Loading...
HomeMy WebLinkAbout20220600 Ver 1_More Information Requested_20220804Roland, I have begun my review of the project and require some additional information: 1. My understanding of the Additional Information provided on July 5, 2022, is that requested linear footage has changed from the 350 linear feet shown in the PCN. I see 190 lf of culverts proposed, but it is unclear if this is the revised impact amount. Impact length should be measured along the centerline of the stream/ditch and may be greater than the length of the proposed culvert. Additionally, rip rap is often listed separately from culverts. Please provide an updated impact table to DWR and the USACE to ensure that both agencies are using the same information. [15A NCAC 02H .0502(c)] 2. Per the Additional Information Response, it is my understanding that Marshall Commercial Property, listed as the Owner, is the Applicant, not Spring Engineering, Inc. Spring Engineering, Inc, is listed as the Applicant on the PCN. Please confirm. Thanks, Colleen Cohn Environmental Specialist II North Carolina Department of Environmental Quality Division of Water Resources Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 27609 Office: 919-791-4258 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Roland P. Dove <rdove@springengineeringinc.com> Sent: Monday, August 1, 2022 9:33 AM To: Cohn, Colleen M <colleen.cohn@ncdenr.gov> Cc: Richard M. Bekesh <richardmbekesh@springengineeringinc.com>; Spring Engineering, Inc. <sei@springengineeringinc.com>; Jay Doucette <jdoucette@springengineeringinc.com> Subject: [External] Toyota of Roanoke Rapids 2021-40 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. <mailto:report.spam@nc.gov> Good morning Colleen, Please update us on the status of your review of the Toyota of Roanoke Rapids project. The Corps has advised us that we have to provide mitigation for the impacts to the streambed of this intermittent ditch and we will be purchasing the credits from the States In-lieu system. We would appreciate receiving your update as soon as possible. Thanks. Sincerely, Rollie Roland P. Dove, P.E. Director of Engineering rdove@springengineeringinc.com <mailto:rdove@springengineeringinc.com> http://www.springengineeringinc.com <https://urldefense.com/v3/__http:/www.springengineeringinc.com/__;!!HYmSToo!fUntyF4o9aTZ1R9z4g12XLo2ZLerHQprPA9DNJKht6gswYGuLLUXimL07XFWs0BP9p7zmykw8uXkz9ncbYa7jqqgWo8ukQ$> <https://urldefense.com/v3/__https:/www.facebook.com/springengineeringinc__;!!HYmSToo!fUntyF4o9aTZ1R9z4g12XLo2ZLerHQprPA9DNJKht6gswYGuLLUXimL07XFWs0BP9p7zmykw8uXkz9ncbYa7jqrtWJIjfg$> <https://urldefense.com/v3/__https:/www.linkedin.com/in/richardmbekesh/__;!!HYmSToo!fUntyF4o9aTZ1R9z4g12XLo2ZLerHQprPA9DNJKht6gswYGuLLUXimL07XFWs0BP9p7zmykw8uXkz9ncbYa7jqqSTz5nXg$> <https://urldefense.com/v3/__https:/twitter.com/springengineer__;!!HYmSToo!fUntyF4o9aTZ1R9z4g12XLo2ZLerHQprPA9DNJKht6gswYGuLLUXimL07XFWs0BP9p7zmykw8uXkz9ncbYa7jqq31pHhMw$> This communication is confidential and may be legally privileged. It is agreed by the recipient of this data that the work project is the sole and exclusive property of Spring Engineering, Inc. and that it will not be provided to any additional users, including surveyors, engineers, architects, planners, contractors, etc., without the approval and consent of this firm. It is understood that the accuracy of any data obtained by this transmittal is subordinate to the certified paper drawing and that SEI assumes no liability in the use of this data. AutoCAD File Disclaimer The accompanying files are supplied as a matter of courtesy and are in no way to be taken as appurtenant to, associated with or as a replacement of copies of the officially sealed documents. The data is provided "as is" without warranty of any kind either expressed or implied. Any person(s) or organization(s) making use of or relying upon this data, is responsible for confirming its accuracy and completeness. These files do not include a professional architect/engineer's stamp and only drawings with such stamp are to be considered as true and final. SPRING ENGINEERING, INC. is not responsible for edited or reproduced versions of this digital data.