Loading...
HomeMy WebLinkAbout20151246_Scoping Comments_20140306NCDENR North Carolina Department of Environment and Natural Resources Division of Water Resources Water Quality Programs Pat McCrory Thomas A. Reeder John E. S alt III Governor Director Secretary March 6, 2014 MEMORANDUM To: - Lyn Hardison, Environmental Coordinator, Office of Legislative and Intergovernmental Affairs From: Rob Ridings, Division of Water Resources, Transportation Permitting Unit XT Subject: Comments on -the Environmental Assessment for proposed replacement of Bridges 227 & 213 at US 401 & 70 Interchanges, Wake County, Federal Aid Project No. BRNHS- 0070(119) & BRSTP- 0070(149), State Project No. 42263.1.1, TIP #B -5121 & B -5317, State Clearinghouse Project No. 14 -0337. This office has reviewed the referenced document received February 27, 2014. The NC Division of Water Resources (NCDWR) is responsible for the issuance of the Section 401 Water Quality Certification for activities,that impact Waters of the U.S., including wetlands. It is our understanding that the project as presented may result in impacts to jurisdictional wetlands, streams and /or buffers. The NCDWR offers the following comments based on review of the aforementioned document: Project Specific Comments: (if applicable) Two streams are found in the project study area: Pigeon House Branch and Williamson Branch. These streams are both C; NSW waters of the State. The NCDWR is very concerned with sediment and erosion impacts that could result from this project. The NCDWR recommends that highly protective sediment and erosion control BMPs be implemented to reduce the risk of nutrient runoff to these waters. The NCDWR requests that road design plans provide treatment of the storm water runoff through best management practices as detailed in the most recent version of NCDWR's Stormwater Best Management Practices. Pigeon House Branch is on the 303(d) list of impaired waters. The NCDWR is very concerned with sediment and erosion impacts that could result from this project. The NCDWR recommends that the most protective sediment and erosion control BMPs be implemented in accordance with Design Standards in Sensitive Watersheds (I 5A NCAC 04B .0124) to reduce the risk of further impairment to Pigeon House Branch. The NCDWR requests that road design plans provide treatment of the storm water runoff through best management practices as detailed in the m6st recent version of NCDWR Stormwater Best Management Practices. Transportation and Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699 -1650 Location- 512 N Salisbury St. Raleigh, North Carolina 27604 Phone: 919 -807 -63001 FAX- 919 - 733 -1290 Internet, www.ncwaterguality.org An Equal Opportunity 1 Affirmative Action Employer NorthCarolina Aaturally 3. This project is within the Neuse River Basin. Riparian buffer impacts shall be avoided and minimized to the greatest extent possible pursuant to 15A NCAC 213.0233. New development activities located in the protected 50 -foot wide riparian areas within the basin shall be limited to "uses" identified within and constructed in accordance with 15A NCAC 213.0233. Buffer mitigation may be required for buffer impacts resulting from activities classified as "allowable with mitigation" within the "Table of Uses" section of the Buffer Rules or require a variance under the Buffer Rules. A buffer mitigation plan, including use of the NC Ecosystem Enhancement Program, must be provided to the NCDWR prior to approval of the Water Quality Certification. Buffer mitigation may be required for buffer impacts resulting from activities classified as "allowable with mitigation" within the "Table of Uses" section of the Buffer Rules or require a variance under the Buffer Rules. A buffer mitigation plan, including use of the NC Ecosystem Enhancement Program, must be provided to the NCDWR prior to approval of the Water Quality Certification. General Comments: 1. The environmental document should provide a detailed and itemized presentation of the proposed impacts to wetlands and streams with corresponding mapping. If mitigation is necessary as required by 15A NCAC 21-1.0506(h), it is preferable to present a conceptual (if not finalized) mitigation plan with the environmental documentation. Appropriate mitigation plans will be required prior to issuance of a 401 Water Quality Certification. 2. Environmental impact statement alternatives shall consider design criteria that reduce the impacts to streams and wetlands from storm water runoff. These alternatives shall include road designs that allow for treatment of the storm water runoff through best management practices as detailed in the most recent version of the NCDWR's Stormwater Best Management Practices Manual, July 2007, such as grassed swales, buffer areas, preformed scour holes, retention basins, etc. After the selection of the preferred alternative and prior to an issuance of the 401 Water Quality Certification, the NCDOT is respectfully reminded that they will need to demonstrate the avoidance and minimization of impacts to wetlands (and streams) to the maximum extent practical. In accordance with the Environmental Management Commission's Rules (15A NCAC 2H.0506[h]), mitigation will be required for impacts of greater than 1 acre to wetlands. In the event that mitigation is required, the mitigation plan shall be designed to replace appropriate lost functions and values. The NC Ecosystem Enhancement Program may be available for use as wetland mitigation. 4. In accordance with the Environmental Management Commission's Rules (15A NCAC 2H.0506[h]), mitigation will be required for impacts of greater than 150 linear feet to any single stream. In the event that mitigation is required, the mitigation plan shall be designed to replace appropriate lost functions and values. The NC Ecosystem Enhancement Program may be available for use as stream mitigation. 5. Future documentation, including the 401 Water Quality Certification Application, shall continue to include an itemized listing of the proposed wetland and stream impacts with corresponding mapping. 6. The NCDWR is very concerned with sediment and erosion impacts that could result from this project. The NCDOT shall address these concerns by describing the potential impacts that may occur to the aquatic environments and any mitigating factors that would reduce the impacts. :y 7. An analysis of cumulative and secondary impacts anticipated as a result of this project is required. The type and detail of analysis shall conform to the NC Division of Water Resources Policy on the assessment of secondary and cumulative impacts dated April 10, 2004. 