Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8070319_Approved Plans_20101008
�Ic .. , ''. '' -w 7� 01 - � I I � IF -'. '11� MAW A� row owwow AM ■�► _t �r . Mw = AA �'K 'fto :bj Mw 49 J x loin 0 Coastal Land Design, PLLC Civil Engineering / Landscape Architecture / Construction Management P.O.Box 1172 Wilmington, NC 28402 Phone: 910-254-9333 Fax: 910-254-0502 OWNER: CAPE FEAR INVESTMENT AND DEVELOPMENT, LLC 1611 CASTLE HAYNE ROAD, STE B. WILMINGTON, NC 28401 PHONE: (910) 616 - 2200 FAX: (910) 791 - 7073 SITE 0 G SL17'TON S7'EA1Vz 7'LANT RU. LOCA77CW 14OUVOVIM OOUW,, MORM-• UOT TO SCALE SHEET INDEX SW—1 STORMWATER MANAGEMENT PLAN S— STORMWATER MANAGEMENT DETAILS APPROVED NORTH CAROLINA ENVIRC MANAGEMENT COMMISSION DMSION OF WATER QUALITY REISSUED FOR STORMWATER REVIEW BY NCDENR-DWO 21-MAY-2007 ISSUED FOR STORMWATER REVIEW BY NCDENRhDWQ 09-MARCH-2007 ISSUED FOR PRELIMINARY REVIEW BY NCDENR-DWO � 24-JANUARY-2007 PRELIMINARY DESIGN NOT RELEASED FOR CONSTRUCTION GENERAL NOTES: 1. THIS PROPERTY IS ZONED IND-2. 2. ANY REVISIONS TO THE SUBDIVISION PLAN WILL BE SUBJECT TO APPROVAL BY THE NEW HANOVER COUNTY PLANNING DEPARTMENT AND/OR THE NEW HANOVER COUNTY PLANNING BOARD. 3. ALL ROADS WITHIN THE DEVELOPMENT ARE TO BE PRIVATE AND CONSTRUCTED TO NCDOT STANDARDS. 4. THE SEWER SYSTEM AND WATER, SYSTEM FOR EACH LOT SHALL BE INDIVIDUAL SEPTIC SYSTEMS AND WELLS APPROVED BY THE NEW HANOVER COUNTY HEALTH DEPARTMENT FOR EACH INDIVIDUAL LOT. 5. PROGRESS ENERGY SHALL PROVIDE ELECTRICAL SERVICE AND STREET LIGHTING. SPECIAL NOTE: STORMWATER DRAINAGE FROM LOTS 5-10 SHALL BE DIRECTED TO AN EXISTING STORMWATER POND UNDER NCDENR STORMWATER PERMIT SW8 050217. LOTS 5-10 ARE LISTED AS "OFFSITE" UNDER THAT EXISTING STORMWATER PERMIT. THE ACREAGE, IMPERVIOUS ALLOCATION, AND STORMWATER QUANTITY HAVE ALREADY BEEN ALLOCATED UNDER THIS PERMIT AND WILL NOT BE MODIFIED IN THIS PERMIT. - US H \NY 4/ (160 ROW STORMWATER NOTES: 1. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING UTILITIES, ABOVE AND BELOW GROUND, PRIOR TO COMMENCING CONSTRUCTION. 2. CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS GENERATED THROUGH DEMOLITION AND GRUBBING ACTIVITIES. 3. SURVEY AND TOPOGRAPHICAL INFORMATION AS SHOWN ON THESE PLANS HAVE BEEN PROVIDED BY MICHAEL UNDERWOOD, SURVEYOR. 4. THIS SITE DOES NOT CONTAIN WETLANDS AND IS NOT IN A FEMA FLOOD ZONE. 5. THE DISTURBANCE FOR THIS SITE IS APPROXIMATELY 17.00 AC. 6. ALL DISTURBED AREAS NOT WITHIN THE PROPOSED BACK OF CURB (BOC) TO BE SEEDED, FERTILIZED, AND MULCHED WITHIN 15 CALENDAR DAYS OF GRADING ACTIVITIES. 7. ALL STORMDRAIN DEVICES ARE TO PROVIDE POSITIVE DRAINAGE. 8. EROSION AND SEDIMENTATION CONTROL PRACTICES ARE TO REMOVED IN THE LOCATION THAT THE STORMWATER SYSTEM IS BEING INSTALLED AT THAT TIME. 9. STORMWATER PUMPS ARE TO BE AVAILABLE FOR OPERATION AND MAINTENANCE AND EMERGENCY DRAINING OF THE POND. 10. ALL DRAINAGE FROM ROOF AND PARKING LOT IS TO BE DIRECTED TOWARDS STORMWATER POND. R63' RO' R48' EO R 35' R 50' 30' EOP 60' ROW --•-- OFFSET CUL-DE-SAC NOT TO SCALE j- 3: G_ o O w o � 60' ROW 130' EOP I t (1 I I t R25' ROW I (TYP) TYPICAL INTERSECTION NOT TO SCALE O O w Of a o r� Qp .r r �t \ -4 I j 7: 1.12 �AC. .OWABLE IMP.