Loading...
HomeMy WebLinkAboutNCC191598_NOT Closeout Documents_20221025North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Catawba Project: Line 451-Duke Marshall Steam Plant River basin: Catawba Person financially responsible: Piedmont Natural Gas - Jason A Brown, Project Project #: CATAW-2020-001 Manager Address: 4720 Piedmont Row Drive, Charlotte, NC 28210 1. Project Location: NC Highway 150, Sherrills Ford Pictures: No 2. Weather and soil conditions: Sunny, workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Wade Hollifield Inspection report: Sent Report 9. Corrective action needed: Title: Project Manager Date given/sent: October 21, 2022 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO 1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https:Hedoes.deq.ne.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. All projects that have been approved prior to April 01, 2019, under the old permit system, are not required to take any additional actions. The stormwater permit is terminated at the same time as the termination of this erosion control permit. Reported by: Joseph Hoy Others present: Date of inspection: October 19, 2022 Time arriving on site: 09:35 AM Time leaving site: 11:30 AM cc: