HomeMy WebLinkAboutSWA000176_Construction Sequence_20221201[IMMOORECOUNTY
SCHOOLS
14PENGAGE • INSPIRE • SUCCEED
Track Et Field Renovations
North Moore High School
Moore County Schools
1504 N.Moore Rd.
Robbins, NC
State Stormwater Fast -Track ATC Permit
Construction Sequence
Submittal #1
November 16, 2022
A Ro'�
0 625
►NE . v
Prepared by:
CLH Design, pa
Stormwater Construction Sequence
Proposed Proiect
North Moore High School is renovating the existing 400-m running track and associated field events on
the school campus at 1504 N. Moore Rd. in Robbins, NC. The renovations will include the removal of the
existing track pavement and reconstruction in the same location. Existing pavement of the existing field
events will also be removed and reconstructed with the locations being adjusted slightly. The majority of
the grass play field inside the track will remain undisturbed.
Just under two (2) acres of ground will be disturbed during construction which is scheduled to begin in in
late Fall of 2022 and continue for approximately five months.
The campus has an existing High -Density State Stormwater Management Permit (SW6 190501) that was
issued on May 29, 2019 associated with a project titled North Moore High School Renovation and
Addition. The permit covers the entire 49.57-acre school property. It is believed this is the first and only
State Stormwater Permit issued for this site.
The 2019 project added 28,709-sf of new built -upon area (BUA) and included the construction of a new
bioretention cell to manage runoff from the new BUA.
Future Development
There is no future development proposed following the currently proposed Track & Field Renovations
project, however other improvements on the school campus in the future are likely. Future improvements
will require subsequent modifications to the campus's SW6 190501 permit. Compliance with current
stormwater rules will likely require additional SCMs or demonstration of compliance with Runoff
Volume Match.