Loading...
HomeMy WebLinkAboutNCC223636_ESC Approval Submitted_20221031ROY COOPERrr-` Governor ELIZABETH S. BISER m; Secretary BRIAN WRENN Director NOR r i CAROlmINA EAVh-onmentwdQuathy August 11, 2022 LETTER OF APPROVAL WITH MODIFICATIONS Rutherford Electric Membership Corporation Attention: Colon L. Saunders, V.P. of Operations Post Office Box 1569 Forest City, North Carolina 28043 RE: Project Name: REMC Lowesville to South Denver Transmission Line Acres Approved: 44.34 Project ID: LINCO-2022-007 County: Lincoln, City: Catawba Springs Address: N. Pilot Knob to N. Little Egypt River Basin: Catawba Stream Classification: Other Submitted By: Todd Poteet, PE, West Consultants, PLLC Date Received by LQS: July 28, 2022 Plan Type: Revised Dear Mr. Saunders: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable. with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGOI. Please direct questions about the eNOI form to the Storrnwater -Program _staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO I permit require that the following documentation be kept on file at the job site: North Carolina Department of Environmemai Quality j Division of Energy, Mineral and Ladd Resources Mooresville Regional Office 1610 Cast Center Avenue, suite 3011 Mooresville, North Carolina 28115 704-663-1699 Letter of Approval with Modifications Rutherford Electric Membership Corporation August 11, 2022 Page 2 of 3 l . The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. I13A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land - disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Shannon Leonard Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGOI Fact Sheet c: Inspection Department ec: Todd Poteet, PE Letter of Approval with Modifications Rutherford Electric Membership Corporation August 11, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: REMC Lowesville to South Denver Transmission Line Project ID: LINCO-2022-007 County: Lincoln I . Straw wattles shall be placed along LOD (low side) in the following existing channels: near STA 0+75 (Rt) and near STA 90+00 (Lt). 2. Sediment Traps 1, IA, 2 and 3 (Sheet 5) shall be moved downstream (towards stream, as far as possible) to contain as much roadway fill as possible. The traps shall be located a minimum 15' from top of stream banks. If this cannot be achieved due to Feld constraints, sufficient excavated storage area shall be provided in the stone outlets of silt fence at toe of fill slopes. 3. Silt fence without wire backing shall have post spacing of 6(maximum). Silt fence with wire backing shall have post spacing of 8' (maximum). . 4. Rip -Rap Plunge Pool Detail on Sheet 10 shall include dimensions for a 60" pipe. Submit two copies of changes to Sheets 8 & 10 prior to the start of land disturbance activities. CD We PAD �i b N womw 0, c ro e 0 DD n "C �r • �• *We 0 D "We f© M M ., CD mw ® fD rz CD �• "� a4} CA `.eee, Rfell Oemo' o OMD � a•