Loading...
HomeMy WebLinkAbout20220863 Ver 1_More Info Received_20221020Baker, Caroline D From: Steve Janowski <sjanowski@riversa ndassociates.com> Sent: Thursday, October 20, 2022 7:09 AM To: Tankard, Robert; Thompson, Emily B CIV USARMY CESAW (USA); Williams, Kim Cc: Stuart Barwick Subject: Re: [External] Re: [URL Verdict: Neutral] [Non-DoD Source] Re: SAW-2019-00684 (Quail Woods Village LTD/Anderson, Gerald/Craven) Attachments: The Refuge at Broad Creek Ex Conditions.pdf, The Refuge at Broad Creek Grading .pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Here are the final drawings Thankyou Steve J. Stephen Janowski, PE Raleigh Office Director, Associate Senior Project Manager v F• j vers-�,,Y Six Forks Place III 353 E. Six Forks Road Suite 230 Raleigh, NC 27609 0: 919-594-1626 ext 6278 M: 252-714-3002 From: Tankard, Robert <robert.tankard@ncdenr.gov> Sent: Friday, October 7, 2022 2:18 PM To: Steve Janowski <sjanowski@riversandassociates.com>; Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil>; Williams, Kim <Kim.Williams@davey.com> Cc: Stuart Barwick<sbarwick@rive rsandassociates.com> Subject: RE: [External] Re: [URL Verdict: Neutral][Non-DoD Source] Re: SAW-2019-00684 (Quail Woods Village LTD/Anderson, Gerald/Craven) Steve, when do you think we could a final plat drawing of the changes? Would love to go ahead and finalize this project. Thanks! Robert Robert Tankard Assistant Regional Supervisor 1 Division of Water Resources North Carolina Department of Environmental Quality Office: (252) 948-3921 1 Cell: (252) 402-5694 Robert.tankarda-ncdenr.gov D7 E NORTH CAROLINA :;� Q Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Steve Janowski<sjanowski@riversandassociates.com> Sent: Thursday, October 6, 2022 4:08 PM To: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil>; Williams, Kim <Kim.Williams@davey.com> Cc: Tankard, Robert <robert.tankard@ncdenr.gov>; Stuart Barwick<sbarwick@rive rsandassociates.com> Subject: [External] Re: [URL Verdict: Neutral][Non-DoD Source] Re: SAW-2019-00684 (Quail Woods Village LTD/Anderson, Gerald/Craven) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. The intent was not to put the pipe in the fill. I have adjusted and will do so on the final plans The culvert in the fill between lot 3 and 15 is necessary to drain the NCDOT swales. Y 0.56 AC (24328 3F) GE E LE R! Ecl SWAD - A O 0-46 AG 7-- 140 LF 18' H Dip EQUALIZATION PIPE L WETLANDS I -sU 441 r 27X50 INV SWALE 9,5 0.81, AC F4 J. Stephen Janowski, PE Raleigh Office Director, Associate Senior Project Manager v lf�vers-v- & ASSOCIATES, INC. Six Forks Place III 353 E. Six Forks Road Suite 230 Raleigh, NC 27609 0: 919-594-1626 ext 6278 75X'Z 27% 2-- dopw, C- 9m v 67 . . . . . . . . . . . . 'm C3 II 0.35 AC (15118 SF} M: 252-714-3002 From: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Sent: Thursday, October 6, 2022 9:31 AM To: Steve Janowski<sianowski@riversandassociates.com>; Williams, Kim <Kim.Williams@davey.com> Cc: Tankard, Robert <robert.tankard@ncdenr.gov>; Stuart Barwick <sbarwick@ rive rsandassociates.com> Subject: RE: [URL Verdict: Neutral][Non-DoD Source] Re: SAW-2019-00684 (Quail Woods Village LTD/Anderson, Gerald/Craven) Hi Steve, I've reviewed the plans and discussed with DWR that the plans are not adequate. The pipe in lot 6 does not connect to the wetlands; it's within the fill footprint. There's no connectivity purpose of the pipe between lots 15 and 3 since the wetlands in lot 15 would be filled. That culvert could be removed if not necessary for your stormwater management, but it appears it would go uphill to connect to the swale on lot 3. The pipe between lot 3 and 6 is also within the fill footprint. If you move the pipes out of the swale/fill footprint to connect to the wetlands and can provide an elevation view of each showing a slope of 0, that would be acceptable. We have reviewed several iterations, and the same concerns have not been addressed. If you cannot provide the information necessary and the impacts would exceed the 0.5-acre threshold with impacting the remaining wetlands, then you'll need to submit an Individual Permit. Otherwise, you'll need to modify the plans to reduce the impacts to allow clear hydrologic connectivity/aquatic passage if it cannot be completed with the current design. Please let me know if you have any questions. Sincerely, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily. B.Thompsona-usace.army. mil We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: httos://reaulatorv.00s.usace.armv.mil/customer-service-survev/ Thank you for taking the time to visit this site and complete the survey From: Steve Janowski<sianowski@riversandassociates.com> Sent: Tuesday, September 20, 2022 10:02 AM To: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil>; Williams, Kim <Kim.Williams@davey.com> Cc: Tankard, Robert <robert.tankard@ncdenr.gov>; Stuart Barwick <sbarwick@ rive rsandassociates.com> Subject: Re: [URL Verdict: Neutral][Non-DoD Source] Re: SAW-2019-00684 (Quail Woods Village LTD/Anderson, Gerald/Craven) Emily I separated the roadside swales from the wetlands and put two equalization pipes in to create the connectivity. If this is acceptable I will finish the design and get you a signed drawing thanks Steve J. Stephen Janowski, PE Raleigh Office Director, Associate Senior Project Manager 11 N* vers,�, ,OCIATES, INC. Six Forks Place III 353 E. Six Forks Road Suite 230 Raleigh, NC 27609 0: 919-594-1626 ext 6278 M: 252-714-3002 From: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Sent: Thursday, September 1, 2022 7:10 AM To: Steve Janowski<sianowski@riversandassociates.com>; Williams, Kim <Kim.Williams@davey.com> Cc: Tankard, Robert <robert.tankard@ncdenr.gov>; Stuart Barwick<sbarwick@rive rsandassociates.com> Subject: RE: [URL Verdict: Neutral][Non-DoD Source] Re: SAW-2019-00684 (Quail Woods Village LTD/Anderson, Gerald/Craven) Hi Steve, The markup doesn't provide any elevations, so it still appears Section A would have to go uphill to the added ditch and Section C would have to go uphill through the culvert to connect to the added ditch. Could you install two culverts that would directly connect to the wetlands? If we cannot determine that wetlands would maintain hydrologic connectivity/aquatic passage with the road as proposed, you may need to modify the plans to avoid/minimize impacts to the wetland. Sincerely, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily. B.Thompsona-usace.army. mil We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://reaulatorv.ops.usace.armv.mil/customer-service-survev/ Thank you for taking the time to visit this site and complete the survey From: Steve Janowski<sianowski(@riversandassociates.com> Sent: Wednesday, August 31, 2022 10:25 PM To: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil>; Williams, Kim <Kim.Williams@davey.com> Cc: Tankard, Robert <robert.tankard@ncdenr.gov>; Stuart Barwick<sbarwick@rive rsandassociates.com> Subject: Re: [URL Verdict: Neutral][Non-DoD Source] Re: SAW-2019-00684 (Quail Woods Village LTD/Anderson, Gerald/Craven) Wanted to see if this was acceptable so we can make the changes and submit. J. Stephen Janowski, PE Raleigh Office Director, Associate Senior Project Manager :l�ver n ASSOCIATES, INC. Six Forks Place III 353 E. Six Forks Road Suite 230 Raleigh, NC 27609 0: 919-594-1626 ext 6278 M : 252-714-3002 From: Steve Janowski<sianowski@riversandassociates.com> Sent: Thursday, August 25, 2022 7:36 AM To: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil>; Williams, Kim <Kim.Williams@davey.com> Cc: Tankard, Robert <robert.tankard@ncdenr.gov> Subject: Re: [URL Verdict: Neutral][Non-DoD Source] Re: SAW-2019-00684 (Quail Woods Village LTD/Anderson, Gerald/Craven) I think I understand. I have marked in blue a ditch connection that would be deep enough to connect and a pipe connection Your thoughts J. Stephen Janowski, PE Raleigh Office Director, Associate Senior Project Manager 0 K l ver & ASSOCIATES, INC. Six Forks Place III 353 E. Six Forks Road Suite 230 Raleigh, NC 27609 0: 919-594-1626 ext 6278 M: 252-714-3002 From: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Sent: Wednesday, August 24, 2022 4:50 PM To: Steve Janowski<sianowski@riversandassociates.com>; Williams, Kim <Kim.Williams@davey.com> Cc: Tankard, Robert <robert.tankard@ncdenr.gov> Subject: RE: [URL