HomeMy WebLinkAbout20061245 Ver 5_CAMA Application_20141219Pat McCrory
Governor
December 18, 2014
MEMORANDUM
TO:
FROM.
SUBJECT•
Applicant:
NCDEE R
Carolina Department of Environment and Natural Resources
John E. Skvarla, III
Secretary
Karen Higgins, Compliance and Permitting Unit Supervisor
DWR - Water Quality Program
Daniel Govoni J � -^ !
Assistant Major Permits Coordinator - - --
Division of Coastal Management p 1 2014 10
CAMA/DREDGE & FILL Permit Application
Yeopim Partners, LLC
Project Location: Farms at Riversound off of Drummonds Point Road, Chowan County
Proposed Project: Major modification to CAMA Permit #126 -09 to reconfigure the marina
Please indicate below your agency's position or viewpoint on the proposed project and return this
form by 01/08/15 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252- 247 - 3330).
If you have any questions regarding the proposed project, please contact Lynn Mathis at (252)
264 -3901 When appropriate, in -depth comments with supporting data are requested
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
SIGNED DATE
1367 US 17 South, Elizabeth City, NC 27909
Phone 252 - 264 -3901 1 FAX 252-264-3723, Internet www nccoastalmanagement net
An Equal Opportunity 1 Affirmative Action Employer
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME- Yeopim Partners, LLC/ Farms at Riversound MA3oR /VfodiFr�a ro tt�
I'l;1G ^ a�
2. LOCATION OF PROJECT SITE. Site is located off of Drummonds Point Road (SR 1100), in
Chowan County, adjacent to the Yeopim River and Middleton Creek.
Photo Index- 2006 155 -6755, J -20& 21, L- 20 &21, M -20 &21 2000 155 -1804, K, L& M -20 &21 L 1995 155-
1603; L, M &N -17 &18 1989 1 14 -10, I, J & K -20 &21
State Plane Coordinates: X: 2743700 Y 861200
3. INVESTIGATION TYPE. CAMA
4. INVESTIGATIVE PROCEDURE. Dates of Site Visit 08/06/2013, 08/21/2013 and 12/15/2014
Was Applicant Present- No
5 PROCESSING PROCEDURE. Application Received Complete December 15, 2014
Office Elizabeth City
6, SITE DESCRIPTION:
(A) Local Land Use Plan- Chowan County
LUP Land Classification- Rural Conservation
(B) AEC(s) Involved. EW, ES and PTA
(C) Water Dependent- Yes
(D) Intended Use- Residential Subdivision and 130 Slip Marina with Access to the General Public
(E) Wastewater Treatment. Existing. None
Planned: Septic
(F) Type of Structures: Existing- None
Planned: Individual residences, modify a marina, a dock masters
office, bathroom facility, portable marina pump -out, and
a parking lot
(G) Estimated Annual Rate of Erosion. N/A
7 HABITAT DESCRIPTION [AREA]
DREDGED FILLED SHADED
(A) Vegetated Wetlands
Non - coastal
Reduction in Shading =
-120sf
(B)Non- Vegetated Wetlands
Reduction in the size of the
(Open water)
Piers and Platform =
• 2,251.75sf
(C)Other (High Ground)
(D) Total Area Disturbed: Within an AEC = - 2,251.75sf
(E) Primary Nursery Area- No
(F) Water Classification- SB Open. No
8. PROJECT SUMMARY. The applicant is requesting a Major Modification of CAMA Permit #126 -09 to
reconfigure an approved marina by reducing the size of the piers and platforms, converting the structure from
a stationary structure to a floating structure, adding "No Wake" buoys, and relocating the proposed structure
landward of the 75' AEC
a-
Yeopim Partners, LLC
Field Investigation Report
Page 2
Project Setting
Farms at Riversound, previously Riversound Subdivision Phase II is located off of Drummond's Point Road (SR
1100), adjacent to Yeopim River and Middleton Creek. Phase II of the tract is a 668.8 acre tract originally
approved for a 299 lot subdivision serviced by a package treatment plant The tract has approximately 3,600
linear feet of shoreline fronting on Middleton Creek and the Yeopim River. The development included a
stationary 130 slip docking facility, a Dock Masters Station with bathrooms, a portable pump -out w/ building,
and a 32 space parking lot. Development on the property has been limited to road construction to date
A majority of the property is wooded with the upland portions having been a managed pine plantation prior to
being purchased by the Waterfront Group, LLC (and subsequently Yeopim Partners, LLC). Pines and
hardwoods can be found in varying growth stages with typical undergrowth including, but not limited to, cat
brier (Smilax rotundifolia), poison ivy (Toxicodendron radicans) and caroling jasmine (Gelsemium
sempervirens). A section of the marina lot adjacent to the water was delineated as 404 wetlands by Tracy
Wheeler with the US Army Corps of Engineers and is classified as a bottomland hardwood swamp.
Average elevation of the marina property is approximately 4' above normal water level along the high ground
portion of the property and 1' above sea level within the wetland area The flood designation for most of the
property is AE, and the entire tract is located within the 100 year floodplain Soils on the marina site are as
Wahee fine sandy loam, nearly level and somewhat poorly drained, that has a loamy surface and a loamy or
clayey subsoil, and Dogue fine sandy loam, nearly level to gently sloping, that is moderately well drained
The shoreline gently slopes to the water along the wetlands. Water depths on the Yeopim River within the
project area are -1.3' to -6' at an average distance of 380' waterward of NWL. No submerged aquatic
vegetation found within the project area.
The property is located along Estuarine Waters of the Yeopim River and has a 75' landward Area of
Environmental Concern. The nearest major water body to the proposed marina is the Albemarle Sound, which
is 4 miles by water. There is one marina operating in the area, approximately 4 2 miles from the Yeopim
Partners marina site, on Yeopim Creek at Albemarle Plantation Albemarle Plantation's marina is a 158 slip
docking facility exclusively for the residents of the Plantation Fuel and pump -out facilities are available to the
public for a fee
Land uses bordering the subject property are residential To the east is a development residential lot and to the
west, across Middleton Creek is Phase I of Riversound, which is currently undeveloped due to the failure of the
developer to complete the waste treatment plant designed to service the subdivision
Development Proposal
The original permit authorized the development of Riversound Phase ll, a 299 lot subdivision, with a 130 slip
marina with three 8' wide piers and three "T" platforms, a Dock Masters Station with bathrooms, portable pump -
out, and a parking lot. Use of the proposed marina was for the property owners in Phase I and Phase II of
Riversound The current owner(s) Yeopim Partners, LLC, have subdivided and platted the property in Phase
II, reducing the number of lots down to 56 and renamed Phase 11 from Riversound to Farms at Riversound.
Yeopim Partners, LLC
Field Investigation Report
Page 3
The permittee would like the following changes to the marina: 1) reduce the width of the piers and platforms
from 8' to 6 25', 2) make the docking facility a floating structure not stationary, 3) install two "No Wake" buoys,
4) reconfigure the parking lot, 5) reduce the width of the elevated access over 404 wetlands, and, 6) change
the receiving facility for the marina waste from a package treatment plant to a septic system.
High Ground Development Landward of the 30' Buffer:
Proposed land disturbance on the marina site 41,538sf
Existing impervious surface landward of the 75' AEC = 537,280sf
Proposed impervious surface landward of the 75' AEC = 23,476sf
Improvements will include electric service for 59 residential lots and the marina
Dock Masters Station with bathrooms and a portable pump -out for the marina
Septic area
Parking for 34 vehicles per site plan (referenced as 17 in the application)
(1) Bioretention pond (on site of the property listed as marina)
High Ground Development within the 75' AEC:
