Loading...
HomeMy WebLinkAboutSW6220704_Supplement-EZ Form_20221027SUPPLEMENT-EZ COVER PAGE PROJECT INFORMATION 1 Project Name Edison Acres 2 Project Area (ac) _ 55.26 3- Coastal Wetland Area ac 0 4 Surface Water Area ac 0 5 F— Is this project High or Low Density? ---- -- Low - -- - — - _� 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacksprovided Meet) _ _ _ 30' 8 Will the vegetated setback remain vegetated? Yes s 9 If BUA is proposed in the setback, _does it meet NCAC 02H:1003�4)�c-d�� _ N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System _ __— 0 12 Bioretention Cell — _ 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting (RWH) 0 18 s Green Roof ..------- --- _— ---- s._ 0 19 Level Spreader -Filter Strip (LS-FS) 0 20 _ _ _ _ Disconnected lmLervious Surface (DIS)—�_---® 0 F 21 Treatment Swale 22 Dry Pond_ 0 23 StormFilter 0 24 Silva Cell _ ._ 0 25 Bayfiker 0 26 Filterra 0 FORMS LO;V ' DESIGNER CERTIFICATION �..", ,�-._.,��d�--�.•_�=�•--".. ' "' 27 Name and Title: �'�-max Fleet Temple, PE 28 Organization: Fleet Temple Engineering, PLLC 29 Street address: 5245 Red Hill Church Rd. 30 City_State,-?�P: Coats, NC 27521 31 Phone number(s): 910-658-2446 32 — Email: fleet@ftempleengineering.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision, that the information provided in the form is, to the best of my knowledge and belief; true., accurate, and complete, and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here •a. 4 t r•e3,►� Seal C Si ature of Designer Date /C 2 -7 Zo7/L DRAINAGE AREAS 1 11stilisa Nghdensity project? Mo 2 ` Ifso, number of drainage areas/SCMs 0 3 .Does this project have low density areas? _ Yes _ 4 _ If so, number of low density drainage areas 1 Is all/part of this project subject to previous rule 5 versions? --_-. _�_�NO IVIS LOADED DRAINAGE AREA INFORMATION Entire Site LD 1 4 T of S C M 5 Total drainage area (sq ft) 2407038 2407038 6 Onsite drainage area (sq ft) 2407038 2407038 7 Offsite drainage area (sq ft� ^� 0 0 J... 8 Total BUA inproject (sq ft) 560203 sf 560203 sf New BUA on subdivided lots (subject to permitting) 9 (sq ft _ _ _ 4.95000 sf 495000 sf New BUA not on subdivided lots (subject to 10 rmitting) (sQ sf sf 11 imsite BUA ft sf j Breakdown of new BUA not on subdivided lots: L12I -Parking (sq _8idewalk (sqft)_—_ - - Roof ft -- — - - Roadway (sq ft) 65203 sf t 65203 sf I - Future (sq ft) _ Other, please specify in the comment box below ft New infiltrating permeable pavement on- 13 subdivided lots (sq _ft) _ --.------- —�.---- -- New infiltrating infiltrating permeable pavement not on 14 subdivided lots ft sf Existing BUA that will remain (not subject to a 15 rndtiri(sq R) ._. -- -- --- -- ---- _ _ --- - -- - 16 Existing BUA that is already permitted ft 17 iExisting BUA that will be removed (sq 18 Percent BUA 23% ^ 23% ^ _ _ 19 , Desig n storm (inches) � 26�&sig n volume of SCM (cu ft) 21 Calculation method for design volume ADDITIONAL INFORMATION j Please use this space to provide any additional information about the 22 drainage area(s): j E j LOW DENSITY 1 Is project below density thresholds set forth in the applicable stormwater rule? Yes 2 Does project maximize dispersed flow and minimize channelization of flow? Yes 3 Has the use of piping been minimized per .1003(2)(c)? Yes 4 Side slopes of the vegetated conveyances (H:V) 31 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 5 6 Are curb outlet swales proposed? Yes $ 7 Maximum longitudinal slope of curb outlet swale(s) (%) 10% 8 Bottom width of curb outlet swale(s) (feet)T_ -� 4' & 6 9 Maximum side slope of curb outlet swale(s) (H:V) 31 10 Minimum length of curb outlet swale(s) (feet) 100 ft 11 Are treatment swales used instead of curb outlet swales? N o 12 Is stormwater released at the edge of the setback as dispersed flaw? Yes 13 Have stormwater outlets been designed to prevent downslope erosion? Yes 14 Are variations to rule 1003 proposed? No ADDITIONAL INFORMATION _ 15 Please use this space to provide any additional information about this low density project z s m r t € CURB OUTLET SWALE& 21. 22 2124 � Drainage Pervious Swale Area BUA C Q Slope V,,,,w V-1 Flow depth # (ac) area (cfs) (%) (fps) (fps) (ft) 1 180 043 1 37 050 6.48 1 36 500 320 090 2 290 0.68 2.22 0.50 10A4 1.36 5.00 3.60 1 10 3 1.70 040 1.30 0.50 6.12 4.12 5.00 470 070 4 200 0,47 1.53 050 7.20 4 12 5.00 5.D0 0.80 5 0.40 0.09 0.31 0.50 1.44 4.12 500 3.20 0.40 6 0.70 017 0.53 0.50 2.52 4.12 500 370 050 7 0.20 0.05 015 050 072 1.00 500 1.60 0.40 8 040 0.09 0.31 0.50 1.44 1.00 5.00 1.90 0.50 9 0 50 012 038 0.50 1 80 2.77 5-00 300 0-50 10 1 30 0.31 099 0.50 468 2.77 500 3.80 0.70 11 0.30 0.07 023 0.50 1 08 1.92 5.00 230 040 12 0.80 0.19 0.61 0.50 2.88 192 5.00 2.90 060 13 050 0.12 038 050 1 80 1 92 5.00 260 050 14 050 0,12 038 0.50 1 80 1. 92 500 260 0.50 15 1 70 040 1 30 050 6 12 059 500 230 100 16 1-40 033 1 07 050 504 0.59 5-00 1.60 0.60 17 030 007 023 0.50 1.08 0.50 500 140 0.60 18 020 U5 0.15 0.50 072 0.50 500 120 0.50 19 110 026 0.84 0.50 3.96 9-74 500 3.40 0.60 20 050 0.12 0.38 050 1.80 9.74 500 2.80 050 21 180 043 1 37 050 648 2.50 5.00 340 0.40 22 1.00 0.24 0.76 050 3 60 2.00 5.00 270 0.30 i 23 160 0.38 122 050 5.76 10.00 5.00 470 0.20 24 2.10 0.50 1.60 0.50 7.56 2.50 5.00 3.40 0.40 25 26 - 3 27 - - 28 - 29 30