Loading...
HomeMy WebLinkAbout20091151 Ver 1_Certification of Completion_201411053198321308 BIRMINGHAM ELECTRIC Certificate of Completion DWQ .Project No. 0 ?— �V � County: PAGE 04 Applicant- Project Name: Date of Issuance of 4 1 ater t ual tyC Certification: one_ approx V27511 d 60e- 4�.1�JA� x ,024 Upon completion of all work approved %Min the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 /Wetlands Unit, Nora? Carolina Division of Water Quality, 1650 Mail Service Centcr, Ralcigh, NC, 27694.1550. This form may be returned to DWQ by the applicant, the applicant's authorized went, or the project engineer. It is not necessary to send certificates from all of't`hese Applicant's Certi flIC4 0n I, W, & 4, a C & r t'►')i 41M ,hereby state that to the best of my abilities, due care and diligence was used in the Aservation of the construction such that the construction was observed to built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials Signattire� �i1,C/l �—" bate Agent's Certification I. , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials Signature Date — - - - - -- — -- - - - -- X If this project ww designed by a Certified Professional ° z n r CD c I, as a du:y registered Professional m z c� M {i e Engineer, Landscape Architect, Sury.vor erc i in the State of North Carolina, hatiink been° en :authorized to observe {periodically, weekly, full time) the construction of the project, for the � c= Perinittee hereby st iti; that, to tlio best of my abilities due care and diligence ,_ war wed in t ie - - observation of the construction such that the constructior was observed to built within substa iai comphance and intent rf the 401 Water Qwilitti Certification and guffer Rules, the approved plans and spec:f cations, and other supporting materials Signature Registration ;%:o Date —L���