Walkway 43' (Ave.) x 8' = 344sf
Small section of gangway 8'x 4' (ave.) = 32sf
Total High Ground Shading 376sf
404 Wetland Shading within the 30' Buffer (Based on drawing provided).
Elevated gangway 4'x 23.75' (ave) = 95sf
Pier transition from gangway 4'x 6.25' = 25sf
Total Wetland Impacts 120sf
Approved Shading- 240sf — Requested Modification: 120sf = Reduction in Shading -120sf
(Resulting in a 50% reduction in shading)
Open Water. Outside Piers 2(396'x 6.25') =
4,950sf
Interior Pier 397' x 6 25' =
2,481sf
Finger Piers 62 x 60sf =
3,720sf
(3) T- Head platforms
3(61,16'x 6.25') =
1,145sf
Total Shading Proposed
12,296sf
Approved Shading. 14,548sf — Requested Modification: 12,296sf = Reduction in Shading - 2,252sf
(Resulting in a 15.5% reduction in shading)
There will be 68 free standing tie piles in association with the previously approved 130 slip marina. According
to the application the marina has been designed to handle boats up to 30' in length. "No Wake" buoys are
proposed approximately 200' from the northwest and southeast corners of the marina. A portable pump -out
facility is proposed; however, the prior request included pumping the effluent to a waste treatment system. The
current request will involve pumping the effluent into an on -site septic system, subject to approval
As currently proposed, the marina will be open to the general public. The prior request (and approval) was for
a private residential marina for property owners in Riversound Subdivision The docking facility and pump -out
will be available to nonresident boaters,
Yeopim Partners, LLC
Field Investigation Report
Page 3
Anticipated Impacts From the Requested Modification
1) The modification will result in a 15.5% reduction in open water shading or 2,252sf
2) The reduced gangway from an 8' wide walkway to a 4' wide gangway will result in a 50% reduction
in wetland shading or 120sf.
3) Area devoted to the marina in Public Trust Waters and Estuarine Waters will be reduced by
approximately 10 3% or 12,626sf,
Submitted by:_Lynn W. Mathis
Date: December 15, 2014
Major Modification Request for CAMA Permit #126-09
Riversound Subdivision — Farms at Riversound
Narrative and Calculations:
The proposed modifications include the reconfiguration of the next phase of the
Riversound subdivision from 299 to 56 and redesign of the parking area This
represents an approximately 75% reduction in the number of homes Of the 56
lots, 10 will be waterfront, representing a 50% reduction relative to the previously
permitted site plans, calling for more than 20 such lots.
In connection with these reductions, Yeopim Partners are making very minor
changes to the prior, permitted site plans. Enclosed are copies of the revised
drawings, depicting these minor modifications, which essentially consist of going
to a floating dock system, with T -heads being reduced from 80 feet to slightly
over 61 feet; reducing dock widths to 6'3 ", and as a result of the floating dock
system eliminating approximately 275 support pilings
The reductions will reduce the total square feet of structures in the Public Trust
Waters by 15% (2,240 sf) as well as reducing the overall footprint of the marina
in the Public Trust Waters by 10% (12,626 sf).
The wastewater facilities at the marina and Farms at Riversound lots will no
longer connect to the treatment facility located in Phase I of the Riversound
Subdivision and have been changed to individual conventional septic systems
As a result of this change the marina will use a portable pumpout system that will
be disposed of at the marinas bathroom facility.
Details for open water disturbances and impacts:
Proposed structures within the Public Trust Maters
Pier (6'3" x 396', 396', 397') 7,431 25 s f
T -Heads 3(6'3" x 61'2") 1,145 s f
Finger Piers 62(60 sf) 3,720 s f
Total s.f. of structures proposed within Public Trust Waters .......... 12,296.25 s.f.
Structures currently permitted within Public Trust Waters .................14,548 s.f.
Total reduction .........2,240 s.f. (15 %)
Proposed marina area in Public Trust Waters .......... ........................109,590 s.f.
Currently permitted area in Public Trust Waters ....... ........................122,216 s.f.
Total reduction ..........12,626 s.f. (10 %) ��
Proposed construction /disturbance within the 30' DCM Buffer:
Elevated gangway (4'x 35') ........................ ............................140 s.f.
Proposed construction /disturbance within the 75' AEC:
Wooden walkway (8' x 43') ........................ ............................344 s.f.
WETLAND IMPACTS.
No Impacts proposed within coastal wetlands (no coastal wetlands within or adjacent to
project site)
Shading Impacts include elevated gangway (elevated min 3 feet). 120 s f.
PROPOSED LAND DISTURBANCE:
Proposed construction /disturbance on highground:
Roadway & Parking Area for boating facility - 12,652 s f
Total land disturbance . ............................... .........................41,538 s.f.
Existing impervious surfaces for project ...... ........................537,280 s.f.
Proposed impervious surfaces for project .... .........................23,476 s.f.
I
BOB fr -1
11818F 11evelsomeml Permit
I a ✓-,
(last revised 12127106) -.— - -- - -- -- --- ___... -__
North Carolina DIVISION OF-C-OASTA -L- MANAGEMENT
1. Primary Applicant/ Landowner Information
Business Name
Yeopim Partners, Llc
Project Name (if applicable)
Farms at Riversound
Applicant 1 First Name
Joseph
MI
B
Last Name
Stevens
Agent/ Contractor 1 First Name
Applicant 2 First Name
MI
Last Name
A
If additional applicants, please attach an additional page(s) with names listed
Agent/ Contractor 2 First Name
Mailing Address
19421 -A Liverpool Parkway
PO Box
City
Cornelius
State
NC
ZIP
28031
Country
USA
Phone No
704 -248 -9080 ext
FAX No
704 - 248 - 9081
Street Address (if different from above)
City
State
ZIP
ZIP
Email
N/A
Phone No 2
2. AgentfContractor Information
Business Name
Atlantic Environmental Consultants, Llc
Agent/ Contractor 1 First Name
MI
Last Name
Doug
A
Dorman
Agent/ Contractor 2 First Name
Ml
Last Name
Mailing Address
PO Box
City
State
P O Box 3266
Kitty Hawk
NC
ZIP
Phone No 1
Phone No 2
27949
252 - 261 - 7707 ext
252 - 599 - 2603 ext
FAX No
Contractor #
252 261 2965
Street Address (if different from above)
City
State
ZIP
Email
dougdorman @embargmail corn
<Form continues on back>
NIP, 1 1�C o'k *:s ,3?,',^ ;`Y..
Form DCM MP -1 (Page 2 of 4)
a
APPLICATION for
Mayor Development Permit
3. Project Location
County (can be multiple)
Street Address _
State Rd #
Chowan
427 Drummond's Piont Road
1100
Subdivision Name
City
State
Zip
Riversound - Farms at Riversound
Edenton
INC
27936-
Phone No
Lot No (s) (if many, attach additional page with list)
704 - 248 - 9080 ext
1 -56, 1 , ,
a In which NC river basin is the project located?
b Name of body of water nearest to proposed project
Yeopim River
c Is the water body identified in (b) above, natural or manmade?
d Name the closest major water body to the proposed project site
®Natural ❑Manmade ❑Unknown
Yeopim River
e is proposed work within city limits or planning jurisdiction?
f If applicable, list the planning jurisdiction or city limit the proposed
®Yes ❑No
work falls within
Chowan County
4. Site ®escHpti6n
a Total length of shoreline on the tract (ft )
b Size of entire tract (sq ft )
30 linear feet } �e,-O LF IQ 0,; _11$
29,136,214
c Size of individual lot(s)
d Approximate elevation of tract above NHW (normal high water) or
See PLAt, I
NWL (normal water level)
(If many lot sizes, please attach additional page with a list)
6' ❑NHW or ®NWL
e Vegetation on tract
Loblolly Pine, Tulip Poplar, Red Maple, Bald Cypress, Giant Cane
f Man -made features and uses now on tract
Asphalt and gravel roads
g Identify and describe the existing land uses adjacent to the proposed project site
Sinlge family residential and Agricultural
h How does local government zone the tract?
i Is the proposed project consistent with the applicable zoning?
