Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCC204947_MODIFICATION Supporting Documents_20221115 (7)
N�I�ee V' ae s�-eei��eee��. I !� _ �►, vo �� x / SILTiFENCE �4� 1280 2 / 26/ / 2/�"7 // /��// 25 I 3 I 28� / T�Li / R f�FORCED/ / � / / / _ — — 2?8" / / / / / / � / �j�LT1223 522 / /// � L281GI27E 279/ 277 283 �2�85 o / F� 283 / 2GTV 2 � 127A 12/ — U — / \ I 3 8A / LO 18B P 127 —D �PE Q( �260 / _ 15„RC— s KD�1VE 24 28C 279 PI 7 N/F 163802-58-4066 JOHNJOHNSON DB 1902 PG 959 t \x \x \x \x k CONSTRUCTION SEQUENCE STAGE 1 1. SCHEDULE A PRE -CONSTRUCTION CONFERENCE WITH JOHNSTON COUNTY PUBLIC UTILITIES. 2. AFTER THE PRE -CONSTRUCTION MEETING IS HELD, THE CONTRACTOR CAN DELINEATE THE TREE LINE / DISTURBANCE LIMIT LINE AND INSTALL INITIAL EROSION CONTROL MEASURES ONLY. THIS INCLUDES, BUT IS NOT LIMITED TO, CONSTRUCTION ENTRANCE, SILT FENCE/TREE PROTECTION FENCE, AND EXISTING INLET PROTECTION. ONCE THE SILT FENCE IS SECURE, DRAIN THE EXISTING PONDS WITH PUMPS AND HIGH -FLOW SILT BAGS. ONCE PONDS HAVE BEEN DRAINED, INSTALL TEMPORARY STONE COFFER DAMS AND BYPASS SYSTEMS TO ENSURE DRY WORKAREAS. RECONSTRUCT AND EXCAVATE TRB-3 AND FILL IN THE PORTIONS OF THE OTHER EXISTING POND. ONCE THESE MODIFICATIONS TO THE EXISTING STRUCTURES ARE COMPLETE, EXCAVATE THE TEMPORARY RISER BASINS AND THE TEMPORARY SKIMMER BASINS AND ADD THE FAIRCLOTH SKIMMERS AND THE COIR BAFFLES. ONCE THESE BASINS ARE INSTALLED AND OPERATIONAL, CONSTRUCT THE TEMPORARY DIVERSION CHANNEUBERM. LIMIT CLEARING AND LAND DISTURBING ACTIVITY TO ONLY THE AREA NECESSARY TO INSTALL THE PERMITTED MEASURES. 3. CALL JOHNSTON COUNTY PUBLIC UTILITIES FOR AN ONSITE INSPECTION TO CONTINUE CONSTRUCTION. 4. UPON APPROVAL OF THE STORMWATER SITE INSPECTION, COMMENCE PERMITTED LAND DISTURBING ACTIVITY - CLEARING AND GRUBBING FOR STAGE 1. ALL EROSION CONTROL MEASURES SHALL BE INSPECTED AND MAINTAINED, IF NEEDED, AT LEAST ONCE PER WEEK AND AFTER EVERY RAINFALL EVENT. STAGE 2 1. BEGIN ROUGH GRADING OF SITE. 2. BEGIN ROAD WIDENING AND INSTALL THE ASSOCIATED SUBSURFACE DRAINAGE SYSTEM. 3. ONCE ROUGH GRADES ARE ESTABLISHED, INSTALL THE SUBSURFACE DRAINAGE AND OTHER INFRASTRUCTURE AS APPROPRIATE AND PROTECT ALL NEW INLETS WITH TEMPORARY BLOCK AND GRAVEL OR SILT BAG MEASURES AS SHOWN. 4. FILL AROUND SKIMMER BASINS AS STORM DRAINAGE BECOMES OPERATIONAL AND DIRECTS DRAINAGE INTO THE RISER BASINS. MAINTAIN CONTROLLED FLOW WITH THE 24" SLOPE DRAINS AS SHOWN. 5. STABILIZATION IS REQUIRED WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING OR INACTIVITY ON PROJECT SITE. 6. ONCE ALL SUBGRADES HAVE BEEN ESTABLISHED, INSTALL SANITARY SEWER SERVICES N/F AND THE PROPOSED WATER MAINS AND SERVICES. ONCE ALL UTILITIES HAVE BEEN 1 4 MORRIS HOLLIRRIS OLLIDAY INSTALLED, FINISH FINE GRADING OF SITE AND INSTALL CURB AND GUTTER AND PAVING. DB 4930 PG 57 7. STABILIZATION IS REQUIRED WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING OR INACTIVITY ON PROJECT SITE. 8 SITE STABILIZATION IS REQUIRED PRIOR TO FINAL APPROVAL OF GRADING PERMIT AND EXISTING �x ISSUANCE OF CERTIFICATE OF OCCUPANCY. GRASS UTILIZED AS PERMANENT GROUND \ POND COVER MUST BE AT A MOWABLE HEIGHT THAT GENERALLY PROVIDES AT LEAST 80% \ COVERAGE THROUGHOUT THE SITE, WITH NO LARGE BARE PATCHES OR EVIDENCE OF EROSION. ONCE THE SITE HAS BEEN STABILIZED AND INSPECTED, CONVERT THE 29 �� 8' ASPHALT GREENWAY TRAIL �x TEMPORARY RISER BASINS TO PERMANENT WET PONDS WITH THE APPROVAL OF THE INSPECTOR. \ 9. WHEN VEGETATION HAS BECOME ESTABLISHED, CALL FOR A FINAL SITE INSPECTION BY THE JOHNSTON COUNTY PUBLIC UTILITIES. OBTAIN A CERTIFICATE OF COMPLETION. GROUND STABILIZATION " 95 L5/2 2 I I / / — - / / r� — / / ' „� ^ Cl26 / \ \� I I S J \ 131 A / / ✓ / / / � / � / 278 279 / / / / / ' � _ 49 \ - \ 60 ,I I/ o / 26� // /� / �� / / �3/ // / �/ 19.7 / /� / vQ R°'° / s' 2 \ � \ � \ ,\ \ / I •/I I J/% �l=—_— —//.. I// l� / l� SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS Perimeter dikes, swales, ditches 7 days None and slopes High Quality Water (HOW) 7 days None Zones Slopes steeper 7 days If slopes are 10' or less in length and than 3:1 are not steeper than 2:1, 14 days allowed Slopes 3:1 or 14 days 7-days for slopes greater flatter than 50-feet in length All other areas None with slopes flatter 14 days (except for perimeters and than 4:1 HOW Zones) 2 / c "'Extensions of time may be a roved b the permittingauthoritybased on weather /285 or other site -specific conditionsthat make compliance impracticable." (Section II.B (2)(b) CI32 DOUBLE / �^ / / / / / / /1 $° i� ,, / / / / / CI4 B' / — \ \ \ \ \ 1 \/ J /� / \ f �� I l BASIN REMOVAL SEQUENCE I�5 2 / //// //�—\jii \ / / 1. SCHEDULE A SITE MEETING WITH THE ENVIRONMENTAL INSPECTOR TO DETERMINE IF A GI 32BY I I 2 4 / / / / 2 / / 00 / / / 2� /$6 / / � / / 183 \\`\ \ \/j� / \ \ \ \ BASIN CAN BE REMOVED. INSTALL SILT FENCING OR OTHER TEMPORARY EROSION CI 47A CONTROL MEASURES AS NEEDED PRIOR TO REMOVAL OF THE BASIN. 