Loading...
HomeMy WebLinkAbout20190183 Ver 1_Loflin Dairy II Credit Release Request Task 7_20221116ID#* 20190183 Select Reviewer: Katie Merritt Initial Review Completed Date 11/16/2022 Mitigation Project Submittal - 11/16/2022 Version* 1 Is this a Prospectus, Technical Proposal or a New Site?* Type of Mitigation Project:* Stream Wetlands Buffer Nutrient Offset (Select all that apply) Project Contact Information Contact Name:* Andrea Eckardt Project Information ID#:* 20190183 Existing ID# Project Type: Project Name: O Yes O No Email Address:* aeckardt@wildlandseng.com Version:* 1 Existing Version DMS • Mitigation Bank Loflin Phase II Randleman Buffer Bank County: Randolph Document Information Mitigation Document Type:* Mitigation Bank Information File Upload: Loflin Dairy II Credit Release Request Task 7.pdf 653.43KB Please upload only one PDF of the complete file that needs to be submitted... Signature Print Name:* Andrea Eckardt Signature: * K-1�4 November 16, 2022 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Andrea Eckardt, aeckardt@wildlands eng.com, 704-560-2997 Through: Wildlands Holdings V, LLC We formally request a credit release for the Loflin Dairy II Nutrient Offset and Buffer Mitigation Bank for completion of Tasks #3 and 7 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to DWR for Task #7 and are pending review: Monitoring Report #3 and the Assignment of the Conservation Easement to the Long-term Steward (UP2Save). Credits requested for release are detailed below: Credit Type % Release Credit Amount Notes/Comments (include Units) 2 Buffer Restoration 15 52,666.95 ft 2 Buffer Preservation 15 1,852.65 ft 2 Buffer Enhancement15 512.85ft Generated Nitrogen Nutrient Offset Delivered Nitrogen Nutrient Offset (Jordan sites only) Generated Phosphorus Nutrient Offset Delivered Phosphorus Nutrient Offset (Jordan sites only) Signature: Attachments: Approved Project Credit Table Approved Credit Release Schedule Recorded Assignment of Conservation Easement to Long-term Steward ‘źƌķƌğƓķƭ9ƓŭźƓĻĻƩźƓŭͲLƓĭ͵ΛtΜВЊВ͵БЎЊ͵ВВБЏΘЌЊЋ‘ĻƭƷaźƌƌĬƩƚƚƉwƚğķͲ{ǒźƷĻЋЋЎΘwğƌĻźŭŷͲb/ЋАЏЉВ 0.0000.000 ) 2 3,852.4461,263.2402,156.2208,637.9483,713.490 3,419.460 63,074.880 12,351.438 (ft 284,185.440 351,112.766366,883.664 Mitigation Credits 1.4486.5240.0880.0290.0500.0000.1980.0850.000 8.0600.0790.2848.422 Credited Acreage (ac) 33%33%33% 100%100%100%100%100%100% Credit % of Full 1:12:1 10:1 Ratio Credit Total Riparian Buffer Credits 1.4486.5240.2680.0580.0990.0001.9830.8530.000 Eligible Acreage** Total Riparian Buffer Restoration Credits Total Riparian Buffer Preservation Credits Total Riparian Buffer Enhancement Credits 1.4486.5240.2680.0580.0990.0001.9830.9410.021 Total Acreage Credit Type Riparian BufferRiparian BufferRiparian Buffer TOB-50'TOB-50'TOB-50' 50'-100'50'-100'50'-100' 101'-200'101'-200'101'-200' Riparian Width Loflin Dairy Phase II Mitigation Bank Parcel Bob BranchBob Branch Feature ID* A1, Bob BranchA1, Bob Branch A1, B1, Bob Branch A1, B1, B3, Bob Branch A1, B2, B3, Bob Branch Restoration Preservation Enhancement Table 1b. Buffer Project Areas and Assets Loflin Dairy Phase II Mitigation Bank ParcelDWR Project No. 2019-0183 Monitoring Year 0 - 2020 Riparian Buffer Credit Generation Summary -Mitigation Type*Areas identified for mitigation credits in the Loflin Dairy Phase II Mitigation Bank Parcel are adjacent to the DMS Loflin Dairy Phase I Mitigation Site, but do not overlap.**The area of preservation credit within a buffer mitigation site shall comprise of no more than 25% of the total area of buffer mitigation per 15A NCAC 0295 (o)(5). ‘źƌķƌğƓķƭ9ƓŭźƓĻĻƩźƓŭͲLƓĭ͵ΛtΜВЊВ͵БЎЊ͵ВВБЏΘЌЊЋ‘ĻƭƷaźƌƌĬƩƚƚƉwƚğķͲ{ǒźƷĻЋЋЎΘwğƌĻźŭŷͲb/ЋАЏЉВ