Residential
(Attach zoning compliance certificate, if applicable)
®Yes ❑No ❑NA
I is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No
k Hasa professional archaeological assessment been done for the tract? If yes, attach a copy ®Yes ❑No ❑NA
If yes, by whom? Environmental Services, Inc
I Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA
National Register listed or eligible property?
<Form continues on next page>
^n3 ..�2Z> 3 'fib 36- -.C1Z 0 3 T
Form 6C"M MP -1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m (i) Are there wetlands on the site? ®Yes ❑No
(i) Are there coastal wetlands on the site? ❑Yes ®No
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? ®Yes ❑No
(Attach documentation, if available)
n Describe existing wastewater treatment facilities
Farms at Riversound lots will use conventional wastewater systems
o Describe existing drinking water supply source
Public water supply and Individual wells
p Describe existing storm water management or treatment systems
Road side swales adjacent to roads and detention ponds for parking areas
5. Activities and impacts
a
Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Government
®Private /Community
b
Give a brief description of purpose, use, and daily operations of the project when complete
130 slip marina and restroom facility located within the Riversound subdivsion in the phase known as the Farms at
Riversound 31'parking space will be provided parking for access to the boat slips The RiverSound Marina to be a private
marina and offer no transient slippage, no repair services, no haulout facilities, no sales of fuel or any goods or services, and
will permit no commercial enterprise to be operated out of the marina
c
Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored
Piers and boat slips will be constructed using a barge and hydraulic pump to jet pilings and hand tools will be used to
construct walkways The Equipment to be stored onsite during construction
d
List all development activities you propose
Construction of a 130 slip marina, parking area and bathrooms
e
Are the proposed activities maintenance of an existing project, new work, or both? New
f
What is the approximate total disturbed land area resulting from the proposed project? 41,538 ®Sq Ft or ❑Acres
g
Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA
that the public has established use of?
h
Describe location and type of existing and proposed discharges to waters of the state
None existing or proposed
i
Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No ❑NA
If yes, will this discharged water be of the same salinity as the receiving water? [-]Yes ❑No ®NA
I
Is there any mitigation proposed? []Yes ®No ❑NA
If yes, attach a mitigation proposal
<Form continues on back>
x,- .- . ^ uL ; T�r'af?C � 8 `- -- P�3 -L' j �a s
Form DCM MP -1 (Page 4 of 4)
APPLICATION fpr
Major Development Permit
S. Additional Information
In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application
package to be complete Items (a) — (t) are always applicable to any major development application Please consult the application
instruction booklet on how to property prepare the required items below
a A project narrative
b An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale Please give the present status of the
proposed project is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed
c A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site
d A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties
e The appropriate application fee Check or money order made payable to DENR
f A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mad Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management
Name Leslie & Patricia Kersey Phone No ,
Address 3065 Conners Drive, Edenton, NC 27932
Name Forest & Lauren Thomson Phone No
Address 8454 Vertical Ridge Road, King George, VA 22485
Name Phone•No
Address
g A list of previous state or federal permits issued for work on the project tract Include permit numbers, permittee, and issuing dates
LAMA Major Permit #167-06,10/11/06 DWQ EXP # 2006 -1245, 9/28/06
DWQ Stormwater #SW7060729, 9/12/06
USACOE General Permit # SAW- 2006 - 32436 -121, 9/11/06 S &E permit, CHOWA- 20007 -002, 8/1/06
h Signed consultant or agent authorization form, if applicable
i Wetland delineation, if necessary
I A signed AEC hazard notice for projects in oceanfront and inlet areas (Must be signed by property owner)
k A statement of compliance with the N C Environmental Policy Act (N C G S 113A 1 -10), if necessary If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act
7. Certification and "Permission to Enter on Land , = - - . . '
I understand that any permit issued in response tathis application will allow only the development described in the application
The project will be subject to the conditions and restrictions contained in the permit
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up
monitoring of the project
I further certify that the information provided in this application is truthful to the best of myyknowledge
Date _12/4/14 Print Name _Doug Dorman, Agent
Signature
Please indicate application attachments pertaining to your proposed project ;
❑DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts
®DCM MP -3 Upland Development
®DCM MP -4 Structures Information --
2 'a-3 x7`i- 2-30a 3- 368 -r- RZ;%n S' w-'i'it L'3 „t4 -d'.'i a— '-4S J1-11a 0Z rs, e'n- ". "aeI
Form J `0 t MP-4
3 R f f- U Vii-. E x - >;.a
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1 Be sure to complete all other sections of the Joint
Application that relate to this proposed project Please include all supplemental information
9. DOCKING FACILITYIMARINA CHARACTERISTICS El This section not applicable
a (i) Is the docking facility /marina b (i) Will the facility be open to the general public?
