Loading...
HomeMy WebLinkAboutGW1-2022-10228_Well Construction - GW1_20221111 1,W ontractor 1nf matron: —V �ftt_g :J�cuf 14:.WATER ZONES FROM TO DESCRIPTION Well Co or time R ft NC Well Contractor Certiocation Number 15:OU�ER.CASING,(ior mnlfi=dasediwe]Ls)OR Morgan Well&Pump;Inc. FRoM TO' DIAMETER TRIclaliEss MATERIAL +1 ft ft 61181 sdr21 pvc Company Name � .,�,�-1 16.`�.R CAS'Il�TG OR•TOBING'-entlier'tuslclo'sed-moo' 2.Well Construction Permit#: otk •�j,�—ty+ FROM TO DIAMETER TJ�CFQIFSs .:: MAT'ERIAL' List all applicable well constmctfonpermits'(t e.UIC,Cowdv,S=e,Ymiance,etc-)' ff ft in. S. ft in. 3.Well Use(check well use): -SCREEN',-*,.-..:,:fl _ .:r,. . . . .. VAgdcuitural ply Well: FROM TO DLIMETER SLOT SIZE yTTirclamS MATERIAL. EDMunicipal/Public ft ft in. al(Heating(Cooling Supply) Residential Water Supply(single) ft " fcCommercial 1 Residential Water Supply(shared) IIIi atiOn FROM TO MATERIAL EMP CEMENT METHOD&AMOUNT Non-Water Supply Well: o ft 20 ft bentonite poured Monitoring DRecovery ft ft. snjection.Well: ft ft Y!Aquifer Recharge Q Groundwater Remediation 19:SgND/trRAVEL'P9 CK tf 2-PP"Iicafire Aquifer Storage and Rec&ery OSalinity Bawer FROM TO MATERIAL E T METHOD Aquifer Test DStormwater Drainage ft i Experimental Technology OSubsidence Control ft. IrIEOr�'�•►3 f;ram r Geothermal(Closed Loop) OTracer :ZD.DI2ILLING.DOG'(itticY ddidail sheetsifrecess '-:. I TO DESCRIPTION(color,hardness,soil/rock type,grain size etc) Geothermal(Heating/Cooling Retum) Other(explain under#21 Remarks) d It 2 d ft ft 4.Date Well(s)Completed: b 2' Well ID# � ft ft ft S�a Well Location:: /', Facility/Owner Name Facility ID#(ifapplicable) S ft G S�SZ W�Sara. L�l Irc Lk Care,, itt u(.Z4�� ft ft ft A'calAddress,City,and Zip ta3—�53`"�� •21.12>:'MbRua'-- _ - - - -= --- - - '- - 1545 county Parcel Identification No.(PIN) Sb.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (tfwell field one]aUlong is sufficient) Q 2 cation: 1S . 3d N Do.�53 W A 2Z 6.Is(are)the well(s)*Permanm or Temporary Sign f ed Well Contractor Date B o ung is form,I hereby certify that the well(s)was(wet'e)constructed in accordance 7.Is this a repair to an existing well: []Yes or f No wuh 15A C 02C.0100 or 15A NCAC 02C.0200 Well Construction Standen ds and that a If this is a repair,fLl out known we;construction ififormatfon and explain the nature of the copy ofthii record has been provided to the,well owner. repair under#21 remarks section or on the back of thisforuL 23.Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same construction details. You may also attach additional pages if necessary. constmctioA only 1 GW-1 is needed. Indicate TOTAL NUMBER'of wells drilled: SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: op (ft-) 24a. For All Wells: Submit this film within 30 days of completion of well For multiple wells list all depths ifoUf$erent(example-3Q200'and 2(100) construction to the following. i 10.Static water level below top of casing: -a (it) Division of Water Resources,Information Processing Unit, Ifwater level is above casing,use"+" 1617 Mail Service Center,Raleigh,NC 27699-1617 11.BorehoIe diameter: 6 (ia.) 24b.For Iniection Wells: In addition to sending the fbrm to the address in 24a above, also submit one copy of this form within 30 days of completion of well 12.Well construction method: r—UI LAL� construction to the following: (Le.auger,rotary,cable,direct push,etc.) Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 2 769 9-1 63 6 13a.Yield(gpm) \C/ Method of test: air pressure 24c.For Water Supply&Injection Wells: In addition to sending the form to ���(j the address(es) 'above, also submit one copy of this form within 30 days of 13b.Disinfection typ Amount: UOZ completion of well construction to the county health department of the county where constructed. Revised 2-22 2016 Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources