Loading...
HomeMy WebLinkAboutGW1-2022-10120_Well Construction - GW1_20221110 WELL CONSTRUCTION RECORD For Internal Use ONLY: This firm can be used for single or multiple wells I.Well Contractor Information: GARRETT CLYDE BANKS FROM ERzO FROM TO DESCRIPTION Well Contractor Name 4519-A NC Well Contractor Certification Number 15.OUTER CASING for multi-cased wens OR LINER(ifa lieable FROM TO DIAMETER , THICKNESS MATERIAL CLYDE SAWYERS & SON WELL & PUMP INC +1 ft. 48 ft. 6 1/4 ' #21 PVC Company Name 16.INNER CASING OR TUBING eothermalsclosed400 2022-002`+8 FROM TO DIAMETER THICKNESS MATERIAL 2.Well Construction Permit#: V ft• ft. I in. List all applicable well permits(i.e.Couno,,State. Variance,htjec:ion,etc.) ft. ft. in. 3.Well Use(check well use): 17.'SCREEN , Water Supply Well: FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL ft. ft. in. ❑Agricultural ❑Municipal/Public ❑Geothermal(Heating/Cooling Supply) ElResidential Water Supply(single) ft. ft. in• ❑Industrial/Commercial ❑Residential Water Supply(shared) I8 GROUT FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT ❑Irrigation 0 ft' 20 it- Bentonite Pumped Non-Water Supply Well: ft. ft. ❑Monitoring ❑Recovery Injection Well: ft. ft. ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVELTACK if applicable) FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Storage and Recovery ❑Salinity Barrier ❑Aquifer Test ❑Stonnwater Drainage ft. tt. ❑Experimental Technology ❑Subsidence Control 20.DRILLING LOG(attach additional sheets ifnecessa ' ❑Geothermal(Closed Loop) ❑Tracer FROM TO DESCRIPTION color,hardness,soil/rock type,grain size,etc. ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) 0 ft. 8 ft. OVER BURDEN 9-21-2022 48 ft- 265 ft- GRANITE 4.Date Well(s)Completed: Well ID# ft. ft. 5a.Well Location: Christina Fisher ft. ft. Facility/Owner Name Facility ID#(if applicable) ft. ft. 11 Douglas Drive Leicester, NC 28748 f. Physical Address,City,and Zip 21.REMARKS, Buncombe 97004694280000 ola�ls5tya'�WQ Coumv Parcel Identification No.(PIN) D1 3Oo 5b.Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22.Certification; (if well field,one lot/long is sufficient) T_�f N W 10-28-2022 Signature of Cent Well Contractor Date 6.Is(are)the well(s): ❑✓Permanent or ❑Temporary Br signing this Jorm,l hereby certify that the well(s)was(were)constructed in accordance With 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a 7.Is this a repair to an existing well: ❑Yes or ElNo copy gf1his record has been provided to the well owner. If this is a repair.Jill out known well construction inJbrmation and explain the nature ofthe repair under#21 remarks section or on the hack of thisJorm. 23.Site diagram or additional well;details: You may use the back of this page to provide additional well site details or well 8.Number of hells constructed: 1 construction details. You may also attach additional pages ifnecessary. For multiple injection or non-water supple wells ONLY with the same construction,you can submit one form. GC SUBMITTAL INSTUCTIONS 9.Total well depth below land surface: 265 (ft.) 24a. For All Wells: Submit this form within 30 days of completion of well For multiple wells list all depths if dt(jerent(example-3 a 200'and 2@ 100') construction to the following: 10.Static water level below top of casing: 20 Division of Water Resources,Information Processing Unit, if it level is above casing,use'+ 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: 6.25 (in.) 24b. For Injection Wells ONLY: In addition to sending the form to the address in ROTARY 24a above, also submit a copy of this form within 30 days of completion of well 12.Well construction method: construction to the following: (i.e.auger,rotary,cable,direct push,etc. Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 I 13a.Yield(gpm) 50 Method of test: RIG 24c.For Water Supply&Injection!Wells: Also submit one copy of this form within 30 days of completion of 13h.Disinfection type: PILLS Amount: 30 we!I construction to the county health department of the county where constructed. Foram GW-I North Carolina Department of Environment and Natural Resources—Division of Water Resources Revised August 2013