❑Commercial ❑Public/Government ®Private /Community ®Yes ❑No
c (i) Dock(s) and /or pier(s)
(n) Number
3
(in) Length
396', 396', 397'
(iv) Width
63"
(v) Floating
®Yes ❑No
e (i) Are Platforms included? ®Yes []No
If yes
(u) Number 3
(m) Length 612"
(iv) Width 6'3"
(v) Floating ®Yes ❑No
Note Roofed areas are calculated from dnphne dimensions
g (i) Number of slips proposed
130
(n) Number of s(ps existing
0
i Check the proposed type of siting
❑ Land cut and access channel
❑Open water, dredging for basin and /or channel
®Open water, no dredging required
❑Other, please describe
k Typical boat length 18' -30'
m (i) Will the facility have tie pilings?
®Yes ❑No
(n) If yes number of tie pilings?
120
d (i) Are Finger Piers included? ®Yes ❑No
If yes
(n) Number _gr
(m) Length 18'1"
(iv) Width 4'3" max (60 sf each)
(v) Floating ®Yes ❑No
f (i) Are Boatlifts included? ❑Yes ®No
If yes
(n) Number
(m) Length
(iv) Width
h Check all the types of services to be provided
❑ Full service, including travel Id and /or rail, repair or
maintenance service
❑ Dockage, fuel, and marine supplies
® Dockage ( "wet slips ') only, number of slips 130
❑ Dry storage, number of boats
❑ Boat ramp(s), number of boat ramps
❑ Other, please describe
1 Describe the typical boats to be served (e g , open runabout,
charter boats, sad boats, mixed types)
Mixed type
I (i) Will the facility be open to the general public?
®Yes []No
2. DOCKING FACILITYIMARINA OPERATIONS ❑This section not applicable
a Check each of the following sanitary facilities that will be included in the proposed project
❑ Office Toilets
® Toilets for patrons, Number 2, Location Adjacant to marina and parking area
❑ Showers
® Boatholding tank pumpout, Give type and location Portable pumpout unit stored at restroom budding
b Describe treatment type and disposal location for all sanitary wastewater
Portable pumpout unit will dispose of wastewater at restroom facility Conventional septic sytem located adjacant to restroom
facility
c Describe the disposal of solid waste, fish offal and trash
Disposal of waste to be disposed of in trash cans or dumpster located onsite -
I
d How will overboard discharge of sewage from boats be controlled? Y
There will be no sewage discharge allowed onsite
e (i) Give the location and number of "No Sewage Discharge" signs proposed
One sign to be located at the entrance to the boating faclity,
(n) Give the location and number of " Pumpout Available" signs proposed
Pump out signs to be placed at marina entrance indicating that a portable pumpout unit is available for slip owners
f Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products
No maintenance to be done onsite
g Where will residue from vessel maintenance be disposed of?
No vessel maintanance allowed onsite
h Give the number of channel markers and "No Wake" signs proposed Two no wake signs entering the marina at the east and west
i Give the location of fuel - handling facilities, and describe the safety measures planned to protect area water quality
No fuel facilities located onsite
What will be the marina policy on overnight and live- aboard dockage?
No live- aboard dockage aviable onsite
k Describe design measures that promote boat basin flushing?
There is no boat bassn associated with the boating facldty The pier and slips are located in the open waters of the Yeopim
River
I If this project is an expansion of an existing marina, what types of services are currently provided?