8. ' The NCDOT is respectfully reminded that all impacts, including but not limited to, bridging, fill, L excavation and clearing, and rip rap to jurisdictional wetlands, streams, and riparian buffers need to be included in the final impact calculations. These impacts, in addition to any construction impacts, temporary or otherwise, also need to be included as part of the 401 Water Quality Certification Application. 9. Where streams must be crossed, the NCDWR prefers bridges be used in lieu of culverts. However, we realize that economic considerations often require the use of culverts. Please be advised that culverts should be countersunk to allow unimpeded passage by fish and other aquatic organisms. Moreover, in areas where high quality wetlands or streams are impacted, a bridge may prove preferable. When applicable, the NCDOT should not install the bridge bents in the creek, to the maximum extent practicable. 10. Whenever possible, the NCDWR prefers spanning structures. Spanning structures usually do not require work within the stream or grubbing of the streambanks and do not require stream channel realignment. The horizontal and vertical clearances provided by bridges shall allow for human and wildlife passage beneath the structure. Fish passage and navigation by canoeists and boaters shall not be blocked. Bridge supports (bents) should n6t be placed in the stream when possible. 1 L Bridge deck drains shall not discharge directly into the stream. Stormwater shall be directed across the bridge and pre- treated through site- appropriate means (grassed swales, pre - formed scour holes, vegetated buffers, etc.) before entering the stream. Please refer to the most current version of NCDWR's Stormwater Best Management Practices. 12. Sediment and erosion control measures should not be placed in wetlands or streams. 13. Borrow /waste areas should avoid wetlands to the maximum extent practical. Impacts to wetlands in borrow /waste areas will need to be presented in the 401 Water Quality Certification and could precipitate compensatory mitigation. 14. The 401 Water Quality Certification application will need to specifically address the proposed methods for stormwater management. More specifically, stormwater shall not be permitted to discharge directly into streams or surface waters. 15. Based on the information presented in the document, the magnitude of impacts to wetlands and streams may require Nationwide (NW) Permit application to the Corps of Engineers and corresponding 401 Water Quality Certification. Please be advised that a 401 Water Quality Certification requires satisfactory protection of water quality to ensure that water quality standards are met and no wetland or stream uses are lost. Final permit authorization will require the submittal of a formal application by the NCDOT and written concurrence from the NCDWR. Please be aware that any approval will be contingent on appropriate avoidance and minimization of wetland . and stream impacts to the maximum extent practical, the development of an acceptable stormwater management plan, and the inclusion of appropriate mitigation plans where appropriate. 16. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. 17. If temporary access roads or detours are constructed, the site shall be graded to its preconstruction contours and elevations. Disturbed areas shall be seeded or mulched to stabilize the soil and appropriate native woody species shall be planted. When using temporary structures the area shall be cleared but not grubbed. Clearing the area with chain saws, mowers, bush -hogs, or other mechanized equipment and leaving the stumps and root mat intact allows the area to re- vegetate naturally and minimizes soil disturbance. 18. Unless otherwise authorized, placement of culverts and other structures in waters and streams shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis- equilibrium of wetlands or streambeds or banks, adjacent to or upstream and downstream of the above structures. The applicant is required to provide evidence that the equilibrium is being maintained,if requested in writing by the NCDWR. If this condition is unable to be met due to bedrock or other limiting features encountered during construction, please contact the NCDWR for guidance on how to proceed and to determine whether or not a permit modification will be required. 19. If multiple pipes or barrels are required, they shall be designed to mimic natural stream cross section as closely as possible including pipes or barrels at flood plain elevation, floodplain benches, and /or sills may be required where appropriate. Widening the stream channel should be avoided. Stream channel widening at the inlet or outlet end of structures typically decreases water velocity causing sediment deposition that requires increased maintenance and disrupts aquatic life passage. 20. If foundation test borings are necessary; it shall be noted in the document. Geotechnical work is approved under General 401 Certification Number 3883/Nationwide Permit No. 6 for Survey Activities. 21. Sediment and erosion control measures sufficient to protect water resources must be implemented and maintained in accordance with the most recent version of North Carolina Sediment and Erosion Control Planning and Design Manual and the most recent version of NCS000250. 22. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of the NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. 23. While the use of National Wetland Inventory (NWI) maps, NC Coastal Region Evaluation of Wetland Significance (NC- CREWS) maps and soil survey maps are useful tools, their inherent inaccuracies require that qualified personnel perform onsite wetland delineations prior to permit approval. 24. Heavy equipment should be operated from the bank rather than in stream channels in order to minimize sedimentation and reduce the likelihood of introducing other'pollutants into streams. This equipment shall be inspected daily and maintained to prevent contamination of surface waters from leaking fuels, lubricants, hydraulic fluids, or other toxic materials.