Verdict: Neutral][Non-DoD Source] Re: SAW-2019-00684 (Quail Woods Village LTD/Anderson, Gerald/Craven) Hi Steve, Please see the attached — my most recent response/comment focuses on Wetland C and the remaining wetlands with the proposed road construction. There would be wetlands remaining within Lots 3 and 6, and the swales do not appear to be sufficient to provide and maintain aquatic passage/hydrologic connectivity. From my understanding, a pipe would connect the remaining wetlands in Lot 3 to a swale along Lot 15, where wetland fill is proposed at this time. This does not show how hydrologic connectivity/aquatic passage would be maintained with the wetlands between Lots 5 and 6. The remaining wetlands in Lot 6 would have to go uphill to connect to the swale (8.1 4 8.5), and then the swale would be uphill (8.5 4 9.5) to connect to the wetlands in Lots 5 and 6. A potential solution to this issue would be to construct culverts that would allow direct connection from the two remaining wetlands in Lots 3 and 6 to the proposed unimpacted area of Wetland C between Lots 5 and 6. Another solution would be modify the proposed plans to avoid "isolating" wetlands. Sincerely, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily. B.Thompsona-usace.army. mil We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://reaulatorv.ops.usace.armv.mil/customer-service-survev/ Thank you for taking the time to visit this site and complete the survey From: Steve Janowski<sianowski@riversandassociates.com> Sent: Tuesday, August 23, 2022 7:28 AM To: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil>; Williams, Kim <Kim.Williams@davey.com> Cc: Tankard, Robert <robert.tankard@ncdenr.gov> Subject: Re: [URL Verdict: Neutral][Non-DoD Source] Re: SAW-2019-00684 (Quail Woods Village LTD/Anderson, Gerald/Craven) Give me more detail in your thinking. Wetland B is not connected now. Wetland A is connected to the top of the bank of the ditch in the rear. Wetland C has one point of connection to the top of the bank at the rear of the ditch. Mark up a pdf and send me those thoughts J. Stephen Janowski, PE Raleigh Office Director, Associate Senior Project Manager !lfvers Six Forks Place III 353 E. Six Forks Road Suite 230 Raleigh, NC 27609 0: 919-594-1626 ext 6278 M: 252-714-3002 From: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Sent: Monday, August 22, 2022 3:45 PM To: Steve Janowski<sianowski@riversandassociates.com>; Williams, Kim <Kim.Williams@davey.com> Cc: Tankard, Robert <robert.tankard@ncdenr.gov> Subject: RE: [URL Verdict: Neutral][Non-DoD Source] Re: SAW-2019-00684 (Quail Woods Village LTD/Anderson, Gerald/Craven) Hi Steve, Thank you for your responses. Maintaining wetland connectivity is still an outstanding issue — have you considered installing culverts to connect the wetlands rather than relying on swales? Sincerely, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily. B.Thompsona-usace.army. mil We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://reaulatorv.ops.usace.armv.mil/customer-service-survev/ Thank you for taking the time to visit this site and complete the survey From: Steve Janowski<sianowski@riversandassociates.com> Sent: Friday, August 19, 2022 12:23 PM To: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil>; Williams, Kim <Kim.Williams@davey.com> Cc: Tankard, Robert <robert.tankard@ncdenr.gov> Subject: Re: [URL Verdict: Neutral][Non-DoD Source] Re: SAW-2019-00684 (Quail Woods Village LTD/Anderson, Gerald/Craven) When we record the final plat we will record the wetland limits also J. Stephen Janowski, PE Raleigh Office Director, Associate Senior Project Manager 01f�vers-lw ASSOCIATES, INC. Six Forks Place III 353 E. Six Forks Road Suite 230 Raleigh, NC 27609 0: 919-594-1626 ext 6278 M : 252-714-3002 From: Steve Janowski<sianowski@riversandassociates.com> Sent: Friday, August 12, 2022 2:46 PM To: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil>; Williams, Kim <Kim.Williams@davey.com> Cc: Tankard, Robert <robert.tankard@ncdenr.gov> Subject: Re: [URL Verdict: Neutral][Non-DoD Source] Re: SAW-2019-00684 (Quail Woods Village LTD/Anderson, Gerald/Craven) There is enough room for the culvert