Division of Water Resources Electronic copy only distribution: Gordon Cashin, NC Department of Transportation Tom Steffens, US Army Corps of Engineers, Washington Field Office Colin Mellor, NC Department of Transportation Chris Rivenbark, NC Department of Transportation Dr. Cynthia Van Der Wiele, US Environmental Protection Agency Steve Sollod, NC Division of Coastal Management File Copy