Loading...
HomeMy WebLinkAboutGW1-2022-10133_Well Construction - GW1_20221110 WELL CONSTRUCTION RECORD For Internal Use ONLY: This form can be used for single or multiple wells I.Well Contractor Information: 14'W"TERZONEs GARRETT CLYDE BANKS l FROM TO DESCRIPTION Well Contractor Name ft. ft. 4519-A ft. ft. E NC Well Contractor Certification Number 15.'OUTER CASING(for'multi-casedwells)ORLINER(ifa` lieable FROM TO DIAMETER THICKNESS MATERIAL CLYDE SAWYERS & SON WELL & PUMP INC +1 ft. 77 ft• 6 v4 #21 1 PVC Company Name 16 INNER CASING OR TUBING eothermal closed-loo 2022-00024 FROM TO DIAMETER THICKNESS MATERIAL 2.Well Construction Permit#: ft. ft in. List all applicable well permits(i.e.Couny"Slate. Variance,injection,etc.) ft. fL in. 3.Well Use(check well use): 17.SCREEN Water Supply Well: FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL ft. ft. in. ❑Agricultural ❑Municipal/Public ❑Gcothernial(Heating/Cooling Supply) i7Residential Water Supply(single) ft. ft. in.; ❑Industrial/Commercial ❑Residential Water Supply(shared) t8.GROUT FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT ❑Irrigation 0 ft. 20 ft- Bentonite Pumped Non-Water Supply Well: ft. ft. ❑Monitoring ❑Recovery Injection Well: ❑AgLiiferRecharge ❑GroundwaterRemediation 19.SAND/GRAVEL PACK:ifa lieable FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Storage and Recovery ❑Salinity Barrier ft. ft. ❑Aquifer Test ❑Stonnwater Drainage ft. ft. ❑Experimental Technology ❑Subsidence Control 20:-DRILLING LOG'attach'addi8onallsheets if necessary): ❑Geothermal(Closed Loop) ❑TIaceI FROM TO DESCRIPTION color,hardness,soil/rock type,grain size,etc. []Geothermal(Heating/Cooling Return) ❑Other(explain under 921 Remarks) 0 ft' 77 ft• OVER BURDEN 10-11-2022 77 ft• 505 ft• GRANITE 4.Date Well(s)Completed: Well iD# tt. tt. 5a.Well Location: Benjamin Whittle Facility/Owner Name Facility ID#(ifapplicable) 74 Morgan Hill Road Fairview, NC 28730 ft. Physical Address,City,and Zip 21.REMARKS Buncombe 0616903344 o ursil County Parcel Identification No.(PIN) 5b.Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22.Certification: (if well field,one]at/long is sufficient) N W 11-3-2022 Signature ofCertu Well Contractor Date 6.Is(are)the well(s): ❑✓Permanent or ❑Temporary By signing this form,I herebv certify that the well(s)was(were)constructed in accordance with 15A N(:AC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a 7.Is this a repair to an existing well: ❑Yes or EINo copy gfthis record has been provided to the well owner. //'Ibis is a repair.Jill oul known well construction inlirrnralion and erplain the nature o0he repair under#21 remarks section or on the back q(this.1brm. 23.Site diagram or additional well details: You may use the back of this page tto provide additional well site details or well 8.Number of wells constructed: construction details. You may also attach additional pages if necessary. For InIthiple injection or norr-waler.supph•we Us ONLY with the scone construction,um can sol„r,il one form. SUBMITTAL INSTUCTIONS 9.Total well depth below land surface: 505 (ft.) 24a. For All Wells: Submit this,form within 30 days of completion of well For nm6iple wets list all depths il'dt/ferent(example-3@200'and 2C100') construction to the following: 10.Static water level below top of casing: 60 Division of Water Resources,Information Processing Unit, l/iiatvr level is above casing,use"+" 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: 6.25 (in.) 24b.For Iniection Wells ONLY: inraddition to sending the form to the address in ROTARY 24a above, also submit a copy of this form within 30 days of completion of well 12.Well construction method: construction to the following: (i.e.auger,rotary,cable,direct push,etc.) Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield m 5 Method of test: RIG 24c.For Water Supply&Injectioli Wells: (gp ) Also submit one copy of this forrii within 30 days of completion of 13h.Disinfection type: PILLS Amount• 20 well construction to the county health department of,the county where constructed. Poraei GW-I North Carolina Department of Environment and Natural Resources-Division of Water Resources Revised August 2013 t