Loading...
HomeMy WebLinkAboutGW1-2022-09524_Well Construction - GW1_20221017 WELL CONSTRUCTION RECORD For Internal Use ONLY: This form can be used For single or multiple wells I 1.Well Contractor Information: GARRETT CLYDE BANKS F4.WATER.110 RO\I 1'O DESCRIPTION Well Contractor Name ft. ft. 4519-A ft. ft. NC Well Contractor Certification Number 15.OUTER CASING(far multi-cased wells)OR LINER(if a ficable . FROM TO DIAMETER THICKNESS MATERIAL CLYDE SAWYERS & SON WELL & PUMP INC +1 fc. 101 it 6 1/8 i #21 1 PVC Company Name 16.INNER CASING OR TUBING(geothermal closed-too MCM-309W FROM TO DIAMETER THICKNESS MATERIAL 2.Well Construction Permit#: ft. ft. I in. List all applicable nrll permits(i.e.Count),,State. Variance,hyeetion,etc.) ft. ft. in. 3.Well Use(check well use): 17.SCREEN Water Supply Well: FROM TO DIAMETER SLOTSIZF THICKNESS MATERIAL ft. ft.❑Agricultural ❑Municipal/Public in. ❑Geothemlal(Heating/Cooling Supply) El Residential Water Supply(single) ft. ft. in. ❑itI(ILIstrial/Commercial ❑Residential Water Supply(shared) 18.GROUT - FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT ❑irrigation 0 ft. 20 ft• Bentonite Pumped Non-Water Supply Well: ft. ft. ❑Monitoring ❑Recovery Injection Well: ft. ft. ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK if applicable) ❑Aquifer Storage and Recovery ❑ FROM TO MATERIAL EMPLACEMENT METHOD Salinity Barrier ft. tt. ❑Aquifer Test ❑Stonnwater Drainage ft. ft. ❑Experimental Technology ❑Subsidence Control 20.DRILLING LOG(attach additional sheets if necessar ❑Geothermal(Closed Loop) ❑Tracer FROM TO DESCRIPTION(color,hardness,soil/rock type,grain size,etc. ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) 0 it 101 ft. OVER BURDEN 9-19-2022 101 ft 425 ft GRANITE 4.Date Well(s)Completed: Well ID# ft. it. 5a.Well Location: Jeremy Chambers Facility/Owner Name Facility iD#(ifapplicable) tt. tt. Pressley Road Canton, NC 28716 OCT - Plhvsical Address,City,and Zip 21.REMARKS Haywood 8566-25-6779 7;,�, County Parcel Identification No.(PIN) nb.Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22.Certification: (il'well field,one tat/long is sufficient) -A N w Signat 9-26-2022 ure of Cerit Well Contractor Dale 6.Is(are)the well(s): OPermanent or ❑Temporary Br signing this fortn,I herebv certify that the wells)was(were)constructed in accordance with 15A NCAC 02C.0h00 or 15.4 NCAC 02C.0200 lVell Construction Standards and that a 7.Is this a repair to an existing well: ❑Yes or ONo copy of 1his record has been provided to the well owner. /l this•is a repair,fill not known well construction injormalion and explain the:nature oJ7he repair under#21 remarks section or of the back o/'thisform, 23.Site diagram or additional well details: You may use the back of this page-to provide additional well site details or well 8.Number of wells constructed: construction details. You may also attach additional pages ifnecessary. For multiple injection or non-Crater supple wells ONLY with the sante construction,you can submit onefinn. SUBMITTAL INSTUCTIONS 9.'fotal well depth below land surface:425 (ft.) 24a. For All Wells: Submit this form within 30 days of completion of well For nuthiple n•ells list all depths ffdiftrent(example-3@200'and 2@100') construction to the following: 10.Static water level below top of casing: 60 (ft.) Division of Water Resources,Information Processing Unit, Ijtraler level is above erasing,use'•+" 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: 6.25 (in.) 24b.For Iniection Wells ONLY:i in addition to sending the form to the address in ROTARY 24a above, also submit a copy of this form within 30 days of completion of well 12.Well construction method: construction to the following: (i.e.auger,rotary,cable,direct push,etc.) Division of Water Resources,'Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield(gpm) 3 Method of test: RIG 24c.For Water Supply&Injection Wells: PILLS Also submit one copy of this form within 30 days of completion of 13b.Disinfection type: Amount: 35 well construction to the county health department of the county where constructed. Form UW-I North Carolina Department of Environment and Natural Resources-Division of Water Resources Revised August 2013