Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout20221443 Ver 1_ePCN Application_20221017DWR
Division of Water Resources
Initial Review
Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
April 13, 2022 Ver 4.3
Has this project met the requirements for acceptance in to the review process?*
Yes
No
Is this project a public transportation project?*
Yes No
Change only if needed.
Pre -Filing Meeting Date Request was submitted on:
6/20/2022
BIMS # Assigned* Version#*
20221443 1
Is a payment required for this project?*
No payment required
Fee received
Fee needed - send electronic notification
Reviewing Office*
Raleigh Regional Office - (919) 791-4200
Information for Initial Review
1a. Name of project:
Kitrinos Parcel 10569 Driveway Crossing
la. Who is the Primary Contact?*
Nicholas Peter Kitrinos Jr.
What amout is owed?*
$240.00
$570.00
Select Project Reviewer*
Colleen Cohn:eads\cmcohn
lb. Primary Contact Email:* lc. Primary Contact Phone:*
pkitnnos@gmail.com (919)414-2851
Date Submitted
10/17/2022
Nearest Body of Water
Terrells Creek
Basin
Cape Fear
Water Classification
WS-V;NSW
Site Coordinates
Latitude: Longitude:
35.783262 -79.337522
A. Processing Information
County (or Counties) where the project is located:
Chatham
Is this a NCDMS Project
Yes No
Is this project a public transportation project? *
Yes No
la. Type(s) of approval sought from the Corps:
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Has this PCN previously been submitted?*
Yes
No
1 b. What type(s) of permit(s) do you wish to seek authorization?
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
lc. Has the NWP or GP number been verified by the Corps?
Yes No
Nationwide Permit (NWP) Number: 29 - Residential Developments
NWP Numbers (for multiple NWPS):
ld. Type(s) of approval sought from the DWR:
401 Water Quality Certification - Regular
Non-404 Jurisdictional General Permit
Individual 401 Water Quality Certification
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
1f. Is this an after -the -fact permit application?*
Yes No
lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1 h. Is the project located in any of NC's twenty coastal counties?
Yes No
1j. Is the project located in a designated trout watershed?
Yes No
B. Applicant Information
ld. Who is applying for the permit?
Owner Applicant (other than owner)
le. Is there an Agent/Consultant for this project?*
Yes No
2. Owner Information
2a. Name(s) on recorded deed:
KITRINOS NICHOLAS PETER JR ETUX KATHRYN MCGRATH KITRINOS
2b. Deed book and page no.:
2071/0512
2c. Contact Person:
2d. Address
Street Address
487 Fieldstone Lane
Address Line 2
City
Pittsboro
Postal /Zip Code
27312
401 Water Quality Certification - Express
Riparian Buffer Authorization
State / Province / Region
NC
Country
USA
Yes No
Yes No
2e. Telephone Number:
(919)414-2851
2f. Fax Number:
2g. Email Address: *
pkitrinos@gmail.com
3. Applicant Information (if different from owner)
3a. Name:
Karen Hall
3b. Business Name:
Biocenosis LLC
3c. Address
Street Address
124 Goldberry Lane
Address Line 2
City
Pittsboro
Postal / Zip Code
27312
3d. Telephone Number:
(919)726-0025
3f. Email Address: *
karen@biocenosis.org
4. Agent/Consultant (if applicable)
4a. Name:
Karen Hall
4b. Business Name:
Biocenosis LLC
4c. Address
Street Address
124 Goldberry Lane
Address Line 2
P.O. Box 1124
City
Pittsboro
Postal / Zip Code
27312
4d. Telephone Number:
(919)726-0025
4f. Email Address: *
karen@biocenosis.org
C. Project Information and Prior Project History
State / Province / Region
NC
Country
USA
3e. Fax Number:
State / Province / Region
NC
Country
USA
4e. Fax Number:
1. Project Information
1 b. Subdivision name:
Of appropriate)
South Wind Farm
lc. Nearest municipality / town:
Siler City
2. Project Identification
2a. Property Identification Number:
0010569
2b. Property size:
21.5
2c. Project Address
Street Address
675 SOUTHWIND RD
Address Line 2
City
Siler City
Postal / Zip Code
27344
3. Surface Waters
3a. Name of the nearest body of water to proposed project: *
Terrells Creek
3b. Water Resources Classification of nearest receiving water: *
WS-V;NSW
3c. What river basin(s) is your project located in?*
Cape Fear
3d. Please provide the 12-digit HUC in which the project is located.
