Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutRE_ _EXTERNAL_ 17BP_9_R_72 demo plan_DOTCarpenter, Kristi
From:
Euliss, Amy
Sent:
Wednesday, November 23, 2022 9:11 AM
To:
Byrd, Barry L; hollandyouungman@fws.gov
Cc:
Eric.C.Alsmeyer@usace.army.mil; Wanucha, Dave; McHenry, David G; Jones, Scott A;
Kirk Johnson
Subject:
RE: [EXTERNAL] 17BP.9.R.72 demo plan -DOT
Good morning, Holland. I wanted to touch base and see if you needed anything further to approve the demo
plan. Thanks.
Amy
From: Byrd, Barry L <blbyrdl@ncdot.gov>
Sent: Thursday, November 3, 2022 2:21 PM
To: hollandyouungman@fws.gov
Cc: Euliss, Amy <aeuliss@ncdot.gov>; Eric.C.Alsmeyer@usace.army.mil; Wanucha, Dave <dave.wanucha@ncdenr.gov>;
McHenry, David G <david.mchenry@ncwildlife.org>; Jones, Scott A <sajones8@ncdot.gov>; Kirk Johnson
<kirk@smithrowe.com>
Subject: RE: [EXTERNAL] 17BP.9.R.72 demo plan
Holland,
See Kirk's response below concerning the saw cutting of Bent 3. Please let us know if you have further questions or
concerns.
Thanks,
Barry L. Byrd
Assistant Resident Engineer
Division 9
Winston-Salem Construction Office 1
336 293 9610 office
blbyrdl ncdot.gov
403 Polo Rd
Winston-Salem, NC 27105
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Kirk Johnson <kirk@smithrowe.com>
Sent: Wednesday, November 2, 2022 6:44 PM
To: Byrd, Barry L <blbvrdl@ncdot.gov>
Cc: Jones, Scott A <sajones8@ncdot.gov>
Subject: RE: [EXTERNAL] 17BP.9.R.72 demo plan
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Barry,
In response to Holland's question —we do not anticipate very much slurry during this cutting process. We can use
absorbent socks around the bent when cutting just to ensure any slurry is controlled.
Thanks,
Kirk Johnson
Project Manager
Smith -Rowe, LLC
639 Old US-52 South
Mount Airy, NC 27030
NCGCL# 70021
(336) 789-8221 Office
(336) 705-0349 Cell
From: Byrd, Barry L <blbvrdl@ncdot.gov>
Sent: Tuesday, November 1, 2022 9:59 AM
To: Kirk Johnson <kirk@smithrowe.com>
Cc: Jones, Scott A <salones8@ncdot.gov>
Subject: FW: [EXTERNAL] 171313.9.11.72 demo plan
External Email: Use CAUTION with Links and Attachments.
Kirk,
Can you please provide a response to the questions below regarding the saw -cutting and catchment system for Bent 3
demo?
Thanks,
Barry L. Byrd
Assistant Resident Engineer
Division 9
Winston-Salem Construction Office 1
336 293 9610 office
blbvrdl ncdot.gov
403 Polo Rd
2
Winston-Salem, NC 27105
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
From: Youngman, Holland J <hollandyoungman@fws.gov>
Sent: Friday, October 28, 2022 10:59 AM
To: Euliss, Amy <aeuliss@ncdot.gov>; Alsmeyer, Eric C CIV USARMY CESAW (USA)<Eric.C.Alsmever@usace.army.mil>
Cc: Wanucha, Dave <dave.wanucha@ncdenr.gov>; McHenry, David G <david.mchenrv@ncwildlife.org>; Byrd, Barry L
<blbvrdl@ncdot.gov>; Jones, Scott A <saiones8@ncdot.gov>; Kirk Johnson <kirk@smithrowe.com>
Subject: Re: [EXTERNAL] 17BP.9.R.72 demo plan
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Thank you for providing this, Amy.
I've reviewed the demo plan and shared it with Jay Mays for his review as well. There are no concerns from Jay's end
and my only question is regarding the saw -cutting of bent 3. I'm trying to picture how much slurry may be created
during the cutting. Is there any sort of catchment system planned to capture that? Or is it expected to be such a minimal
amount that there's no cause for water quality concerns?
Thanks and Happy Friday,
Holland Youngman
(she/her)
Wildlife Biologist
U.S. Fish and Wildlife Service
Asheville Ecological Services Field Office
160 Zilticoa Street, Asheville, North Carolina, 28801
Cell: 828-575-3920 Office: 828-258-3939 x42235
From: Euliss, Amy <aeuliss@ncdot.gov>
Sent: Thursday, October 20, 2022 9:59 AM
To: Youngman, Holland J <holland Youngman@fws.gov>; Alsmeyer, Eric C CIV USARMY CESAW (USA)
<Eric.C.Alsmever@usace.army.mil>
Cc: Wanucha, Dave <dave.wanucha@ncdenr.gov>; McHenry, David G <david.mchenrv@ncwildlife.org>; Byrd, Barry L
<blbvrdl@ncdot.gov>; Jones, Scott A <saiones8@ncdot.gov>; Kirk Johnson <kirk@smithrowe.com>
Subject: [EXTERNAL] 17BP.9.R.72 demo plan
This email has been received from outside of DOI - Use caution before clicking on links, opening
Fattachments, or responding.
Holland and Eric,
The demo plan for the removal of the bridge over the Dan River on NC 704 is attached for your review. The USACE and
DWR permits, and the BO are attached for reference. We ask that you get comments back prior to Nov. 41" if your
schedule allows. Thanks.
Amy Euliss
Division 9 PDEA Engineer
North Carolina Department of Transportation
336 747 7802 office
aeuliss ncdot.gov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.