Loading...
HomeMy WebLinkAboutSite Inspection Br 79 Tellico Non-CompliantWetland Inspection Report Project Num: 20201576 Version: 2 Project Name: NCDOT - Replace Bridge 79 on SR 1369 County: Macon Location: NCDOT - Replace Bridge 79 on SR 1369 Latitude: +350 16' 33" SW Plan Location: Site Owner Name: NC DOT Division 14 - Sylva Inspection Date: 11/30/2022 Reason for Inspection: Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: Title: On -Site Representative(s): Primary Inspector: Robert K Mitchell Secondary Inspector(s): Facility Compliance Status: ❑ Compliant 0 Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Status: Issued Project Type: Replace bridge with bridge Region: Asheville Longitude: -83' 30' 30" Phone: Phone: Inspection Summary: Site inspection was conducted on November 30, 2022 by Kevin Mitchell with the Asheville Regional Office. Parker Keys was present during the inspection. NPDES records were available, but were not complete. Last week needs to be completed and signed. page: 1 Site Number: 20201576 Owner: Blazer, Keith Inspection Date: 11/30/2022 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WOO Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? ❑ 0 ❑ ❑ Comment: NPDES records were not up to date Condition #8 of GC 4135 states "An NPDES Construction Stormwater Permit (NCGO10000) is reauired for construction projects that disturb one (1) or more acres of land. The NCGO10000 Permit allows stormwater to be discharged during land disturbing construction activities as stipulated in the conditions of the permit. If the project is covered by this permit, full compliance with permit conditions including t1 erosion & sedimentation control plan, inspections and maintenance, self -monitoring, record keeping and reporting requirements is required. [15A NCAC 02H .0506 {b (5) and (c)(5)1 The North Carolina Department of Transportation (NCDOT) shall be required to be in full compliance with the conditions related to construction activities within the most recent version of their individual NPDES (NCS000250) stormwater permit. [15A NCAC 02H.0506(b)(5) and (c)(5)1 page: 2