Loading...
HomeMy WebLinkAboutNCC222569_Modification Confirmation Email_20221031Georgoulias, Bethany From: laserfiche@ncdenr.gov Sent: Monday, October 31, 2022 10:56 AM To: jamison.fair2@pultegroup.com Cc: Georgoulias, Bethany; chris.raughley@pultegroup.com; jamison.fair2 @pultegroup.com; john.wall@timmons.com Subject: Modification Confirmation This e-mail is to notify you that the modification information for COC No. NCC222569 for the project Del Webb @ Mallory Creek - Phase 1 that you submitted on 10/27/2022 has been added to the permit file records as of 10/31/2022. Modification Reason: Other Revision(s) to E&SC Plan Additional Details (if provided): The main Del Webb Boulevard entrance road has been realigned and subsequently a couple skimmer basins and diversion ditches relocated. Reed Canary Court has also been shortened to a small cul-de-sac with three lots. The previous skimmer basin and associated E&S measures treating the old LOD of the road have been removed as they were no longer necessary. Please see attached Summary of Revisions to Approved Plans for a detailed breakdown. You can find all Construction COC Permit files in our Document Repository here. Questions? Please contact The NC Stormwater Program at (919) 707-3640. This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not monitored.