Loading...
HomeMy WebLinkAboutSW6221004_Supplement-EZ Form_20221021JVr1—LG111IGItl 1 <+VYGR r/"1VG FORMS LOADED PROJECT INFORMATION 1 Project Name Automotive Maintenance Shop - EEB Holdings, LLC. 2 Project Area ac 4.98 3 Coastal Wetland Area ac 0 4 Surface Water Area ac 0 5 Is this project High or Low Density? High 6 1 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided (feet) 30 8 Will the vegetated setback remain vegetated? _ Yes 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 1 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting RWH 18 Green Roof 19 Level Spreader -Filter Strip (LS-FS) 20 Disconnected Impervious Surface DIS 21 1 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Kenneth Smith Jr., PE PLS Smith Site Consultants, PLLC. 121 Bulittle Drive Linden, NC 28356 910-391-5923 28 Organization: 29 Street address: 30 City, State, Zip: 31 Phone number(s): 32 Email: smithsiteconsuftantst@gmail.com Certification Statement: I certify, under penalty of law that this Supplement-FZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete, and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. ���ttttllli \A CAR 0 2 SEA, L • Aj 45277 �fl1GlI�C' Seal Signature of Designer Date JIMAIIVHVC Amr-Aa 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED RAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Infiltration Basin 216929 216929 Infiltration Basin " s 162915 1_6.2915 0_ 55550 sf 5 Total drainage area (sq ft 6 Onsite drainage area (sq ft 7 Offsite drainage area (sq ft 0 8 Total BUA in project (sq ft) 55550 sf 9 New BUA on subdivided lots (subject to permitting) sq ft New BUA not on subdivided lots (subject to s 55550 sf 10permitting) 55550 sf 11 Offsite BUA (sq ft 12 Breakdown of new BUA not on subdivided lots: - Parkin sq ft 29979 sf 29979 sf - Sidewalk (sq ft) 505 sf 505 sf - Roof (sq ft) 18000 sf 18000 sf - Roadway s ft - Future (sq ft 5066 sf 5066 sf - Other, please specify in the comment box below (sq ft) 2000 sf 2000 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft) 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15permitting) Existing BUA that will remain (not subject to s ft 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft 18 Percent BUA 26% 34% 19 Design storm inches 1.0 in 1.0 in !0 Design volume of SCM cu ft 5464 cf 5464 cf !1 Calculation method for design volume Simple Method Simple Method DDITIONAL INFORMATION !2 Please use this space to provide any additional information about the drainage area(s): INFILTRATION SYSTEM 1 jDrainage area number 1 2 1 Minimum reauired treatment volume (cu ft) I Q54b cf 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes What are the side slopes of the SCM (H:V or enter "Vertical' for 5 trenches)? 3:1 Does the SCM have retaining walls, gabion walls or other engineered 6 side slopes? No Are the inlets, outlets, and receiving stream protected from erosion 7 10-yea r storm)? Yes Is there an overflow or bypass for inflow volume in excess of the 8 rlecinn vnhlma9 Yes 9 lWhat is the method for dewatering the SCM for maintenance? Drawdown Orifice 10 1 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? N/A 14 Is there an O&M Agreement that complies with General MDC (11)? f Yes Is there an O&M Plan that complies with General MDC (12)? Yes T15 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes 18 Proposed slope of the subgrade surface (%) 0% 19 Are terraces or baffles provided? No 20 Type of pretreatment: Forebay 21 Was the soil investigated in the footprint and at the elevation of the infiltrations stem? Yes 22 SHWT elevation (frnsl) 205.46 23 Depth to SHWT per soils report (in) 68.00 24 Ground elevation at boring in soils report (fmsl) 211.13 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? N/A 26 ISoil infiltration rate (in/hr) 3.40 27 1 Factor of safe (FS) (2 is recommended): 2.00 1 FIAWAtinnc 29 Bottom elevation (fmsl) 208.25 30 Storage elevation (fmsl) 209.25 31 1 Bypass elevation frnsl) 209.25 For Basins Only 32 Bottom surface area(ft) 5,000 33 IStorage elevation surface area(ft) 5,928 F— T—nrhnc nn/v 34 Length (ft) 35 Width (ft) 36 Perforated pipe diameter, if applicable (inches) 37 Number of laterals 38 Total length of perforated piping 39 Stone type, if applicable 40 Stone porosity (%) 41 Is stone free of fines? 42 Is the stone wrapped in geotextile fabric? 43 1 Has at least one inspection port beenprovided? Volumes/Drawdown 44 IDesign volume of SCM (cu ft) 5464 cf 45 1 Time to draw down (hours) ZU nrs 46 Please use this space to provide any additional information about the infiltration system(s): Infiltration 3 10:31 AM 10/12/2022 INFILTRATION SYSTEM Infiltration 4 10:31 AM 10/12/2022