No existing marina onsite
J..I S&A- IRCZ)A.S7 vV1, vvv.'^ s: M: i�Ska: 3` .'.r�dY�iyi'c_`__'3?a3_ }."d�c'� revisal; 21l2i X03
m Is the marina/docking facility proposed within a primary or secondary nursery area?
❑Yes ®No
n is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
❑Yes ®No
o Is the marina /docking facility proposed within or adjacent to coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected
❑CW ❑SAV ❑SB
OWL 140 sf gangway shading ❑None
p Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? E]Yes ®No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease
3. BOATHOUSE (including covered Efts) ®This section not applicable
a (i) Is the boathouse structure(s)
❑Commercial ❑Public/Government ❑Private /Community
(u) Number
(w) Length
(iv) Width
Note Roofed areas are calculated from dnplme dimensions
4. GROIN (e g, wood, sheetpile, etc If a rock groin, use MP -2, Excavation and Fill) ® This section not applicable
a (i) Number
(u) Length
(in) Width
5. BREAKWATER (e g, wood, sheetpile, etc) ®This section not applcable
a Length b Average distance from NHW, NWL, or wetlands
c Maximum distance beyond NHW, NWL or wetlands
6, MOORING PILINGS and BUOYS
a Is the structure(s)
❑Commercial ❑Public/Government ❑Private /Community
c Distance to be placed beyond shoreline
Note This should be measured from marsh edge, if present
e Arc of the swing
7. GENERAL
®This section not applicable
b Number
d Description of buoy (color, inscription, size, anchor, etc )
R"'_-i.Y._--- =s'l bt- -Ii-- an_ -') ?""arA-'Ir,_� a .r �. mfr'' ..,�r<, s.,
a Proximity of structure(s) to adjacent riparian property lines
2,560' to the west (Kersey), 1,800' to the east (Thompson)
Note For buoy or mooring piling, use arc of swing including length
of vessel
c Width of water body
1.940'
e (i) Will navigational aids be required as a result of the project?
®Yes []No ❑NA
(n) If yes, explain what type and how they will be implemented
Reflectors at the end of each pier and dock lighting Light
sensors will be used for all lights
a ..
b Proximity of structure(s) to adjacent docking facilities
2,760 to the west (Kersey) 5,210 to the east (Dykes) in
Riversound Phase I
d Water depth at waterward end of structure at NLW or NWL
6 0'
8. OTHER ®This section not appbcable
a Give complete description
12/4/14
Date
Riversound
Project Name
Yeopim Partners, LLC
Applicant Name)
Applicant Signature
4rj
s L I 1 !
�. ;i.?- ,.�_'iu'�a5$9 ✓y: `�- fS�r'��4yc�iir ;.?�� '.L "_y�r_, >_prve -_ �rCL_ �li> �t.tn_?aA.;F «:Y:afl'rit.ri'_:_` +_ 5t;.3�`:.F:�'s. ..., .L�?irY,
�N, U
AMP
IV IMF —cm
MCI
Upo--l'
Jill
M
0 ;d
Cowl
_10
Nil
10MIKIRIGH D Ann
NEW—
. . . . . . . . . . . .
ra -mg-W&F
•_ N
W
1
R
m
r-
.I
9�
1
E�
a �
1
0
O
Z
O
1
a
^R
1
z
gin
\ rZ
P a ° o All 1 ;1 iQ
A C9
re3 ri
o n m
v
3?
i
y
F
0
D
x z
FlNOER
J0
MODEL
D
r
°•
3
�
P
€ �
"�. cat a � ?$c <
3
i
m
m
g P
P P
°
Y
g
gs
a D C.
.
°°
u
; -s
Y
§
8
m q
N
gin
\ rZ
P a ° o All 1 ;1 iQ
A C9
re3 ri
o n m
v
3?
i
y
F
i
4
Q m 1 0
m QF
e o a
Lt. C <i i 12
€ E E
Elo 1300A fin
44
� x
a - 3
j4
m a g 3
J K ` W ® 3
Q
V) ^ k
>
V)
Z tle
Q
O �t
~ U
Q �
m 8.