2. REMOVE BASIN(S) AND ASSOCIATED TEMPORARY DIVERSION DITCHES. IF CULVERT PIPES NEED TO BE EXTENDED, PERFORM THIS OPERATION AT THIS TIME. FINE GRADE AREA IN Cl7 /�� // / �/ =//// < \\ \\\\ \\ I \ / / / \ PREPARATION FOR SEEDING. / �3. PERFORM SEEDBED PREPARATION, SEED, MULCH AND ASPHALT TACK ANY RESULTING 2g4 / \ \\\\ \ \ \ BARE AREAS IMMEDIATELY. /283 m / / ` 1a R 2 / / 0 / �95 \ \ \ i j/ \\ \ \ \ \ 4. INSTALL VELOCITY DISSIPATORS AND/OR LEVEL SPREADERS AS REQUIRED ON THE 212 EROSION CONTROL PLAN. 5. WHEN SITE IS FULLY STABILIZED, CONTACT ENVIRONMENTAL INSPECTOR FOR APPROVAL I 28 R3.6\ 2g1 / \ OF REMOVING REMAINING TEMPORARY EROSION CONTROL MEASURES AND ADVICE ON I I I � I / RO 146B / / / / tip/ 3°0 \ \ 1 1 \ \ WHEN SITE CAN BE ISSUED A CERTIFICATE OF COMPLETION. 15 / / 2g6/ — / / 186 0 / / / / / — 6 ° 280 145 EROSION CONTROL NOTES rl / / / / — \ \ \\ \ \� \ ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS. 44 / / I I / 18� / / 301 30 h ^ \\\\\ S\ \ \ SUFFICIENT EROSION CONTROL PRACTICES MUST BE INSTALLED AND MAINTAINED TO I----V \\ \ \ \ RETAIN SEDIMENT WITHIN THE BOUNDARIES OF THE SITE. GROUND COVER STABILIZATION / 190 SHALL BE IN ACCORDANCE WITH NPDES PERMIT AND STABILIZATION CHART ABOVE. (1911 3p6 \ �` . • \\\ \ \ TEMDAYORARY GROUND COVER WILL BE INSTALLED ON ALL EXPOSED SLOPES IN 7 OR 14 07 / / / CI44B I �2 \ \ l I I❑ I I / 2a ° (2g1 I 11s — — /3°5 � / \ w \ • \ \ \ 19 MAINTENANCE: ALL EROSION AND SEDIMENT CONTROL PRACTICES TO BE INSPECTED — EXISTING \ WEEKLY AND AFTER EVERY RUNOFF PRODUCING RAINFALL EVENT. NEEDED REPAIRS WILL N ! 193 \ \ \ \ 2 h — ✓ — \ \ POND \ BE MADE IMMEDIATELY. /0 1 :1 SPE SLOPES ` \ \ I I I \ \ \ \ \ \ / 3°� — ls. Cp 5 4 ` — \ = _ \ \ \\ \\ \ MAXIMUM GRADED SLOPE SHALL NOT EXCEED THREE (3) TO ONE (1). 7 TOTAL DISTURBED SOIL AREA 1 45 ACRES. \ `E < \ \ ` — � ESQ � \ \ STOCKPILE NOTES: . I \✓ 1. HEIGHT SHALL NOT EXCEED 35 FEET. \ 2 2gp 282 \\ \ 1 2 \ \ \ \ \3 15 R P4 \ CO \ / \\ \ \ \ \ 2. SLOPES SHALL NOT EXCEED 2:1 \ \ \ \ r \ \ �R I STOCKPILE MAINTENANCE REQUIREMENTS 74 — �� \ \ I \ \ \ \ \ \ \ \\ \ \ \ �e ` I ✓2g\ \ 3°° \ \ / ` \ \ �o �ISTRUCTION / \\ \ \ os \ \ \ 1. SEEDING OR COVERING STOCKPILES WITH TARPS OR MULCH IS REQUIRED AND WILL REDUCE EROSION 10 76 \ � \ \ \ \ ° I / �9� \ \ ,�--, / _. — \ \ \ \ \ �o \ I 78 w ` E�TRANCE (TY _ \ \ \ \ \ \ \\ PROBLEMS. TARPS SHOULD BE KEYED IN AT THE TOP OF THE SLOPE TO KEEP WATER FROM RUNNING UNDERNEATH THE PLASTIC. ISER 5 \ \ \ \ \ \ 2. IF A STOCKPILE IS TO REMAIN FOR FUTURE USE AFTER THE PROJECT IS COMPLETE BUILDERS, ETC. THE \ \ I ` �/ \ / / o / \ \ \ \ \\ \ FINANCIAL RESPONSIBLE PARTY MUST BE NOTIFY WAKE COUNTY OF ANEW RESPONSIBLE PARTY. THAT / , / ) �s \ 285 \ \ 53 / 2g6 \ s i%� / / �` ` ` \\ \ \ \\ \ \ \ STOCKPILE. 