J. Stephen Janowski, PE Raleigh Office Director, Associate Senior Project Manager 010versms ASSOCIATES INC Six Forks Place III 353 E. Six Forks Road Suite 230 Raleigh, NC 27609 0: 919-594-1626 ext 6278 M: 252-714-3002 From: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Sent: Friday, August 12, 2022 2:27 PM To: Steve Janowski<sianowski@riversandassociates.com>; Williams, Kim <Kim.Williams@davey.com> Cc: Tankard, Robert <robert.tankard@ncdenr.gov> Subject: RE: [URL Verdict: Neutral][Non-DoD Source] Re: SAW-2019-00684 (Quail Woods Village LTD/Anderson, Gerald/Craven) Hi Steve and Kim, Robert and I discussed the plans and, it is still hard to determine whether the remaining wetlands in Lots 3 and 6 would be connected and maintain connectivity to the wetlands bordering Lot 5/6 utilizing swales. Installing culverts may be the best way to ensure maintained connectivity. Would the interested buyers be provided the delineation/plans? Is there enough room on Lot 6 to construct a driveway without filling wetlands? The concern is that the owners of Lots 3, 6, and 8 may inadvertently fill wetlands when designing/building their houses. Sincerely, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily. B.Thompsona-usace.army. mil We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://reaulatorv.ops.usace.armv.mil/customer-service-survev/ Thank you for taking the time to visit this site and complete the survey From: Steve Janowski<sianowski(@riversandassociates.com> Sent: Wednesday, August 10, 2022 10:52 AM To: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil>; Williams, Kim <Kim.Williams@davey.com> Subject: Re: [URL Verdict: Neutral][Non-DoD Source] Re: SAW-2019-00684 (Quail Woods Village LTD/Anderson, Gerald/Craven) Emily I have attached the detailed the representative spot elevations on the plat showing wetland connectivity Let me know if you have any questions Thankyou Steve J. Stephen Janowski, PE Raleigh Office Director, Associate Senior Project Manager • -,,.,Pjivers $ASSOCIATES, IN(, Six Forks Place III 353 E. Six Forks Road Suite 230 Raleigh, NC 27609 0: 919-594-1626 ext 6278 M: 252-714-3002 10 From: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Sent: Monday, August 8, 2022 10:56 AM To: Williams, Kim <Kim.Williams@davey.com> Cc: Steve Janowski<sianowskiPriversandassociates.com> Subject: RE: [URL Verdict: Neutral][Non-DoD Source] Re: SAW-2019-00684 (Quail Woods Village LTD/Anderson, Gerald/Craven) Hi Kim, Thank you for the response. Can you provide a cross-section of the proposed roadside swales and existing wetland elevations? We would need to ensure that the swales would not isolate OR drain the wetlands. The swales would need to be constructed at the same elevation to maintain this balance. Sincerely, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily. B.Thompsona-usace.army. mil We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://reaulatorv.ops.usace.armv.mil/customer-service-survev/ Thank you for taking the time to visit this site and complete the survey From: Williams, Kim <Kim.Williams@davey.com> Sent: Monday, August 8, 2022 9:49 AM To: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Cc: Steve Janowski<sianowski(@riversandassociates.com> Subject: [URL Verdict: Neutral][Non-DoD Source] Re: SAW-2019-00684 (Quail Woods Village LTD/Anderson, Gerald/Craven) Hi Emily I coordinated with the project engineer regarding your comments and have the following responses. Aquatic life movements: The remaining wetland areas will be connected via roadside swales. See attached plan with arrows indicating connection. Avoidance and minimization: The engineer attempted to avoid and minimize impacts as much as possible. Unfortunately, the wetland pocket to be impacted is located in the middle of the site and it was not possible to avoid it without losing several lots, which would have made the project economically infeasible. The lots were laid out to place septic systems in suitable soils. The attached site plan includes suitable/unsuitable soils with the lot layout that helps to demonstrate this. Let me know if you have any other questions. 11 Thanks! Kim On Tue, Jul 26, 2022 at 5:13 PM Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> wrote: Hi Kim, I'm reviewing the Quail Woods PCN and have a few questions/comments. From the project plans, it appears that "Wetland Impact #1" would isolate two portions of the wetland (Lots 3 & 6) which would not meet the 2nd general condition of NWP 29: "Aquatic Life Movements. No activity may substantially disrupt the necessary life cycle movements of those species of aquatic life indigenous to the waterbody, including those species that normally migrate through the area, unless the activity's primary purpose is to impound water. All permanent and temporary crossings of waterbodies shall be suitably culverted, bridged, or otherwise designed and constructed to maintain low flows to sustain the movement of those aquatic species. If a bottomless culvert cannot be used, then the crossing should be designed and constructed to minimize adverse effects to aquatic life movements." It appears that more efforts to avoid/minimize impacts to aquatic resources need to be explored. Sincerely, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily. B.Thompsona-usace.army. mil We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.mil/customer-service-survey/ Thank you for taking the time to visit this site and complete the survey. From: Schaffer, Josephine L CIV USARMY CESAW (USA) <Josephine.L.Schaffer@usace.army.mil> On Behalf Of WashingtonNCREG Sent: Friday, June 24, 2022 9:11 AM To: Williams, Kim <Kim.Williams@davey.com> Cc: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Subject: SAW-2019-00684 (Quail Woods Village LTD/Anderson, Gerald/Craven) Good Morning, We have received your Pre -Construction Notification (PCN) NWP request for the above project and forwarded it to Emily Thompson for further processing. Thank you, Josephine Schaffer 12 From: laserfiche@ncdenr.gov <laserfiche@ncdenr.gov> Sent: Thursday, June 23, 2022 5:23 PM To: WashingtonNCREG<WashingtonNCREG@usace.army.mil> Cc: SAW-PCN-RG <SAW-PCN-RG@usace.army.mil> Subject: [Non-DoD Source] PCN - Craven - Non -DOT A new project has been received on 6/23/2022 5:21 PM for Refuge at Broad Creek. The link below will take you to the project folder. https://edocs.deg.nc.gov/Laserfiche/index.aspx?db=WaterResources#id=2384179;view=browse This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses aren't monitored. 13 R:\LandDev\Quail Woods Village LTD - Ph 3 - 2014149\CADD\_DWG\Civil\C2 EXISTING CONDITIONS PLAN.dwg-C2 EXISTING CONDITIONS PLAN; GVLUSER4;18-Oct-22 @ 2:32:44 PM • • • 11.40 11.701 EP xTA I11.59 11.59 EP TAx x 11 22 TA 10.7 x 10.8 x ALL 9,9Zfr9 N N/F CAROL LEWIS HUDSON D.B. 3217 PG. 922 M.B. 14 PG. 4 P.N. 2-015-021 N/F ✓ONA7HAN L. HORRELL & AMY M. HORRELL D.B. 3208 PG. 623 P.N. 2-075-2-081 QUAIL WOOD SUBDIVISION PHASE 1, SECTION 2 9.13 9 INV 9.26 1.1 N/F NOLAN L. & KELSEY A. CRUMMERT D.B. 3579 PG. 137 P.N. 2-015-2-080 11 WOOD DEER BLIND 12 x 17-7 x 10,8 x9.4 N/F ZACHARY D. CHENOWETH & COURTNEY R. CHENOWETH D.B. 3228 PG. 687 P.N. 2-015-2-079 EXISTING 15" CORRUGATED PLASTIC PIPE 11..5 x 10. 7 x12.4 12.6 x 136 73 4' WOOD AND WROUGHT IRON FENCE ON PROPERTY LINE )( )( xi0 7 N25 4x4'48"E 10.0 7 72.30' x IU.2 INV 8.43 x1, 9 x110 5 x 102 10 70 EXISTING 15" X. ""ON iOkETE PIPE 7 9.7, N70 43 +4 "W 60.33-Hj/NON-AUTO 10.6 R- 355.001CCESS EASEMENT 7B x 9 7 9 2 TB CLD x71- 4 72 x12.5 x 10,6 x 1n' 11 A x 11.4 x11.8 x 70.8 77 x 10.2 10 x17.4 11 x 10.2 x 10.6 x11.2 x 9.3 x 9.5 x9.7,% x10.4 I ) x9.5 • t x8.8 s x11.2f //,/ t t 5 )10.5 12.2 . //, - l�- ��-i-' x10-9 ��.-- -- D x 1l - ,7 x 9. 6 • x8- 6 A x 17.9 x 10.7 x11.6 x74-4 11.8 SPOIL PILE 15 72 73 x12 7 x9.7 7 s 10 x 12.6 s t 8, 5 � t x 13.4 x12.5 N x11.6 x 11.4 x9,2 s x 5 • EW • x 8, 6 9.9 -TB z x87 x9.7 WETLAND LIMITS x8.5 STANDING WATER - s • s 1\ x12.7 x12,8 x13.1 x 13.4 x9.6 s 85 EV' s x 9,2 x11.4 x9,6 D x9,7 x9.1 s A O -x 10.3 • s N/F DAV/D EARL ANDERSON &, LORETTA JUSTICE ANDERSON D.B. 1894 PG. 755 P.N. 2-015-083 CL DITCH 10.1 9.9 N25 "18'05 "E 7,794 72' (TOTAL) _ x10.4 B1 7' t • x8.3 x8.2 t/ / 9 WETLAND / LIMITS 10 11 - QUAIL WOODS VILLAGE, LTD. P.N. 2- 015- 024 DB 1775 PG 14 x17-7 x 12.8 13.5 x13.1 60' PERPETUAL NON-EXCLUSIVE RIGHT OF WAY AND EASEMENT 14_ -15 x11.6 ACCESS Dm vE- S2 6"ux E E 10.3 11.2 11 J ,-,-4///////// EX. BLDG N/F PAUL T. AL TIZER & IRENE AGNES MAGNESS D.B. 2980 PG. 848 P.N. 2-015-2-078 ti x 11.5 x13-6 x11.4 11- 7 QUAIL WOOD SUBDI VISION PHASE 1, SECTION 1 x 73.4 x 13.2 x157 EXISTING BERM x11.6 -L -11.3 x 10.9 N/F ALEXANDER BOGDANOFF & JENNIFER BOGDANOFF D.B. 3554 PG. 1309 P.N. 2-015-2-077 12 11.3 / N/F 11.3 x12.4 10.8 x8.7 x 9.3 16 1,6 2 x9 7 WOODED x 8.9 B2 x 8.6 xzE CLD • ZO CLD CLD GATE AND FENCE POSTS N/F CRAVEN COUNTY 9. / 5,7 x8. 7 D x9.2 • -67 -7 15 / WETLAND LIMITS / 70 / 8.3 VS 55 VICINITY MAP NOT TO SCALE B14 9.7 WETLAND 15 / x 9,7 LEGEND • • 9 B1 / x9.5 15 N/F CRAVEN COUNTY P.N.2-015-020 NOTES TB • • • • • SPOIL PILE 700 YEAR FLOOD BASED ON FIRA/1 • • • • • • • • • • • • • • • • • EXISTING CONDITIONS SURVEY FROM MAP ENTITLED BOUNDARY AND TOPOGRAPHIC SURVEY FOR QUAIL WOODS VILLAGE, LTD DATED 1/21/19 BY PATRICK HARTMAN, PLS OF RIVERS A & ASSOCIATES, INC. 2. 100 YEAR FLOOD BASED ON FIRM MAP 3720650000J EFFECTIVE DATE OF JUNE 19, 2020. BFE ELV. = 8.0 FT. (NAVD 88) .71 • • x50.0 CLD EP x50.00 TA CONTOURS BOUNDARY LINE RIGHT OF WAY ADJOINER LOT LINE TOP OF DITCH BANK/BERM CENTERLINE OF DITCH FENCE EDGE OF VEGETATION WATERMAIN 15" CPP CULVERT SOIL ACCESS RIGHT OF WAY/ACCESS EASEMEN T DRAINAGE EASEMEN ASPHALT WETLANDS NA TURAL GROUND TOP OF BANK EDGE OF PAVEMEN T TOP OF ASPHALT 50' SCALE 0 25' 50' NC License: F-0334 ;••1 0 c o Cli uJ CO, et cU East Second Street Greenville, NC 27858 (252) 752-4135 REVISIONS: >- co DESCRIPTION QUAIL WOODS VILLAGE, LTD CC 0 CC U. 111 CC CC Lti CC tO CO 0 0 0 -1 DATE: DATE: 9/13/2022 DESIGNED BY: JSJ DRAWN BY: TAN/SCB CHECKED BY: JSJ DRAWING No. W-3841 SCALE: 1"= 50' SHEET No. C2 R:\LandDev\Quail Woods Village LTD - Ph 3 - 2014149\CADD\_DWG\Civil\C3 GRADING AND DRAINAGE PLAN.dwg-C3 GRADING AND DRAINAGE PLAN; GVLUSER4;18-Oct-22 @ 2:32:52 PM 15' SWDS EASEMENT CENTERED ON PROPERTY LINE 15 REAR / SETBACK, TYP. t 10' SIDE SETBACK 10' SWDS EASEMENT CENTERED ON PROPERTY LINE / / / 10' SIDE SETBACK %/////////// jBUILDING / FOOTPRINT / / / ///////////// 30 FRONT / SETBACK R/W L-L 1_ _ _ Z�1_ EOP CL / 10' SWDS EASEMENT CENTERED ON PROPERTY LINE / / / 10 SWDS & UTILITY EASEMENT OFFSET OF R.O.W • • TYPICAL LOT LAYOUT NOT TO SCALE • \0-Q G -3 -57;:: ---z_r_ \ C- n O • vL )� \-,-Ar \2 INV --2 �9.13 EXISTING 15" CORRUGATED PLASTIC PIPE EX 6" PVC WATERLINE 6"X6" TEE 2-6" CV N/F CAROL LEWIS HUDSON D.B. 3217 PG. 922 M.B. 14 PG. 4 P.N. 2-015-021 N38° 51' 53"E 43.38' N/F ✓ONAT7-IAN L. HORRELL & AMY M. HORRELL D.B. 3208 PG. 623 P.N. 2-015-2-081 QUAIL WOOD SUBDIVISION PHASE 1, SECTION 2 x11 6 \ TA 1 11.59 .59 EP rA EP 11x.22 TA INV 9.26 1.1 0 ` INy 8.27 EXISTING 15" 0 1 f - 1 CONCRETE PIPE °. X. IRTaAT7 N 3 ItM i• EXISTING 15" CORRUGATED PLASTIC PIPE 10.7 x 10. e0 Lio Eo N 11.5 109x 4 38, N3837 N/F NOLAN L. & KELSEY A. GRUMMERT D.B. 3579 PG. 137 P.N. 2-015-2-080 0 N/F ZACHARY D. CHENOWETH & COURTNEY R. CHENOWETH D.B. 3228 PG. 687 P.N. 2-015-2-079 N25° 44' 48"E 172.30' x /0.6 7B 7 x 9.2 CLO 9.7 TB L-D N70'43 24 "W 60.33' (CH) R= 355- 00' \D ABS = ACRYLONITRILE-BUTADIENE-STYRENE BB = BOTTOM OF BANK B/B = BACK OF CURB TO BACK OF CURB BC = BACK OF CURB BFE = BASE FLOOD ELEVATION BLD = BUILDING CORNER BM = BENCH MARK BO = BLOW OFF CATV= CABLE TELEVISION BOX CB = CATCH BASIN CLD = CENTERLINE DITCH CLP = CENTERLINE PATH CLR = CENTERLINE ROD CMP = CORRUGATED METAL PIPE CO = CLEAN OUT CPP = CORRUGATED PLASTIC PIPE DA = DRAINAGE AREA DIP = DUCTILE IRON PIPE DW = DRIVEWAY EIA = EXISTING IRON AXLE EIP = EXISTING IRON PIPE EIS = EXISTING IRON STAKE ELM = ELECTRIC METER BOX ELMH= ELECTRIC MANHOLE EP = EDGE OF PAVEMENT EPKN= EXISTING PARKER KALON NAIL ERRS= EXISTING RAILROAD SPIKE FES = FLARED END SECTION FFE = FINISHED FLOOR ELEVATION FH = FIRE HYDRANT FM = FORCE MAIN FO = FIBER OPT GV = GATE VALVE GYE = GYE WIRE HDPE = HIGH -DENSITY POLYETHYLENE INV = INVERT LP = LIGHT POLE MB = MAIL BOX MBL = MINIMUM BUILDING LINE 9.7 x 10.3 18x75 1350sf 18x75 1350sf x 11.7 x 10.8 x9,4 275.40' 7 \ f 161354 1350sf 0.46 AC (20058 SF) 27x50 1350sf 0.81 AC (35378 SF) x11.8 18x75 1350sf N \ 150LF18" HP EQUALIZATION PIPE TO CONNECT WETLANDS INVERT OF PIPE 8.00 x 11.2 /" x '' &.\\ 98,97, FES-1 INV 8.50' -W/CLASS B STONE 8'X5'X18"THK- W/FILTER FABRIC \\\\ 27x50 1350sf x x11.3 \ S25° 45' 28"W 359.09' 27x50 2 41350sf 0.34 AC (15009 SF) x70.5WA7ER METER (TYP) 158.13' 27x50 WOO r 'VCK DRIVE 60' R - " BLIC - 20 PVMT x90.56AC\ (24328 SF) LIPSED HYDRANT 6"X6" TEE 2-6" GV x 11.5 S25° 48' 06"W 420:94' 20.94' 11.7 MH = MANHOLE MHW= MEAN HIGH WATER MP = METAL PIPE PH = PUMP HOUSE PP = POWER POLE PVC = POLYVINYL CHLORIDE RCP = REINFORCED CONCRETE PIPE R/W = RIGHT-OF-WAY SDMH= STORM DRAINAGE MANHOLE SIP = SET IRON PIPE SL = SHORELINE SPKN= SET PARKER KALON NAIL SRRS= SET RAILROAD SPIKE SS = SEWER SERVICE SSMH= MANHOLE SW = SIDEWALK TB = TOP OF BANK (TOPO ONLY) TLMH= TELEPHONE MH TPED= TELEPHONE PEDESTAL TRANS= ELECTRICAL TRANSFORMER TYP = TYPICAL WDL = WOODSLINE WM = WATER METER BOX WP = WETLAND POINT WV = WATER VALVE NTS = NOT TO SCALE J\r = NOT TO SCALE PEP = POLYETHYLENE PIPE = CLASS "B" STONE APRON CONSTRUCTION ENTRANCE/EXIT = LIMITS OF CONSTRUCTION = DRAINAGE EASEMENT = RIPARIAN BUFFER = SIGHT TRIANGLE = SIGN EASEMENT = CONCRETE LINED DITCH = ZONING CLASSIFICATION N/F PAUL T. AL TIZER & IRENE AGNES MAGNESS D.8. 2980 PG. 848 P.N. 2-015-2-078 EX. 6' W00D1 F,3VCE QUAIL WOOD SUBDIVISION PHASE 1, SECTION 1 x 8 6 �047 ----78 x �9.9 iY-- x9.1 181.18' 9.7 75x36 2700sf 75x36 2700sf 1.02 AC x9-6 (44525 SF) 120 LF 15 HDPE x8.5 EQUALIZATION PIPE TO -- CONNECT WETLANDS INVERT OF PIPE 8.00 6"X2" REDUCER 6"X6" TEE 2-6" GV 2" PVC C-900 WATERLINE 211.23' • 310 LF SWALE 0 .32% VAC 48 LF 18" RCP W/2-FES @ 0.63% EWE FES-2 INV. 8.20' W/CLASS B STONE / /I' x 9.5 8'X5'X18"THK W/FILTER FABRIC / 0.35 AC (15118 SF) x71.4 27x50 1350sf X6" TEE 93.81' x 12, 3 /1 6" GV -4417 6" FH 27x50 1350sf \\\\\\\\\� \ o \\\ \ \ 0.35 AC \x 12.8 (15079 SF 1 I \\\\\ \' 186.46' /////////// 735 x 7 17 / 0.40 AC (17413 SF) X6" TEL � " GV 6" FH ECLIPSED HYDRANT BLOW ASSEMBLY 13.1 84.87' 19.9 N/F ALEXANDER BOGDANOFF & JENNIFER BOGDANOFF D.B. 3554 PG. 1309 P.N. 2-015-2-077 NOTICE TO ALL LANDOWNERS/D -V / OP -RS 92.00' WETLAND LIMITS INV. SWALE 8.5 MITSAG- WETLAND FILL /// 0.35 AC (15093 SF) 27x50 1350sf x7/.1 27x50 1350sf 92A4J 27x50 13508112'7 27x50 1350sf 9, N FREDERICK M DEARMENT & SANDRA N. DEARMENT D.B. 2687 PG. 629 P N. 2-015-2-076 / WETLANDS ARE VALUABLE NATURAL RESOURCES THAT PROVIDE IMPORTANT ECOLOGICAL FUNCTIONS. BE ADVISED THAT ACTIVITIES IN WETLANDS ARE REGULATED BY THE FEDERAL GOVERNMENT UNDER SECTION 404 OF THE CLEAN WATER ACT. JURISDICTION WETLAND MAY INCLUDE THE OUNCE -SHRUB POCOSINS THAT ARE COMING IN THE REGION. IF ANY PRESENT LANDOWNER, DEVELOPER, CORPORATION , OR OTHER PERSON PROPOSES TO UNDERTAKE CONSTRUCTION/FILLING ACTIVES IN OR NEAR A LAKE, STREAM, TRIBUTARY, OR ANY OTHER UNNAMED BODY OF WATER INCLUDING ITS ADJACENT WETLANDS, FEDERAL PERMIT AUTHORIZATION MAY BE REQUIRED FORM THE U.S. ARMY CORPS OF ENGINEERS PRIOR TO COMMENCEMENT OF ANY SUCH LAND DISTURBING ACTIVITIES. PLEASE CONTACT MR. HENRY WIKER, FIELD COORDINATOR, WASHINGTON, NC CORPS OF ENGINEERS REGULATORY FIELD OFFICE, TELEPHONE (252) 975-5811, FOR A WETLAND DETERMINATION AND INFORMATION REGARDING SPECIFIC PERMIT REQUIREMENTS. CALL BEFORE YOU DIG! WWW. NC811.ORG N.C. ONE -CALL CENTER IT'S THE LAW! 50' SCALE 1 inch = 50 ft 0 25' 50' 0 N/F DAV/D EARL ANDERSON &, LORETTA JUSTICE ANDERSON D.B. 1894 PG. 755 P.N. 2-015-083 9-9 N25"18'05"E 1,194.72' (TOTAL) _ 8,5 8-6 -TBE- . ------rg x -----• --rB x - - - - \1 S25° 18' 05"W 465.09' x 9.5 ///X//// 27x50 1350sf 27x50 1350sf 4 27x50 1350sf 10,8 .2 CLD 2700sf REPAIR 170.89' x 0.76 AC (33293 SF) 75x36 2700Sf 170.57' SANDY CREEK DRIVE x 153 50' R/W - PUBLIC - 20' PVMT w 6" PVC C-900 WA - /NE x 11.3 12 1.05 AC (45767 SF) FES-8 INV. 7.50' W/CLASS B STONE 8'X5'X18"THK W/FILTER FABRIC 87 8- 3 ///e/9/5/////X x57 72 LF 18" RCP W/2-FES @ 0.72% N/F CRAVEN COUNTY D B. 2754 PG. 858 P N.2-015-020 // , - g" FES-7 // y{I � INV. 8.00' W/CLASS B STONE I �i � atir- 8' X 5' X 18" THK 1 �/rj� WATER FABRIC 171 4 ,64 D x9.2 - WETLAND LIMITS x• • 71 12.47' X6,6 1.15 AC (50202 SF) 2 C17 x1� 6 X2" REDUCER 81.55'71.1 1 /4"/FT. 6X6" TEE 6" CV 6" FH 2700sf REPAIR 0.71 AC (30901 SF) 2700sf REPAIR x 8.6 x 9.1 10.8 raaS • 60' R/W "/FT. 4 9.8 WETLAND LIMITS 8-3 0.80 AC (34636 SF) • • • • • A NOTES: /6 • 1 PAVEMENT = 1 .5" SF 9.5, 6" ABC ON ALL PUBLIC STREETS. SUBGRADE SOILS ARE Al AND A-2-7 SOIL TYPES. 2. DRIVEWAY PIPES SHALL BE HDPE WITH 15" MINIMUM DIAMETER. CAL S-RE CROSS S ic • • • • 8 • • W ASSEMBLY 5.4 x100 1800sf LPPS 8x100 LPP 27x100 2700sf N/F CRAVEN COUNTY 78 \ CO 100 YEAR FLOOD BASED ON\ FIRM CLD 7.8 0.76 AC (33257 SF) • • jCLD GENERAL NOTES • • • • • s. • • • • • • 1. ALL AREAS CALCULATED BY COORDINATE GEOMETRY. 2. A PORTION OF THIS PROPERTY IS LOCATED IN A SPECIAL FLOOD 2. HAZARDOUS AREA AS DETERMINED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY. REF: FIRM 3720650000J, DATED: JUNE 19, 2020. 100 YEAR BASE FLOOD ELEVATION = 8.0 (NAVD 1988). 3. FINISHED FLOORS SHALL BE ELEVATED TO A MINIMUM OF 2 FEET ABOVE BASE FLOOD ELEVATION. 4. THE NEAREST FIRE HYDRANT IS LOCATED 354± FEET AWAY. 5. NO POINTS SET ALONG DITCH, UNLESS OTHERWISE NOTED. 6. THE NEAREST FIRE STATION IS 2.2± MILES AWAY IN FAIRFIELD HARBOR, N.C. 7. SEWAGE DISPOSAL TO BE PROVIDED BY INDIVIDUAL LOT SEPTIC TANK SYSTEMS. 8. THIS PROPERTY IS LOCATED IN TRI-COMMUNITY FIRE DISTRICT. 9. WATER SUPPLY BY FIRST CRAVEN SANITARY DISTRICT. 10. ELECTRICAL SUPPLY BY TIDELAND EMC (UNDERGROUND). 11 . STATE STORM WATER PERMIT IS REQUIRED. 12. CRAVEN COUNTY STORM WATER PERMIT IS NOT REQUIRED. 13. ALL UTILITIES WILL BE UNDERGROUND. 14. WATER SERVICES TO BE SCHEDULE 40 PVC. 15. TRASH COLLECTION TO BE PROVIDED BY A PRIVATE CONTRACTOR. 1 6. THE CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP FOR CONSTRUCTION OF THE ROADWAY, DRAINAGE, WATER UTILITIES AND SEEDING FOR A PERIOD OF ONE YEAR FROM THE DATE OF ACCEPTANCE AND FINAL PAYMENT FROM THE OWNER. 17. OFFSITE BORROW SHALL BE FROM AN APPROVED BORROW SOURCE. 18. PROPOSED USES SHALL COMPLY WITH THE CRAVEN COUNTY ORDINANCE. 1 9. PAVED AREAS SHALL BE COMPACTED TO 95% MAXIMUM DRY DENSITY EXCEPT FOR THE TOP 6'' OF SUBGRADE WHICH SHALL BE COMPACTED TO 100% MAXIMUM DRY DENSITY IN ACCORDANCE WITH AASHTO-T99. 20. AGGREGATE BASE COURSE SHALL BE TYPE ABC CONFORMING TO DIVISION 2 OF THE NCDOT STANDARD SPECIFICATIONS. 21. BITUMINOUS CONCRETE SURFACE COURSE SHALL BE TYPE S9.5B CONFORMING TO DIVISION 2 OF THE NCDOT STANDARD SPECIFICATIONS. 22. ALL MATERIALS AND INSTALLATION METHODS OF WATER SYSTEM SHALL MEET THE MINIMUM REQUIREMENTS OF THE FIRST CRAVEN SANITARY DISTRICT MANUAL FOR THE DESIGN AND CONSTRUCTION OF WATER AND WASTE WATER SYSTEMS EXTENSIONS. 23. EACH PRIME CONTRACTOR PERFORMING EXCAVATIONS OR UNDER GROUND WORK SHALL BE RESPONSIBLE FOR THE LOCATION OF ANY EXISTING UTILITIES IN THE AREA OF THEIR WORK, NOTIFY THE UTILITY LOCATOR SERVICE (1 -800-632-4949) AT LEAST 48 HOURS PRIOR TO COMMENCING CONSTRUCTION IN ORDER THAT EXISTING UTILITIES IN THE AREA MAY BE FLAGGED AND STAKED. CONTRACTOR SHALL USE ALL CARE NECESSARY WHEN WORKING IN AREAS KNOWN OR SUSPECTED TO CONTAIN UNDERGROUND UTILITIES, INCLUDING HAND DIGGING. 24. GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING INVERT ELEVATIONS PRIOR TO CONSTRUCTION. 25. NEW AND EXISTING FIRE HYDRANTS SHOWN ON THIS PLAN HAVE OR SHALL BE INSTALLED THAT NO PORTION OF BUILDING(S) LOCATED FURTHER THAN 400' FROM THE HYDRANT AS THE HOSE IS LAID. 26. NEW HOMES MUST COMPLY WITH ALL APPLICABLE BUILDING CODES. 27. PERMITTING OF PRIVATE WATER MAINS 2" AND LARGER IS REQUIRED BY NCDENR. THE PERMIT SHALL BE IN THE NAME OF THE OWNER. WATER WILL NOT BE PROVIDED TO THE PROJECT UNTIL THE FIRST CRAVEN SANITARY DISTRICT HAS PROVIDED VERIFICATION OF FINAL APPROVAL FROM NCDENR. 15 14 13 12 11 9 8 7 6 r EXISTING CA GRADE PR oPosE CA C 150 LF 18" HP PIPE -0+25 0+00 15 14 13 12 11 10 9 8 7 6 2+00 WETLANDS CONNECTIVITY SECTIO\ A 15 14 13 12 11 9 8 7 6 PROPOSED CA GRADE EXISTING C/L GRADE 120 LF 18" HDPE PIPE 3:1 (TYP) -0+25 0+00 15 14 13 12 11 9 8 7 6 1+50 NC License: F-0334 ct) ;••1 co 0 c o 0.6 cow us) cu ss East Second Street Greenville, NC 27858 (252) 752-4135 REVISIONS: >- co Lu DESCRIPTION QUAIL WOODS VILLAGE, LTD LIJ LIJ CC 0 CC CO LIJ LI. LIJ CC CC Lti cc co cc Z J < 11. cc DATE: DATE: 10/13/2022 DESIGNED BY: JSJ DRAWN BY: TAN/SCB CHECKED BY: JSJ PROJECT No 2014149 DRAWING No. W-3841 SCALE: SHEET No. C3