Loading...
HomeMy WebLinkAboutNCC223655_ESC Approval Submitted_20221026ROY COOPER Governor ELIZABETH S. BISERl- Secretary z BRIAN WRENN Director NORTH CAROLINA Environmental Quality October 13, 2022 LETTER OF APPROVAL WITH MODIFICATIONS Duke Energy Carolinas, LLC Attention: Issa J. Zarzar, GM CCP Project Manager 400 S Tryon St., Suite 30C Charlotte, NC 28202 RE: Project Name: Belews Creek West Borrow Area Project ID: STOKE-2023-006 Acres Approved: 15.1 County: Stokes City: Belews Creek Address: Pine Hall Rd. River Basin: Roanoke Stream Classification: WS-IV Submitted By: AECOM Date Received by LQS: September 21, 2022 Plan Type: New Dear Sir or Madam: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The modifications required for approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO 1. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. North Carolina Department of Environmental Quality d Division of Energy, Mineral and Land Resources Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27105 336-776-9800 Letter of Approval with Modifications Duke Energy Carolinas, LLC October 13, 2022 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Tamera Epli ,YPE Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval AECOM ATTN: Ramachandran Kulasingam 6000 Fairview Rd., Suite 200 Charlotte, NC 28210 Letter of Approval with Modifications Duke Energy Carolinas, LLC October 13, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Belews Creek West Borrow Area Project ID: STOKE-2023- County: Stokes Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: 1. Approval of this erosion and sediment control plan does not supersede any requirements or provisions of North Carolina Senate Bill 729, The Coal Ash Management Act, the Dam Safety Act of 1967, as amended, or any other applicable regulation. 2. The NPDES General Construction Stormwater Permit does not supersede any existing or potential wastewater and/or industrial stormwater permit requirements, or any other applicable regulation. 3. This office must be notified prior to any borrow materials being transported to any site other than the Belews Creek Steam Station. Any off -site borrow and waste required for this project must come from a site with an approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and regulations. [15A NCAC 4B .0110] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities