Loading...
HomeMy WebLinkAboutNCC223911_ESC Approval Submitted_20221128DocuSicin Envelcoe ID. 6CA47lE4-B22C-4206-8B7F-[:2r-DRIRC.Fngz ROY COOPER Governor ELIZABETH S. BISER 5ecretnr y BRIAN WRENN Direcrcr NORTH C1ARO INA EmAronrnent€rt Quality October 4.2022 LETTER OF APPROVAL WITH MODIFICATIONS Men in Motion Home Renovations, LLC Attention: Rosa Mitchem, Member PO Box 38858 Charlotte, North Carolina 28278 RE: Project Name: Gene Court Project ID: CABAR-2022-061 Acres Approved: 5.247 County: Cabarrus City: Concord Location: Gene Court River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: CESI Date Received by LQS: September 21, 2022 Plan Type: Revised Dear Ms. 'Mitchem: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title i SA NCAC 413 _0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eN01) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deg.nc,gov:'NCGO 1. Please direct questions about the eN01 form to the Stormwater Program stafT in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible parry must obtain a new COC. Title 15A NCAC 413.0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. North Carolina Depar4ment of Environmental Qaahry Di%tazun of Energy_ Mineral and Resourres Mooresville Regina] Office 1610 Fast Center Avenue, Suite 301 Moorestiitle, North Carolina 28 t iS 704663.1699 DOWSign Envelope ID: 6CA471E4-B22C-4206-867F-C2CD658CFD91 Letter of Approval with Modifications Men in Motion Horne Renovations, LLC October 4, 2022 Page 2 of 3 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural.resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is Inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Enclosures: Certificate of Approval Modifications Required for Approval NCGOI Fact Sheet CESI Attn: Nick Buysee PO Box 268 Concord, NC 28026 Sincerely, IllocuSigned i>y: 8B37DAC4A10t 49A.__ Kenny S. L1yweIyn Assistant Regional Engineer Land Quality Section North C—luna Depart.ent of Eavi..=BW Quality Di AkOn of Energy; Mineral and Resnurew M-resvnlie Regival office 1610 East CenterAvenae, Suite 30I Mooresville North Cuotina 28I I5 700663.1699 Vocu5ign Envelope ID_ SCA471 F4-822C-4206-887F-C2C0B58CFD91 Letter of Approval with Modifications Men in Motion Home Renovations, LLC October 4, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Gene Court Project ID: CABAR-2022-061 County: Cabarrus Reviewed by: Kenny S. Llywelyn 1. Add diversion between each lot in final phase of development for post construction drainage. 2. Add lot development plan including individual measures for each lot. Add diversion along wetland to basin. Since there is a wetland on the other side of the silt fence. There is no buffer a diversion channel is needed for when the silt fence is removed and there is a large slope uphill of the wetland. �5. E Q 2 .,r a�oraM� North Catoiina Department of Env=,=ental Quality Di Asion of Fa&V, lv[ineral and Resct=W Mnoresviile iieginal offioe I610 East Center Avenue, Suite 301 [vtonresville, North Cu alina 28115 704.663.1699