Loading...
HomeMy WebLinkAboutWQCS00054_Response to Notice_20221103UNIONCOUNTY WAT E R November 3, 2022 Mr. Andrew H. Pitner, P.G., Assistant Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office 610 East Center Ave., Suite 301 Mooresville, NC 28115 Subject:Notice of Violation Tracking #: NOV-2022-DV-0311 Sanitary Sewer Overflows — September 2022 Collection System Permit — WQCS00054 Union County Water Dear Mr. Pitner: Union County Water has received the NOV referenced above for collection system overflows. Explanations of the overflows were on the BIMS Overflow Reporting Forms submitted by Union County Water to the NCDEQ. However, we have added a few additional facts in the explanations below. Incident # Date Location 202201398 9/5/2022 910 Sharon Drive, Waxhaw, NC 28173 The SSO listed in this section was due to a heavy rain event causing flooding of the entire basin which in turn overflowed from the lift station at this location. A new replacement pump station which will have more capacity is 90% complete and, once in service, will allow us to abandon this very old station. Also, we have been monitoring wastewater wet weather flows in this basin and are currently evaluating data to determine sources of I&I for future repair efforts. Union County Water also has an aggressive Capital Improvement Program throughout the next 5 years. The projects include: * Crooked Creek Basin Improvements - $47,000,000 ➢ Waxhaw Interceptor —$6,300,000 (Project is in active construction) ➢ WW PS Improvements - $5,800,000 Union County Water 4600 Goldmine Rd Monroe, NC 28112 T 704.289.1434 unioncountync.gov/water Union County Water's current CIP projects are also ongoing with projects including: ➢ Forest Park PS Replacement & Interceptor Improvements —Phase 1- $3,900,000 ➢ Crooked Creek I&I Study & Remediation - $633,000 Union County Water continues to invest funds into SSES work, capital improvements, maintenance, FOG, and operations to improve the wastewater collection system. If further information or details regarding the CCWRF Improvements, as well as, the CIP projects listed above are required, please feel free to contact Greg Morgan, Superintendent/ORC, at 704-289-3288 or myself at 704-296-4215. Thank you for your consideration on this issue. Sincerely, Andrew Neff, PE Water/Wastewater Division Director cc: Hyong Yi, Public Works Administrator Josh Brooks, Assistant Director, Water/Wastewater Operations Greg Morgan, Utility Field Services Superintendent/OR unioncountync.gov/water