Loading...
HomeMy WebLinkAbout20221669 Ver 1_Shoreline Stabilization_20221129ROY COOPER Governor MICHAEL S. REGAN secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality State of North Carolina Department of Environment Quality Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 09-2020 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service Paul Wojoski DWR — 401 & Buffer Permitting Branch 1617 Mail Service Center Raleigh, NC 27699-1617 If sending via delivery service (UPS, FedEx, etc.) Paul Wojoski DWR — 401 & Buffer Permitting Branch 512 N. Salisbury Street Raleigh, NC 27604 NOTE: Before submitting this form, please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) which states "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency." In accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5), all certification requests must include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pre -Filing Meeting Request to this application. Date of Pre -filing Meeting\Reg9Eft: 1. /_/ (required) DWR ID # Version (if applicable) A. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: Janice Escandon Mailing Address: 625 Wiley Court Telephone Number: E-mail Address: Deparbnem of End.onmeadl WaOry� Merritt Island, FL 32952 704-425-5826 Fax Number: RECEIVED NOV 2 9 DEQ-WATER RESOURCES 401 & BUFFER PERMITTING North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh. North Carolina 27699-1617 919.707.9000 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: http://www.saw.usace.army.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.pdf) Name: N/A Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: B. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Rowan Nearest Town: Salisbury Lake/ river/ ocean adjacent to property: High Rock Lake Property size (acres): 0.48 acres Subdivision name or site address (include phase/lot number): Lots 2 & 3, A Summer Place, 235 Holiday Drive, Salisbury Directions to site - please include road names and numbers, landmarks, etc.: 1-85 to Innes St. exit, east on Innes St., L on Stokes Ferry Rd., L on Providence Church Rd., R on Bringle Ferry Rd., L on Scout Rd., R on Holiday Dr., parcel on the left. Latitude (in decimal degrees) 35.37.1563 Longitude (decimal degrees) 80.16.5644 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Developed lots in residential subdivision FORM: SSGP 09-2020 Page 2 of 6 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): To stabilize an eroding shoreline and protect it from further erosion. 7. Will work be conducted from land? From water? ❑ 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: 110 sq. ft. Temporary impacts in square feet: None 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: 310 sq. ft. Temporary impacts (temporary clearing, construction corridor) in square feet: 275 sq. ft. 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): No trees will be removed to install the proposed shoreline stabilization. 11. Signature By signing below, I, as the project proponent, certify to the following: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time wner/Agent's Signature* [15A NCAC O2H .O5O2(f)1 Date "Agent's signature is valid only if an authorization letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation FORM: SSGP 09-2020 Page 3 of 6 d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Lake (At Full Pond/ Normal Water Level) Full Pond/ Normal Water Level -- NM MI um Shoreline Plan View ME MAI MIMI EMU 1111127 Full Pond/ Normal Water Level shoreline ... 2 ft. x 150 ft. additional clearing •If necessary E Plan View Lake (At Full Pond/ Noma) Water Level) Ri pra p Existing Dock 30ftx 70 3ftx150ft Below full pond/ NWL awlowe map ft7150ft ASove full pond/ NWL AMPLE FORM: SSGP 09-2020 Page4of6 La ke (At Full Pond/ Normal Water Level) Side View FORM: SSGP 09-2020 Page 5 of 6 2 ft. additional clearing 3 ft. below full pond water level ` 4 ft. above full pond water level •If necessary I 1 I I 10 ftbank height Side Vi FORM: SSGP 09-2020 Page 6 of 6 NCDEQ 401 WATER QUALITY CERTIFICATION SHORELINE IMPACT AREA CALCULATIONS APPLICANT: Janice Escandon Lots 2 & 3, Summer Place STABILIZATION IMPACT AREA CALCULATIONS The attached shoreline site plan shows 55 LF of proposed shoreline stabilization measures. Detail 3 indicates a proposed shoreline slope that is graded at 2:1 and reflects the estimated normal pool level and the estimated height of the subject shoreline above the normal pool level. Calculation 1— Impact Area Below Normal Pool Level (Item 8 on NCDEQ Form SSGP 09-2020) Area of Impact = Shoreline Length x Depth* x Slope = (55') x (1') x (2) = 110 sq. ft. *For this calculation, an average water depth of 1 ft. has been assumed. This will produce a conservative overestimate of the stabilization impact area. Calculation 2 — Impact Area Above the Normal Pool Level (Item 9 on NCDEQ Form SSGP 09-2020) Permanent Impact From Shoreline Stabilization Measures Height of Bank Above Normal Pool Varies Across the Shoreline Estimate 10 LF of Shoreline = 2 ft. Above Normal Pool Estimate 45 LF of Shoreline = 3 ft. Above Normal Pool Area of Impact = Length x Height x Slope _ (10' x 2' x 2) + (4 5' x 3' x 2) = 40 + 270 = 310 sq. ft. Impact From Construction Above Shoreline Stabilization Assume 5 ft. Wide Zone Area of Impact = 55' x 5 ft. = 275 sq. ft. Total Area of Impact Above Normal Pool Level = 585 sq. ft. / Ci 1' \ , /r f 0 \ t 3 Scale 1" = 20' SITE PLAN - JANICE ESCANDON /\\ / 1 • j 3 CLASS 2 RIP RAP VEGETATION AND EROSION CONTROL FABRIC 1 EROSION CONTROL FABRIC TYPICAL CONDITIONS • 36" TO 72" ERODED CUT • WAVE EXPOSURE EXISTING GRADE Varies 2-3 ft. Assume 1 ft. //\\\\/ LAKE BOTTOM _ FOR: LOCATION: RESERVOIR: JANICE ESCANDON LOTS 2 & 3, SUMMER PLACE HIGH ROCK LAKE PROJECT: SHORELINE STABILIZATION PROGRAM PHASE I SITE EVALUATION YADKIN, INC. - BADIN, NORTH CAROLINA DRAWING TITLE: MODERATE RIP RAP STABILIZATION DETAIL 3 1111110.a., i III�lw 11/22/22, 2:06 PM 235 Holiday Dr - Google Maps o:;gle Maps 235 Holiday Dr ar Hill's Minnow Farrr.9 B E Waller & Son riM3. Liberty Vc. •• • Fire Department , ,t Matth Jtheran Church Jones Mann€ P 1.9 *Rock <ake :'35 Huhdav Dt, =;n Salisbury' NC 2814F, Eagle Pointy Nature Preserve Go=.eagle Stoney Point I T.iayenl High Rock Dar l : - .n Water Plant9 High Rock Pooletown Map data ©2022 2000 ft i https://www.google.com/maps/place/235+Holiday+Dr,+Salisbury,+NC+28146/@35.6144674,-80.278835,14z/data=!4m513m4! 1 s0x88538f5a 1 d47776d:Ox4ade9d0914de9e0d!8m2 Bd35.6210105!4d-80.2... 1/1