HomeMy WebLinkAbout20190183 Ver 1_Loflin Dairy II Credit Release Request Task 7_20221116ID#* 20190183
Select Reviewer:
Katie Merritt
Initial Review Completed Date 11/16/2022
Mitigation Project Submittal - 11/16/2022
Version* 1
Is this a Prospectus, Technical Proposal or a New Site?*
Type of Mitigation Project:*
Stream Wetlands Buffer Nutrient Offset
(Select all that apply)
Project Contact Information
Contact Name:*
Andrea Eckardt
Project Information
ID#:* 20190183
Existing ID#
Project Type:
Project Name:
O Yes O No
Email Address:*
aeckardt@wildlandseng.com
Version:* 1
Existing Version
DMS • Mitigation Bank
Loflin Phase II Randleman Buffer Bank
County: Randolph
Document Information
Mitigation Document Type:*
Mitigation Bank Information
File Upload: Loflin Dairy II Credit Release Request Task 7.pdf 653.43KB
Please upload only one PDF of the complete file that needs to be submitted...
Signature
Print Name:* Andrea Eckardt
Signature: *
K-1�4
November 16, 2022
CREDIT RELEASE REQUEST FORM
To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator
From: Andrea Eckardt, aeckardt@wildlands eng.com, 704-560-2997
Through: Wildlands Holdings V, LLC
We formally request a credit release for the Loflin Dairy II Nutrient Offset and Buffer Mitigation
Bank for completion of Tasks #3 and 7 per the approved credit release schedule, which is included in
the Attachments with this request. The following documents have been submitted to DWR for Task
#7 and are pending review: Monitoring Report #3 and the Assignment of the Conservation Easement
to the Long-term Steward (UP2Save).
Credits requested for release are detailed below:
Credit Type % Release Credit Amount Notes/Comments
(include Units)
2
Buffer Restoration 15 52,666.95 ft
2
Buffer Preservation 15 1,852.65 ft
2
Buffer Enhancement15 512.85ft
Generated Nitrogen Nutrient
Offset
Delivered Nitrogen Nutrient
Offset (Jordan sites only)
Generated Phosphorus Nutrient
Offset
Delivered Phosphorus Nutrient
Offset (Jordan sites only)
Signature:
Attachments:
Approved Project Credit Table
Approved Credit Release Schedule
Recorded Assignment of Conservation Easement to Long-term
Steward
źƌķƌğƓķƭ9ƓŭźƓĻĻƩźƓŭͲLƓĭ͵ΛtΜВЊВ͵БЎЊ͵ВВБЏΘЌЊЋĻƭƷaźƌƌĬƩƚƚƉwƚğķͲ{ǒźƷĻЋЋЎΘwğƌĻźŭŷͲb/ЋАЏЉВ
0.0000.000
)
2
3,852.4461,263.2402,156.2208,637.9483,713.490
3,419.460
63,074.880
12,351.438
(ft
284,185.440
351,112.766366,883.664
Mitigation Credits
1.4486.5240.0880.0290.0500.0000.1980.0850.000 8.0600.0790.2848.422
Credited
Acreage (ac)
33%33%33%
100%100%100%100%100%100%
Credit
% of Full
1:12:1
10:1
Ratio
Credit
Total Riparian Buffer Credits
1.4486.5240.2680.0580.0990.0001.9830.8530.000
Eligible
Acreage**
Total Riparian Buffer Restoration Credits
Total Riparian Buffer Preservation Credits
Total Riparian Buffer Enhancement Credits
1.4486.5240.2680.0580.0990.0001.9830.9410.021
Total Acreage
Credit Type
Riparian BufferRiparian BufferRiparian Buffer
TOB-50'TOB-50'TOB-50'
50'-100'50'-100'50'-100'
101'-200'101'-200'101'-200'
Riparian Width
Loflin Dairy Phase II Mitigation Bank Parcel
Bob BranchBob Branch
Feature ID*
A1, Bob BranchA1, Bob Branch
A1, B1, Bob Branch
A1, B1, B3, Bob Branch
A1, B2, B3, Bob Branch
Restoration
Preservation
Enhancement
Table 1b. Buffer Project Areas and Assets
Loflin Dairy Phase II Mitigation Bank ParcelDWR Project No. 2019-0183 Monitoring Year 0 - 2020 Riparian Buffer Credit Generation Summary -Mitigation Type*Areas identified for mitigation
credits in the Loflin Dairy Phase II Mitigation Bank Parcel are adjacent to the DMS Loflin Dairy Phase I Mitigation Site, but do not overlap.**The area of preservation credit within
a buffer mitigation site shall comprise of no more than 25% of the total area of buffer mitigation per 15A NCAC 0295 (o)(5).
źƌķƌğƓķƭ9ƓŭźƓĻĻƩźƓŭͲLƓĭ͵ΛtΜВЊВ͵БЎЊ͵ВВБЏΘЌЊЋĻƭƷaźƌƌĬƩƚƚƉwƚğķͲ{ǒźƷĻЋЋЎΘwğƌĻźŭŷͲb/ЋАЏЉВ