Loading...
HomeMy WebLinkAboutWQ0034367_Compliance Evaluation Inspection_20221024Compliance Inspection Report Permit: WQCSD0222 Effective: 03/01/00 Expiration: SOC: Effective: Expiration: County: Rockingham Region: Winston-Salem Contact Person: Fred Curl Directions to Facility: Owner : Hidden Valley Inc Facility: Hidden Valley Estates Collection System Title: Phone: 336-505-3300 System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09/27/2022 Primary Inspector: Gary Hudson Secondary Inspector(s): Entry Time 10:OOAM Exit Time: 12:OOPM Phone: 336-776-9694 Reason for Inspection: Routine Inspection Type: Collection System Inspect Non Sampling Permit Inspection Type: Deemed permitted collection system management and operation Facility Status: Compliant ❑ Not Compliant Question Areas: Miscellaneous Questions General Grease Control II Spills/Response Plan Inspections (See attachment summary) Page 1 of 4 Permit: WQCSD0222 Owner - Facility: Hidden Valley Inc Inspection Date: 09/27/2022 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Inspection Summary: *Mr. Montero does a good job keeping maintenance and inspection records. *FOG flyers are mailed out twice per year. *The Spill Response Action Plan was presented during the inspection. No discrepancies were noted. *There are no pump stations in the system. *AII the maintenance and inspection logs are kept at the wastewater treatment plant. The collection system appeared to be well operated and maintained. No discrepancies were noted during the inspection. Page 2 of 4 Permit: WQCSD0222 Owner - Facility: Hidden Valley Inc Inspection Date: 09/27/2022 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine General # Is this system a satellite system? # If Yes, what is system name or permit number? Is there a overall sewer system map? Does the map include: Pipe sizes Pipe materials (PVC, DIP, etc) Pipe location # Flow direction # Approximate pipe age # Pump station ID, location and capacity # Force main air release valve location & type # Location of satellite connections Are system maintenance records maintained? Comment: *Mr. Montero does a good job keeping maintenance and inspection records. Grease Control Is grease/sewer education program documented with req'd customer distribution? # Are other types of education tools used like websites, booths, special meetings, etc? If Yes, what are they? (This can reduce mailing to annual.) For public systems, is there a Grease Control Program via an ordinance/agreement? If Yes, does it require grease control devices at applicable locations? Is the Grease Control Program enforced via periodic inspections/records review? Is action taken against violators? Comment: *FOG flyers are mailed out twice per year. Spills and Response Action Plan # Is system free of known points of bypass? # Have there been any sewer spills in the past 3 years? If Yes, were they reported to the Division if meeting the reportable criteria? If applicable, is there documentation of press releases and public notices issued? Are all spills or sewer related issues/complaints documented? # Are there repeated overflows/problems (2 or more in 12 months) at same location? # If Yes, is there a corrective action plan? Is a Spill Response Action Plan available? Is a Spill Response Action Plan available for all personnel? Yes No NA NE • ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ • ❑ ❑ ❑ ❑ • ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ Yes No NA NE • ❑ ❑ ❑ ❑ ❑ ❑• • ❑ ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑• ❑ Yes No NA NE • ❑ ❑ ❑ ❑ • ❑ ❑ ❑ ❑•❑ ❑ ❑ • ❑ • ❑ ❑ ❑ ❑ • ❑ ❑ ❑ ❑ • ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Page 3 of 4 Permit: WQCSD0222 Owner - Facility: Hidden Valley Inc Inspection Date: 09/27/2022 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Does the plan include: # 24-hour contact numbers • ❑ ❑ ❑ # Response time ❑ • ❑ ❑ # Equipment list and spare parts inventory ❑ • ❑ ❑ # Access to cleaning equipment • ❑ ❑ ❑ # Access to construction crews, contractors, and/or engineers • ❑ ❑ ❑ # Source of emergency funds ❑ ❑ ❑ • # Site sanitation and cleanup materials • ❑ ❑ ❑ # Post-overflow/spill assessment ❑ • ❑ ❑ Comment: *The Spill Response Action Plan was presented during the inspection. No discrepancies were noted. Inspections Are adequate maintenance records maintained? Are pump stations being inspected at the required frequency? Is at least one complete functionality test conducted weekly per pump station? Is there a system or plan in place to observe the entire system annually? Is the annual inspection documented? # Does the system have any high -priority lines/locations? Are inspections of HPL documented at least every 6 months? Are new lines being added to the HPL list when found or created? Comment: *There are no pump stations in the system. *AII the maintenance and inspection logs are kept at the wastewater treatment plant. The collection system appeared to be well operated and maintained. No discrepancies were noted during the inspection. Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Page 4 of 4