030300020508
4. Project Description and History
State / Province / Region
NC
Country
USA
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
This site is a wooded 20+ acre site within the Southwind Subdivision. This is a former farm that was subdivided in 2012 into large parcels for homesites. Wetlands and streams were
delineated at the time of sub -dividing parcels; all wetlands and streams were recorded on plat map for Chatham County (see attached South Wind Farm Subdivision plat map). Currently
the site is a subdivision for single-family homes.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? *
Yes No Unknown
4f. List the total estimated acreage of all existing wetlands on the property:
0.027 acres acres
4g. List the total estimated linear feet of all existing streams on the property:
1,215 feet intermittent. No perennial streams on property.
4h. Explain the purpose of the proposed project: *
The landowner plans to build a house near the back of the lot, but needs to cross an intermittent stream to allow his driveway to connect with the house site.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: *
Grading of a driveway off of Southwind Road would occur on the parcel. Only one intermittent stream would be crossed and no other stream or wetland disturbances would occur (see
attached Site Plan detail sheets). Grading equipment to build the driveway and install a culvert would be used.
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
Yes
Comments:
No
This was done in 2012 when the subdivision was divided. Water resources were platted and are on
Chatham County GIS.
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
Preliminary Approved Not Verified Unknown N/A
Corps AID Number:
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company: Biocenosis LLC
Other:
6. Future Project Plans
6a. Is this a phased project?*
Yes No
Unknown
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
No.
D. Proposed Impacts Inventory
1. Impacts Summary
la. Where are the impacts associated with your project? (check all that apply):
Wetlands
Open Waters
3. Stream Impacts
Streams -tributaries
Pond Construction
Buffers
3a. Reason for impact (?)
3b.Impact type*
3c. Type of impact*
3d. S. name*
3e. Stream Type*
(,)
3f. Type of
Jurisdiction*
3g. S. width
3h. Impact
length*
S1
Driveway culvert crossing
Permanent
Culvert
Unnamed tributary
Intermittent
Both
6
Average (feet)
68
(linear feet)
3i. Total jurisdictional ditch impact in square feet:
0
3i. Total permanent stream impacts:
68
3i. Total stream and ditch impacts:
68
3j. Comments:
See attached Site Plan detail sheets for intermittent stream crossing details.
E. Impact Justification and Mitigation
3i. Total temporary stream impacts:
0
U
1. Avoidance and Minimization
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Owner originally wanted to locate driveway in area where two intermittent streams would have to be crossed. To avoid a second stream crossing, we
relocated the driveway to an area where only one stream would require a culvert crossing.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
We minimized stream impacts during this culvert design by crossing the stream and buffer at a ninety -degree angle. We also used a shorter 20-foot
culvert length in conjunction with flared end sections to reduce the length of culvert and transition area needed. We used a scour pool energy dissipater
for a more natural approach and a larger culvert size to reduce culvert velocity.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
Yes No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
It falls below the impact area size threshold.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
Yes No
If no, explain why:
This project is not within one of the NC protected riparian buffer areas. It is subject to Chatham County buffer ordinances, however. Those are being addressed with county permits.
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
Yes No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
Yes No
Comments:
See attached Site Plan detail sheets for erosion control specifications for culvert installation.
G. Supplementary Information
1. Environmental Documentation
la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? *
Yes No
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)?*
Yes No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?*
Yes No
3b. If you answered "no," provide a short narrative description.
This is a single family home that is being built on this individual landowner's lot. No future development on this single -owner lot is anticipated.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
Yes No N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
Yes No
5d. Is another Federal agency involved?*
Yes
5e. Is this a DOT project located within Division's 1-8?
Yes No
No Unknown
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
Yes No
5g. Does this project involve bridge maintenance or removal?
Yes No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
Yes No
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
Yes No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
Critical Habitat for Threatened & Endangered Species [USFWS] GIS data
USFWS Eastern North Carolina Ecological Services GIS database
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
Yes No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? *
NOAA Fisheries essential fish habitat mapper
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
NC SHPO GIS databases
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
Yes No
8c. What source(s) did you use to make the floodplain determination?*
Chatham County GIS FEMA map layers
Miscellaneous
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when
possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach document
401 Buffer Pre -filing Meeting Request receipt 6-20-2022.pdf
Kitrinos Parcel 10569 Driveway Crossing cover letter and attachments 10-17-2022.pdf
File must be PDF or KMZ
Comments
Please contact Karen Hall at 919-726-0025 or karen@biocenosis.org with technical questions.
Signature
141.53KB
4.89MB
By checking the box and signing below, I certify that:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
I intend to electronically sign and submit the PCN form.
Full Name:
Karen Hall
Signature
Date
10/17/2022
6/20/22, 10:57 AM Biocenosis Mail - Automatic reply: [External] 401/Buffer Pre -filing Meeting Request
Mm i l Karen Hall <khall@blocenosls.org>
Automatic reply: [External] 401/Buffer Pre -filing Meeting Request
1 message
401 PreF[le <401 PreFile@ncdenr.gov>
To: Karen Hall <khall@biocenosis.org>
Mon, Jun 20, 2022 at 10:56 AM
This email confirms receipt of your pre -filing meeting request. Please retain this email for your records and
submit this documentation as part of your 401 application (PCN Application) as required by federal law.
DWR will not be able to accept your application without this federally required documentation. 401
applications received without documentation that a pre -filing meeting request was submitted at least 30
days prior will be returned as incomplete.
Responses to this email are not monitored.
Background
On April 6, 2022, the United States Supreme Court issued an order staying a lower court's vacatur of the
Trump Administration's 2020 "Clean Water Act Section 401 Certification Rule" ("Federal Rule"). As a
result of the United States Supreme Court order, the Trump Administration's Federal Rule has sprung back
into effect.
The Trump Administration's Federal Rule imposes additional procedural requirements on applicants for 401
Certifications and on DWR's processing of those applications. One requirement is that 401 applicants must
request a pre -filing meeting request at least 30 days prior to submitting their 401 application. [40 C.F.R.
§121.4] In turn, the Federal Rule requires that applicants include documentation of their pre -filing meeting
request in their 401 Certification application. [40 C.F.R §121.1; 40 C.F.R. §121.5]. Please refer to
the Federal Rule for more information.
Per 40 CFR §121 and §121.5, a 401 Certification application that does not include the required pre -filing
meeting request documentation does not constitute a "certification request." As a result of the
reinstatement of the Trump Administration's Federal Rule, all 401 applications received after April 6, 2022
that do not have documentation that a pre -filing meeting request was submitted at least 30 days prior to
submittal of a 401 Certification application will be returned as incomplete.
If you need to contact 401/Buffer Permitting Staff, please use the following link(s) to access of staff contact
list(s).
For Non -Transportation Central Staff:
hftps://deq.nc.gov/about/divisions/water-resources/water-quality-permifting/401 -buffer-
permitting/401 -buffer-permitting-contacts
For Non -Transportation Regional Staff: https:Hedocs.deq.nc.gov/WaterResources/DocView.aspx?
dbid=0&id=2162034&cr=1
For all Transportation Projects Including NCDOT Projects:
https://deq. nc.gov/about/divisions/water-resources/water-resources-permits/transportation-
pe rm itti n g/staff-contacts
https://mail.google.com/mail/u/0/?ik=1 bea71091 &view=pt&search=all&permthid=thread-f%3A1736166063295251721 &simpl=msg-f%3A1736166063... 1/2
6/20/22, 10:57 AM Biocenosis Mail - Automatic reply: [External] 401/Buffer Pre -filing Meeting Request
https://mail.google.com/mail/u/0/?ik=1 bea714b91 &view=pt&search=all&permthid=thread-f%3A1736166063295251721 &simpl=msg-f%3A1736166063... 2/2
124 Goldberry Lane . Pittsboro, NC 27312 . (919) 726-0025 . www.biocenosis.org
BIOCEN0SIS
October 17, 2022
To whom it may concern,
Please see attached documentation for 401/404 permitting for the PCN submission for the
Kitrinos Parcel 10569 Driveway Crossing located in Siler City, NC. The following
attachments include:
1. 1:24,000 USGS Topographic Map project area.
2. South Wind Farm Development plat map with vicinity map.
3. Enlarged plat map details of subject parcel 10569 with pre-existing conditions,
including jurisdictional streams and wetlands.
4. Site Plan details with site layout, culvert grading, and culvert erosion control.
Please contact Karen Hall at 919-726-0025 or karen2biocenosis.org with questions
regarding this submission.
Thank you.
0,, 4,.- N0_u , i�k. 0.
Karen Hall, Ph.D.
Principal, Senior Ecologist
Promoting community stewardship of our natural resources.
Project Area: Parcel 10569 in Chatham County
N
W E
S
840
Feet
Parcel 10569
a•
USGS The National Map: National Boundaries Dataset, 3DEP Elevation
Program, Geographic Names Information System, National Hydrography
Dataset, National Land Cover Database, National Structures Dataset, and
National Transportation Dataset; USGS Global Ecosystems; U.S. Census
Bureau TIGER/Line data; USFS Road Data; Natural Earth Data; U.S.
Department of State Humanitarian Information Unit; and NOAA National
Centers for Environmental Information, U.S. Coastal Relief Model. Data
refreshed June, 2022.
,i/
B10CENO515
VICINITY MAP
111{
gSrxeOE
- 2
4 - ?
_
2eENfl�
w
6W4t'39' E
x 06'25•
82.]9'
81
81.aT
�.
10- 11
o. E
xee
191.13'
11 12
n B136'04' E
S OB'1936' E
Yr..41'
S OW19'38' E
.
'-we,
•
�1 '
21 - 22
22 - 21
S OE19'W E
T -11" E
.11
ISI.OS
23 - 21
5 OE19'38• E
24 - 25
S OW19'38' E
21,33'
131.3]'
29 20
9 Ba00'l1: W
6a0p'1{' W
4.e11'
13 - 11]
5'12'2]' E
-l'
'
II]
11a - 119
IT1 N'
N IT TN' E
1. - "1
x 71 1'34' E
39.n1'
99 -
114 - 145
N O6.21'M
1, 89'ot'41,4t' W
285.88'
ISe-52'
Ib -
63 - 1NA
5 B401'1" E
'
1{6 - 122
S 89'01Y1" E125
104.80'
- 12J
-
126
S 89'51'49- E
T 69'St'49• E
63.69'
99-IS'
126 -
118 - t27
S 89'51'a9" E
x 34'S5'S9' tP
32.21'
27 - 125
128 - 38
N Sw21:11: W
x ]5..-
3111'
1,S
eW59'IS E
J4.15'
lag -
131 - 141
BB59'43' E
S BB'S9'12' E
2]0.52'
217.6}'
110 - 24
21•Se'31• E
x ef1B'2t' E
160.25'
t
132 - 47
14]
W SWOI.41' W
]1.1"W W
12L.42'
33.19'
5 25.11'31• w
1-,
ISS - 1J5
- t1
S SZ14'0a' w
T OT33'13• E
69.9p'
141.58'
13]
137 - 77
5 41'05'32" E
5 a1'Op'J3• E
69.39'
250.14'
92 - 83
96'J6JO" W
9 89.32•SS W
5 B 12Y W
63.19'
Js.4B'
I56b'
1be) < n6, 1ne[e �a.n fxpnv,v) uuv�rU]
�In �praprr,y alwwn ora eucreee
w•x�+7 =� m
o.nw ry_ vm_
6
xre 9ET N�E[W19M��J/' eY I� ��J�xl'
I� ory^ it
II �l
SI
I
Yr� O
21.500 Ao,
a�Pin
it
Buw
r
95 - 98 9 0218'05' W 6e.4J'
96 - 97 '• 72.05'
0-
3 f �ervl 1 rl
,n
W
-ICI 5 -4'4- ]]9
223'
u 9-
•
V�/
a
B9 - I11 x 9e21'09- ww 30.7J'
e
lag - 91 N 66IS14• Er 252.9f
t31 - S s'14' E 37.00'
pe
r
2 W
1 - 200 x 95'S2'04• w 61.e5'(l'm)
132 - In S W24'1� E 7B.1 x'
n
! z
41
141 - 179 N 21.58.31• E 225.34'
>o
\9 68'S8'Se' E
1
c
1Y Xaat AOPxo
642.00 \
67/.B]' txWl J2.)
.1pp I. 161a1 Ow[
RxxNU
9nwra
wne' wep.[ cPOr4W
Y
\
4ap1i cRa,IW mxYN1[
i/ ' IROaI P[ I-x
NAl
1/i• War N
3/a' Ww YwE
I[,�P
io I/z• wPN np1
N M 1/x' X1a1 Nrc PIP[
m z1 I/x• N5N
4
M z3 t/z• W.ON 21if
�i:
�i
O
Iw�r1 _
2.
;- pn,°`E
- /xwE ua,w
27.336 Ac.
oil!
,2x- XNW N.[
1R N 3/1 YNiI PPR.[ . APdT 6XOVW
w eW.
r�s w 3%4' nei1 FH s' +Bpr[ 4W0069
FS 9]
y-!>
42- WOx nR
M 3/f �RPrt
[a^ \. EawmWB
�r5
I• • 6Nx.n
aP 112 Ul- me
s 7W0�[ bPIArP
/ l� a
�13 iy ��44dn Pn[� 4 x10W raa,80
_ i6w , !'� : ��___� -- �✓
EM 8 ie 0.11' mN al My prvparty rine. Y'\
bP > Iv O10' eat al Ra p
.a OJO' wet al My prvpeay fine. £
u' roN ar 1nv wepartY env. \
©P 22 . 9ee .e, a I Prapmy 6.a.
.1 29 w .13 4PN1, W aM P-Pt, Fa
Panty 13I4-�T. M1ax 4s 147 18 ma 1. as
Pain I12 NM�]a.ie i13e S8•ve °6B. To - n, 11: 1fix.
pmea - 1W, a� - 11 19, 1m. 1N, one Ia5 an J/Y M
Poe ,W I' ehme
rm4 Ix6 - 1LtQ 114, aM 113 an I' wen ,a 1' vtom qoW
♦ a1w en 3/e I/z'IR�ebe�mt zN1A °rpiie.
oenb G w 4 J�. Eun L vu ramPm.e pvl.M uur-
m�i,p
.,. u..,r- En.. aemn� .a.W. ,'• AWEn "�
. aP.e -_ 4ua,z3a wc.
m.W wn e n aNaP,m Na n9w1_ w,a a Ma J4 � r f/
W
dame P ua.y°�.ImeL �, -
/l41
A4 e� DETAIL -A-
SOUTH TGRWIND FARM
1lnp- To Ip c- coo . N.G.
a R: EPIC G. ROSEN, I-EY E 5411H
3 �SOUM WINO R
x. C- 21 2]}µ
200 100 0 200 40p 600
90A1E: 1' = 200' WY 22. 2012
VAN R. FINCH - LAND SURVEYS, P.A.
109 Hillsboro St. Pittsboro , N.C. 27312
FWN IlCENSE K-513
I � 1
I
L felrrr�1
�wanrby � \I
..e IFuvvrnO '
\3.423 Ac.�
1 1
AW inE 30BVrE4Dx 8flallA
Iw.6. anna 1r maa.b ,xa.n
v ®rrgl Brun eM Subdi.zim• RprMbru
x many M ee8n
YY9nu. a3 we..
llf %�tfii
aru:lu w Rxsrme..
Mr4<sn sa/w Hmxeaan a M laeaaa aNan w Wn
PE.wPa! sous M' .. ..�.a zzcl xqM
anbv fay Y.al� e�{Rale[m
MAP LEGEND
EX6nHG IRON PIPE
EXISTING MN S[AHE
EXPE SET
ISTING CONCRflE I-U4EN
EXISTING ML
ONCRETE NIL SET
POWER pIXE
v ap.1PUlEp POIM
FENCE
® 30' POWER LNE F/SENEm
a a..u•
.Nrn w.� x41.
South wind Road
' -
60'
Privote Easement
UNE
n_
GISfANCE
Septic Easement a Lat 4
(ShOded Area)
m
_ 322
31 -
003z3a' E
N 38'OB'29• W
71.w.
Z3AX
UNE B.NNc -E
°'•
A
J/ - 36
IN7216'1r W
N ST02'OB' w
N'/3'24- 11
31.2r
J9.6}'
2].14'
R X
G
PSYts
x14. N
6/.01'
11
36 - 31
N OS'13'40• E
5W�'
G-
3Z'g'S5• IX
'yfi-
27.N'
Wr5Tw• E E
73'W'00'
4-'
!9 - b
N 6 W
}10'
19He21'
4p _ 41
41 - 42
1.1"
n BS2W..w' W
N 54'41'2]" W
W.67'
rFN1ERFWE
NURSES IN 15' SWPEv
W
IWE ESLI.
11499'
`sue.
42 _ 43
N 423731" W
61.38'
'
N-
N 48'tTN' W
s3woe' W
n.21'
14.10'
b_♦
_
N 322]'5]- W
N N'4)'v' w
'2132"
• E
32&a5' tw)
� _ 4'
_
2 W
N 1121'19' w
65 39'
5 0e21'1]' E
]W.OB' tBr)
4)
b
I]'OT' w
33A2'
49 - SD
50 - sa
N 1Z501#i E
9'13• E
N a', T51' E
m-
3551-
- SZ
ry 6wa2'S6• E
200.9i
17].93'
-
S• - %
N BTSB'O6- E
9 E
55 - 56
We9,18•
N a9'S9'Ia- E
elm,
56 - 57
- EH1
x BZ"W E
x 7S3Y51• E
-12"
SSIY
�]
N'0M. E
Sa56'30
{0.45'
BD - 61
N IWOB'/6' E
38-1T
Bt - 6
61A - 62
N 39'b'30- E
N 3Wb'80• E
22-19'
1.52'
62 - e3
N 1Z2J'b' E
41.54
4
-
'39W •
BS - e
N 3/'18'02' W
6 - 8'
66 - 67
X IB'w'3e' W
13B.T5'
67 - I]0
130 - b
n 2T32'P' w
N 2TJ2'2]- W
140.42'
65.05'
W.. - •
66 - 129
N 36'0 'W
95.18'
/ ! '�
I. - 6
N 25Y1'02• W
IM N'
1' /11[170.£ .10[ Oox+xs
b
1 r
69 - >0
70 - 71
]2
N 2Z/3'37' w
N I Z04'S{' W
N Oa35'/9" E
82.96'
43.BT
]].93'
73 - ]4
W24'42' E
N 1841'S8" E
36.15'
J6aT
]4 - ]3
N E
30.87'
9 Jo'brr N
]5 - 76
W32'0]'
N 3Y33'28' E
SS.]]'
r Ip ] 1r! - WOt
O rb' mWNVE EJ' aBwE cW2vlo) _ _ _ -
Ej N em A -
6 - ]]
71 - 76
7e - 79
78 - BO
N ST56h 1' E
N 4511 - E
N 55't l'Oe• E
N BI.43'ta' E
119.38'
4].]3'
120.30'
H 59'36'l l" F
21J5'
11.650 AC. I? i� lx.a+a-'u g,
X= x
IJe - 6�
91 - 62
63 - eJ
N e4'23'21' E
N /Y17'46' C
9-1:
na9'
94
84
65 - 86
N Oa0.1'0]' f
W1.31'
SEE OETAR 'W'
67 -
87 Ba
Of39Or 3'2' w
N 2' Yx
92.25'
97.65'
A v{
90
E
N 18•]T'N' E
I9J.N'
83.21'
�'
31
N e4.42'J5' W
{b.2J'(IIP)
O\ t' F O a tir
30'
IINE
Private Eosement
OW'I.
06ENIOE
tt944. !
\ rE x'�
7a\
e/ - ISe
N 85'/0'15' f
36,33'
u 10.765 AC.
150 - 151
m1 - Isz
N 7736'50' E
x 6e28'N' E
a."'
n5x'
rA
\6 M 4`0�'W 9^1'^"-e �.b•
152 - IS]
S 7B't l'Op• E
51,49'
5 �51'49- E
- W b9.b' 126-26
10.]
154 - 153
E
S SW14']0• E
19.22'
JO.2B'
Ear
117
15J - 158
N b'E
3p.19'
xvrya ew1
I56 - 159
N ]WWN" 1B'32' [
2698'
`��
160
H 39'41'57' E
.J918'
s0'r6Xm%m+BrYAr.
160 - t6t
162
46'02' E
N 11'2""- E
-Oe'
10.23'
1e rL:�
183
183
x Ia20'45• E
0.14'
rn
;
- I64
- 165
144
N 26'03'01• E
N 41-01.42• E
x Sa09'40• E
]0.06'
SS.TI'
I
�8]
30' Waerwn drYNr
m`\`ss X
- 1N
18e - 18y
x 4531'b• E
N 34.13'04'
l4.15'
-
Sdd
gtp55
IWI - t
x 06.59'09• E
2394'
f ,� g
•5e t >
I)1 - 1]2
N OY2W'51' w
N 12'43'IB'
JO.OB'
6yN� 90' x1KW sn gI73
1 �errw
I�3 1]4
W
x /a}z'59' w
33BR'
5W
1n
N 0e• W
3289'
t78
I78 - 179
IT 8,
x 70'!9'58' W
9 ee'IB'26' W
3T.88'
36.05'
b58 26ea I-t
l- 1'
SS 2E55'44.20'01a7• EE
.77'3].4536
'
14.574 Ac.
'-�
cwu4uxm Arww -A- '•--� � R^^^' �
Community Area •B•
b\ TEE OEEAI 'A' O\f zr i
LOE
BENBNC- 651
�E
r �>�=
n mS 21.236 ACAS �l `�J 3
100 - IOwZ
101 -
- 103
S 09' W
5 536'18• w
S 4529'a5- W
59.
3.53'
51 95'
S.R. "� e4'Iz•as-r
1346
92J[ Ayppg - GOIW s 6O csR o. a
G � zzxp.x
INsm0l.Exr y�y m4t .� O
9r'ErtXl91E
Iw - 101
5 63N'20• W
41�84'
as
a1.d�p
1� - 108
39'Or W
288'
141.A.
S 6�- vs. awP-17J
- 10]
N J44]'1W
51•J631- r
I-
229.99'
- _ _ �,�
148 - 1
N 7r16•Ir w
i.wse'
112
113
N 1a19'SB'
a-W
N ar41'19' E
I]AT
1141 - 11`
N e[r52'11' E
�MERLr2 OF 30' Pfa7A1E EASEMENT
114 - 99
S 71'{1'46' E
241.31'
ACC65 Tp CONYYNztt A21rA A
53'2T.IE 00.79'
99 - 115
115 - 116
5 51•p5' 1' f
S 6SN'19' E
T0.]3'
2S1.]O'
118 - IW
S 4Tp1'49 E
90.3Y
O
DETAIL mB-
tE 45• waterline E-menl an Lot 5
7.5' E«h Sid,
1111E BCAfi1G q9 -E
- N N 2i5e'31- E 21426'(.)
NOTES
' rrrvTew.rs:�er ,tyro "io°n 5, Nv. 3.r..,.r w.r.m
5 1n«. w NCCT mwmn.niv rw..d .x1w 3000 rez
ramya a�5/ rrn) � ()) W stye e/ b slormwbe
ry es mRe�l w wvy r.vueae :., ear sxd. z01}-pr n
Fl,P. r2
nn.e tea. E:2, ea9. _-
10 ill 12 tt
Fence
6. s
S, ElP
ce SS,
94 l y lPS 93
O
cue •,SASS, j0 3 w /1' V
Kok
13
m 6 ('133 n
Z
co O(I
21.500 Ac.
50' Riparian
lPS Buffer
p 50' Riparian /ps 134
Buffer .135 '
I.
Wetland 50' Wetland
( Buffer
136,.
j 30' Riparian
Buffer
('D EP 50' Wetland t /80
9 Buffer
/PS f / 79'�
UD m o 137 7$
v Z Ephemeral r p rr 77
Stream r
Q D 7
50' Wetland �
<a Buffer 75 60' Private
10 p / 74
L
� O � i' � � 73
� 72 L
t,r = % = i
Wetland / \Fo , t 71
70
11.65
69
1�
30' pArian =A
Buu ffer 13
1" IPS g //' �''
4" ABOVE GROUND S 88 56 58 E '� 143
642.00' n L, �,: 129
L�a pmm�e 0 C)
rr ?
bb£LZ HNI� JVO HlaON 'AlIO aE�IS p Q
3W�� aHOa aNIM H1f10S SL9 poo a ~
30N30IS32J SONPJiN p o _
ViVV op S d U)
-
�-
o oo - -- _
12
-
-
- F Q moo omoa
oow� u _ o_,N
Lu
o
a
- H
- B
m
iN o ro �l
T1I1I Or -_ `.... Q F 0 ¢ 955 - O LL
- -
U
o���� 1
x�
o Qom _ zocs�_
�ooawma
i— ---- -
- a
� w
o
o
— F
`l�\4Az, �h>`� •y F, r;-,'-`. _ _ _ lF `, �),` �'-
;�//�' O IS
L -
Ln
i,
o
a hm,�
�zo
�LU:3 O Cieg o bb£LZ HNI�OaHO HlaON 'AlIO a3�IS w
duo - GVOa GNIM Hinos SL9 p� a J O z Q N
��� o
w 30N30IS32J SONPJiN `w� w o 0
VIV0 p o
0 0 q2
�gg
4�
v '-o
a s
a
VQ C� W o� W
a
o -d N o
osita H
x
61
dk _ow-►
o u oV
5 o-r Flow -- W
w 'z.[E o ,.
oz
J `I I� 3 r,,
V [�
rc o rc 5 L
o<0z�
zw
�' a N LL ggo � tl o
mw f �J
HE
q
w
�ygy
R
wn
o