Loading...
HomeMy WebLinkAboutGW1-2022-10169_Well Construction - GW1_20221110 Print Form WELL CONSTRUCTION RECORD(GW-� For[eternal Use Only: —tF 1.Well Contractor Information: Chris King RF=r.R y r) 14,WATER ZONES Well Contractor Name FROM TO I DESCRIPTION 2080-A NOV 1 0 2022 ft rt NC Well Contractor Certification Number It. (wprtiww).1 Proca"W*UM 15.OUTER'CASING fo0 ft_r multi asedtiells OR LINER da licable ' Aqua Drill, Inc. Ci�NO/@rJG FROM ro ff T1ICKNESS MATka Company Name 16.INNER'CASING OR TUBING'(geothermal close&loo , 2.Well Construction Permit#YG FROM TO D/M>ETER THICKNESS MATERIAL List all applicable well construction permits fl-e.UIC,Cmmo,,State,Variance,etc.) ffi ft in 3.Well Use(check well use): tt. ft in. Water Supply Well: 17.SCREEN FROat TO DIAMETER SLOTSIZE THICKNESS MATERIAL Agricultural OMutncipal/Public tt tt. in. Geothermal(Heating/Cooling Supply) Z idential Water Supply(single) R ft. in. lndusftiaUCommercial DResidential Water Supply(shared) 1-1 iS:.GROUT hri ation FROM I TO atATERML EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: ft Monitoring Recovery ft, g Injection Well: Aquifer Recharge nGroundwater Remediation R. ft Aquifer Storage and Recovery19.SAND/GRAVEL PACK if licabie S8liaity Barrier FROM TO I MATERIAL, EMPLACEMENT METHOD Aquifer Test 0StormwaterDrainage ft. ft Experimental Technology oSubsidence Control ft. ft. i I Geothermal(Closed Loop) (`)Tracer 20.DRILLiNGLOG attach additional sheets if necess Geothermal eating/Cooling Return Other(explain under#21 Remarks FROM I TO DESCRIPTION color hardness,soNrock i7p a safe siz etc ffi ft 4.Date Weil(s)Completed:) !r i a z Well ID# ft. ft 5 1-1) t ©C fi 5a.Well Location: E ft 5"'it l u e 6`-13 1 G % ft. Facility/Owner Name Facility IDp(if applicable) ft it. ft ft- Physical Address,City,and Zip �) ft ft [ 2— cl 21.REMARKS County Parcel identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one Wong is sufficient) 22.Certify tlon: 6.Is(are)the well(sermanent or Temporary Signature of certified ell Con for Date J + By signing this form,I hereby certify that the well(s)was(were)constructed in accordance 7.Is this a repair to an existing well: 0Yes oro with 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a If this it a repair,fill out!blown well construction information and explain the nature of the copy of this record has been provided to the well owner. repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well site details or well construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells construction details. You may also attach additional pages if necessary. drilled:_ SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: (R-) 24a.For All Wells: Submit this form within 30 days of completion of well For multiple welts list all depths ifdii different(example-3 r@200'and 2Q100) construction to the following: 10.Static water level below top of casing: 5— (ft.) Division of Water Resources Information Processing Unit If ureter level is above casing,use"+" + g , 1617 Mail Service Center,Raleigh,NC 27699-1617 1 L Borehole diameter: (mJ) 24b.For In-ection ells: In addition to sending the form to the address in 24a 12-Well construction method: JA 1 LL C 17— j above,also submit one copy of this form within 30 days of completion of well (i.e.auger,rotary,cable,direct push,etc,) construction to the following: FOR WATER SUPPLY WELLS ONLY: Division of Water Resources,Underground Injection Control Program, 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield m ` (gP ) Method of test:� 24c.For Water Supply&Injection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 136.Disinfection type: Amonnk 2- completion of well construction to the county health department of the county where constructed. I Form GW-I North Carolina Department of Environmental Quality-Division of Water Resources Revised 2-22-2016