N i
..t
U .- iry.frf ty�:s
a
e"zri
l �^
7N 93�
o
ZLLLJ
N
Z`
S w
0 1 Ls ' g
� W N
0 3 z
1 v_g =
E E C aw
a m v o
_ co
•r;
u
u_
1
d
3 E E z S 8 S o
E o
tom r..
El �FE yE� E E
ui 3 O M Z- L
- 330DY4 s 7 v L
xvmo VD E c
3
° � 8
v m
s
�n
90
3 �
c
3
z s�
> nu;
w
6
3
W:
>i
Z
Td
0
2 M
Z E�
�8
3#
Z E
a°
w�
uJi
li
0
2 M
Z E�
�8
3#
Z E
a°
w�
uJi
- __-
r
.
�.
-
�
�
. .
. '
`
'
`
OZ
Z
Of
cn
on
oz
LLI
LLJ
ui
MAGNETIC
i � t
�a
D
mO
Z C� m
O
F Z
i-- m
z
m sn
A O
r�
O
A m
--i
Z <
G7 ?�
ICJ
OZ
O>
X
D
o°
m
0 o
t
1 m
w v
,.-
Coo
°�
!
! v
Z
W Gi
A
r
J�
c0
0s
�f
Z
O
0
Om
rr�
Ln
to
0
I !
;b 1- i
40�
cn
-0
CO
-U
V)
-V
1
i
`
K
1
i
n
o
n
0
c>
y
vji
0
U)
1
�
r
`0.I' C
V O
z
i
�
V v
=�
1
\
O
\
Ul
�
♦
i
b
m ;U
i p
W
1
i
i
s
�
P
\
f
i
i
\
s 1
\
� � s
t i s
m
i
ap
m
C7
t
�0 0 i
0 m
�l
t i
O
Z
t
t
Qc
OD
o
Ln
y
`
x
m
M
t
o
0
t
z
n
� <
_
m
cu
a
O
>
1
_
>
oz �O
t X c, O
0
z
t moo
�-
o
v
o
c�
-� 0
, m�
a
m
D
1 m00
!41
p
0
11=
oo�
—i O
CO
z
y
FTI
M
��z
0O
l c
O
O
z
>D
O
/
co
°v
D
MAGNETIC
i � t
�a
D
mO
Z C� m
O
F Z
i-- m
z
m sn
A O
r�
O
A m
--i
Z <
G7 ?�
ICJ
OZ
O>
X
D
o°
m
0 o
t
1 m
w v
,.-
Coo
°�
!
! v
Z
W Gi
A
r
J�
c0
0s
�f
Z
O
0
Om
rr�
Ln
to
0
I !
;b 1- i
40�
cn
-0
CO
-U
V)
-V
K
\ ,�
a OD
n
o
n
0
c>
y
vji
0
U)
ci
<
W
r
`0.I' C
V O
z
i
z
V v
=�
O
Q
MAGNETIC
i � t
�a
D
mO
Z C� m
O
F Z
i-- m
z
m sn
A O
r�
O
A m
--i
Z <
G7 ?�
ICJ
OZ
O>
X
D
o°
m
0 o
t
1 m
w v
,.-
Coo
°�
!
! v
Z
W Gi
A
r
J�
c0
0s
�f
Z
O
0
Om
rr�
a onoa -,ke Nmvaa 9LO-90 :31I3 60/2Z/Z '80/91/6 -G3SVQH
-v Vz V t L
7 7 g000 L ss
71 7V W,7
Y/V -7AY�lrj4Wf fAl2
go/,VL/z -;ivcl
, I
# Nlc
9WI MIS T Od
66 3-9Vd 610 ga
IV 13 ',A3S83)f I A31S31
JIN
S-11VAG )VN18VVq SMOHS V Z S133HS
-=N
v do T IHHHS
S1
dVN AJINIJIA
�1 f
r� � ���4"` �4