Loading...
HomeMy WebLinkAbout20141300 Ver 1_Shoreline Stabilization Application_201412182 0 1 4 1 3 0 0 State of North Carolina Department of Environment and Natural Resources DWR Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization Division of Water Resources FORM: SSGP 10 -2013 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 -1617 I. Applicant Information [15A NCAC 02H .0502(x)] DL9C@I�vlr 1. Owner Information 1 DEC: 1 �� 2014 _; Name: RITCHIE SOOS Mailing Address: 4218 Patriots Way - ? J. 8_ g��R i�ERH?7af�iG Gastonia NC 28056 Telephone Number: 704 - 277 -5658 Fax Number: 704 - 816 -5469 E -mail Address: ritchie soos @premierinc.com 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http: / /www.saw.usace.arM_y. Portals 5.9 /docs/ regulatory /regdocs/Permits /SAMPLE AGENT AUT ORIZATION FORM.pdf) must be attached if the Agent has signed this application form. Name: Robin Lemons, Owner/ General Contractor Company Affiliation: Summit Construction, LLC Mailing Address: P.O. Box 353 Albemarle, NC 28002 Telephone Number: 910 - 220 -2806 Fax Number: 910 - 439 -4765 E -mail Address: summitconstructionllc @gmail.com Person to receive the Certification Approval: Robin Lemons II. Project Information [15A NCAC 02H .0502(aL &Ab.] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10 -2013 Page 1 of 3 etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Montgomery Nearest Town: Mt. Gilead Subdivision name or site address (include phase /lot number): Swift Island Plantation, Lot #33 314 Plantation Way Directions to site - please include road names and numbers, landmarks, etc.: Hwy 24/27 to Hwy 73. Turn onto Lilly's Bridge Rd. Turn right onto Plantation Way. Construction entrance gate code is #4488. Latitude (in decimal degrees) 35.277908 Longitude (decimal degrees) - 80.083776 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Residential 6. Property size (acres): 0.82 acre / home site size 7. Lake/ river/ ocean adjacent to property: Lake Tillery 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Dredging of navigable waters, construction of pile - suonorted pier. Shoreline stabilization with natural boulders. 9. Will work be conducted from land? X❑ From water? ❑ 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: 1.650 so. ft. 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: 1,800 sq. ft. 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): Approximately ten (10) /Z ps-// V Owner /Agent's Signature* [15A NCAC 02H .0502(f)] Date ;Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 10 -2013 Page 2 of 3 IlP- Full Pond/ Normal Water Level i i i ■ Shoreline l 5'x�ao La ke (At Full Pond /Normal Water Level) Ace,- Z�ZXS`v a,C P O.J 2;'/00 i 3 Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft) *: 1. All proposed vegetation clearing ?. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. S. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10 -2013 Page 3 of 3 DESCRIMON # s�E r9TT�'GN� Sv,�vE✓ �9/h°S %D� LoT33_1�iy0 �NIFT.ZS[.g!Y® 1NL c.�JQ�i1J� A-l�nc�tTiy,/i/ L/1!/E� O VNs /0✓y T 4E Mm(r66 ` Z1' X 5) Z ` _.9NlcvA/i 0F IR Ga /V gT / JL To AE ,P *jv / ©'1 Cv81C 'As A,CS1466 f /yni-s / Llt�� i!I�ALK�41A% 130d7/fdd-iC- x y ` 13 4,7/!yds //J�K �' zi Tn T,4 t SQ. iN,9 4 �f 4t,roNr W /Ar1l — A�e�c FY6"49 t4%« /3 A/W aN7;� tg ILL �C /f_9V Ti'f L� WILL /� A1D 0/3 7t1X16A/Y4C 44 71 sal- 6;61417} " av& tNOLLlA A Al WI MIN 3 V1/EF S 6F flP 1! /Y& s INIA LR 57 a11/Li ` iffy Ae,,5 Igo //IS 7 /ES (1 1r7i}r�y_T © it-ceTF�¢ AeOAN 8 lWtIZ /TIES bte13o1+g"AL 1411d T// iiyZZ) eoVe 4 y& i Page 10 Personal Account Information Redacted N.0 OED NON1N \ s \ n act it _, » F ol R o W2 s g o � �:�p9�om�aHq:�N�°58988Y R 88 O eui 4 SO $ H. r.+u �Oj \\i' ^ \\ NCO° ,6 M N mEnnn // �' �• Sd/ � nnn EEnnn c nm� mSyyCB S' "'ya �k "S- � kCL'S' YYK SG6'!SSw'ik� "!�$S�� °8N o o \ o �rl" �Yiub"NIm'� 'Y .. [i+�inlriN 0 \ 4 4, G\\ D> \ \� \� n Laz_ ;� �\ o \\ 8S °LkSw - �:�p9�om�aHq:�N�°58988Y S2q O eui }i ��u��o$YtltlN�agY7esy� SO FEm mEnnn FnE nnn EEnnn nm� mSyyCB S' "'ya �k "S- � kCL'S' YYK SG6'!SSw'ik� "!�$S�� °8N �rl" �Yiub"NIm'� 'Y .. [i+�inlriN Nl^ "u�Q •Ot 8S °LkSw - - o'o_o'gog?NN NNNNFI SBSSSS$$ S$88SSS$g 8„ LY.- �NmNY »'= 'IS'n °°I,"iN �°uYaYNL A \ µ / �S�w�CE�E�5m55v.E �oem�mLC_»oss�sc. .°. - L-- -N 005737 E - - -� zz ..... °wnn...... 8 YENn8Y='9 S 8 - m °k �z ° E°° "Fo°z k £ 8 °zkF- ° ° _$F°u�_E ° EN_°gE � u = 4 ° °$'L! y'5555:535 ,S v- O o 056 Auet O,L14 z w / / o l o 051-1- / N L__ —_ -N 0000'07 v — •- z9z�s 061 Acret I 8 I I u °gBSw""'.,SS'!r° -m o"$YSS ° °S SB,KNOZZn 1 °u _ L -� -- -max aoarao-E - -- �_n 9.zo s_ -1 L'u'u'u SSS R" I 3 EEEFF£FF FF EE EFnn Fm m EEFEFFE££EFF FFEF 064 A—± m y�B.NNr1 110E° -.Y I o $ N o .m Y o 00;-101-- v S t°a'NS$ E '�yL ° "�� I L-- serest -- ° o -3 i9z PEI� z lo /L v ° L —_ - - -x OOWOD E - - - --1 I µ I � Qo�0u \ w \ ,� I ,°° I L_ o J 13 µ r I W I -w9at- -- \ s19..m s --1 f�.31`A �-- - - - -Na µ I I I° �' ?��3'_ ■F °d9�y.CJ8JwJ��i \? \ n W ' e — 070B.E-m - - -"1 I ° ^^ n�PLb's exa r S I I ' A I Q ��•14�' tl \ iSS�4�9—O \ V / I m r I L- -µ —_ —J i$ `_ II £E E£E£££° n µ W I 18'98! 34# gg$y \ '• 4 r, �� `��N l m I 31YSIZ09 ° _ ` \ \\ O 1' D \\ 2 UJ \ 1\ \ U r IL 2 L1,O 1 3,E191 L09 qq \\ �'r Po� r�Yg5 ei 39 .°. \ \ m � � :cn� ° 1d2��� $g�4Y4'"s' @9 yet g t §1� L '3��ts '' N \\ \ ����'''' I ; ,�� /S���n�ttd�•```` S$i9g g'�a1ja•j"'tli� I Jtrnmy R EI sG on. N C P LS L -3116 eeft fy that �� �1,115CArR "'rr This 25 day ot=lfareh 14 1� �� this plot was drown by me frorm_a actual survey that the '��$$ �iL `7 R Ellison NCPLS L -3116 by'me _(references as shorn rhere0n) dearly Indicated ias `� Q�': J�• _: �� 'b9.•y boundaries not surveyed are lines drawn frmn lnlormotion found, in references Q (; - Rodius shown, hereon that the ratio of pl'muucn as =_ SEAL Chord Len th calculated ws 1 10000 +, that this map meets .nests the requirements of the Standards of Practice = _ _ L -3116 r Vicinity mop for Land Surveying in North Carolina (21 NCAC 561600) ':v y , p-Z 4b ' \.Z i R t�1WN w�- This 25 day ot=lfareh 14 1� �� ,r� ,SUL';;• � r not to scale `7 R Ellison NCPLS L -3116 Curve Are Len th Rodius Oelto An se Chord Bearing Chord Len th C1 1 13058- 1025 00 T1T5i I N 80-17-.39- E 1 13049 - found Lake Tillery Pipe 0 -Z is found /� t iron u� pip o_ 1 E 1 }oundg1 16 / El 297 Y\ ' Iran N r60 3i / 46 26' 1 pipe El 304 9 1 t E1 2990 1 1 El 304 2 • 1 1 1 1 1767 V N t t Lot 34 1 3050 wow 1 t m Iz � Lot 32 t°r. �', Lot 33 1 t a, `0 0 82 Acre± 1 1 t 1 1 1 1 1 1 1 1 1 found 1 ` trr Iron rod `+_—- -- ---_ 1 found 1 iron C1 wad 11 I — 5a, P to son WnY -- Legend Soos Residence Morrow Mountain SW Quad Map E 0 Project Area 314 Plantation Way ' 'N ..,""'..:.j.. �; .rte � �.� %jl �� � _ f 0 S t ✓'%.vim- 11 y r. � i „ +t 1 inch = 633 feet f !w } �! i —TYcl� I tv I I �aDg zl- i - -- t� L � -. - --- rr•- -- i--; -i �1 I t I_ Y ���'��I�+ �I � � °_'- I l -. '} 1 I 1 I '� ��' � TAT ^ti_I�i) 1- ' -_ __► _.1__. LJ Page 12