4-- / \ \\ \ \ \ \ 80 \ �\ �� i \\ \ �\ 3. THE APPROVED PLAN SHALL PROVIDE FOR THE USE OF STAGED SEEDING AND MULCHING ON A CONTINUAL \ \ `� / \` / \ \\ — BASIS WHILE THE STOCKPILE IS IN USE. 2�- 42 278 280J 28 \ \ 24� R 29 � / � \ � � \ �� / — 142A \ \ I \ 81 / / \ 75 \ \ �� / \ — _ 305— _ _:_7 — / 305 =4. ESTABLISH AND MAINTAIN A VEGETATIVE BUFFER AT THE TOE OF THE SLOPE (WHERE PRACTICAL). PHASE 1 / \ \—�310_ �1—a„NM�e wnn�s w — — 2157A / / / eo I 4 RCP \\ \\ONSTRUCTION� / � — EROSION CONTROL LEGEND \ \ \ ' // / \\ (/ \ \ \ \ DITCH 55C 2 \ \ 83 \ // \ ` / A\V \ \ N * TEMPORARY SILT FENCE 36"RCP 30"RCP -- / \ \ \ \ \4 / / \\ \ \\\\\ \ \ // > \�=—j = — T3,_ 7NMFl.a GKs118FF \ o, V, O REINFORCED SILT FENCE OUTLET 71 \\\ \ \\\\\ \\\ \` — _ / M / / � ' �®c\� OG � ��� TEMPORARY SILT BAG / 279 2a1 / z / / �� © zg \ \ \\ 1 \ \\ \ \ — _ . . —�92 INLET PROTECTION /I / / / // 88 / /� �\ G� � — / TEMPORARY BLOCK &GRAVEL CI41 CI41A ro� / / / / \\\ \ \\ 69 \ \ \\\ \\�' / Xe� / �\ \\�\C \ — �tv� INLET PROTECTION 13 `/ \\`/ \ \ \ \\\\\ — — — — LIMIT OF DISTURBANCE T _228�5 EXISTING TREE LINEr <29� Cty31 -73 0 NEWTREELINE 29 DS274 qs 66 TS 3S% 3080 TEMPO 37S7D TEMPORARY ROCK CHECK DAM �d3-1 S— / /I `_— —/—//—/ E\X 1 1140IC Yu � I 5'Q �cI I • 14 I Ir I^\(I IIII III I.—_❑61— —�� \\(I\I oI II I _ �\II\IIIII I II II \\\I\I,I \� 64 �\\ ; \\\\` 6_5 / /\\\ \\\ \ \�i\ \�` /�i/15A / \\— a M\/5 R\cP ��\/ /\/ �,i / /\CI\//jP,FHLq%S /\(�\\\ /\ �/ ^ \\\ \\\�\ \\\\ \ I l/� FS CONCRETE WA13 SH AREA 275 If` 280 'o_2951,4 RIPRAP APRON IHE6/ ® VELOCITY DISSIPATOR vI I 6\\\ ICIA\ NORTH I 57 I I 58 _ ¢ J I I L m III �I ll�l 111 I 11 1 lil ,—� \J �a \� // ��\�' �\ \\\. T7ON \,\ ,�\�\ ,��� yp I�lllil 60' 0 60' 120' SCALE: 1 " = 60' ao w Q w z > w 0 LL C0 > Iw z O O z O CO z O LU w w —0 CE GROUP 301 GLENWOOD AVE. 220 RALEIGH,NC 27603 PHONE. 919-367-8790 FAX 919-322-0032 www.cegroupinc.com License # C-1739 ������Unuumtluu4ioii®e x �10f!d U ' x 3- • Q J Z O J �/ J � LL Qz zC) J 0 0 0-Z U� zQ O��,z0 VJ W O UJLU W0� 0 Z Fr = W U) z N U z wo 00 (_9� UC) Qcn VJ 0 Date: MARCri 3 1 , 2021 Scale: I"=Ga Drawn: RJ h Checked: AJF Project No. 1 27-239 Computer Dwg. Name 1 27-239 ph2-4 stage 2 ec Sheet No: 11 Of 41