`,"I ' � INV.: -N OD CPR 1 Qfs CULVERT-4 y 48' OF 36" ti W RCP 0 0_50% 72.07 RAP' 13.51 EXISTING STORMWATER i; POND FOREBAY i 97 AC. I �` �� .E IMP.. 00 E l I SF o v v, -�-•I 0�0 � Z D O m .� i� I J J 4 ? _ J ..... -7 - EXISTING OUTLET STRUCTURE EXISTING JUNCTIOPJ 6OX RIM: 17.42 (SOL 0 TOP) RIM: 17. 01 (4)8 x48" WEIR INV: 16.25 BOTTOM: 13.08 10" PVC INV.: 15.20 4 PVC INV.: 1276.-- - - BOTTOM:-12.9-2 flow . _ , ... GRAPHIC SCALE 50 0 2.5 50 100 200 ( IN FEET ) I inch = 50 ft. PRELIMINARY DESIGN NOT RELEASED FOR CONSTRUCTION EXISTING SITE FEATURES PROPERTY BOUNDARY ADJ. PROPERTY BOUNDARY EXIST. ROADWAY - - - - EXIST. CONTOUR EXIST. DRAINAGE PIPE PROPOSED SITE FEATURES PRO. CONTOUR PRO. EDGE OF PAVEMENT — - - - - — PRO. LOT LINE — - - - - — PRO. RIGHT OF WAY - PRO. DRAINAGE BASINS ---------- PRO. DRAINAGE PIPE ■ i = = = = w 0 PRO. CULVERTS BUILT UPON CALCULATIONS OVERALL AREA: TOTAL PROJECT AREA = 10.002 AC. REQ'D WETLAND DEDUCTION = -0- PROJECT AREA = 10.002 AC. IMPERVIOUS AREA: LOTS/BUILDINGS = 5.934 AC. STREETS AND ROADWAY = 0.748 AC. PARKING = -0- SIDEWALKS = -0- OTHER = -0- TOTAL = 6.682 AC. PROJECT DENSITY: 6.682 AC. (100%)= 66.81% 10.002 AC. R; V OWNERSHIP NAME MODIFICATION 5/21/07 REV] DESCRIPTION REV.DATEBY REVISIONS slowftq 4; k f OWNER: CAPE FEAR INVESTMENT AND DEVELOPMENT, LLC 1611 CASTLE HAYNE ROAD, STE B. WILMINGTON, NC 28401 PHONE: (910) 616 - 2200 FAX: (910) 791 - 7073 Coastal Land Design, PLLC Civil Engineering / Landscape Architecture / Construction Management P.O.Box 1172 Phone: 910-254-9:333 Wilmington, NC 23402 Fax: 910-254-0502 CAPE FEAR BUSINESS PARK Stormwater Management Plan JOB NUMBER SHEET NUMBER 650-01 sw_ 1 PIPE DIA. �gR/gg�E �A JJJJJ JJJJJJJJI ram✓ 1h,/ TYPICAL CONC. FLARED END SECTION FY]�a�:7Cll�li��il L DO = LA = W = APRON WIDTH 3 X PIPE 0 MIN D = APRON DEPTH PLAN NOTES: SEE APPROPRIATE SCHEDULE FOR DIMENSIONS 1. LA IS THE LENGTH OF THE RIPRAP APRON. 2. D = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6" 3. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. RIP RAP APRON SCHEDULE CULVERT-1 CULVERT-2 CULVERT-3 CULVERT-4 SWP-OUTLET do = 24" do = 36" do = 36" do = 36" do = 36" La = 8.0' Lo = 18.0' La = 18. 0' La = 18. 0' La = 18.0' W = 6.0' W = 10.2 W = 10.2 W = 10.2 W = 10.2 d = 12" d = 18" d = 18" d = 18" d = 18" Class = 'A' Class = 'B' Class = 'B' Class = 'B' Class = 'B' RIP -RAP AT FLARED END SECTION NOT TO SCALE cRq�f TO p(COR%yo 60' PRIVATE RIGHT OF WAY 52' DITCH SECTION 40' SHOULDER SECTION 30' EDGE OF PAVEMENT 1" /FT "/FT I V/FT 4'IFT 7 1.5" SF 9.5A --/ ' `- 8" ABC TYPICAL RIGHT OF WAY CROSS-SECTION NOT TO SCALE &010G GR pp1 PCC PXA "/FT SHOULDFR 2'-0" 3.. / / /\</x ROADSIDE DITCH DETAIL NOT TO SCALE FORESLOPE SEDIMENT FOREBAY RIP -RAP EARTHEN WEIR - � APRON(S) ELEVATION: 14.50' TEMPORARY POOL: 15.34' NORMAL WATER LEVEL: 14,25' PERMANENT /x\/ / /POOL /X! ��� FOREBAY BOTTOM ELEV: 8.25, i / \, APPROXIMATE LENGTH 57' WEIR x� y 19, 00 I IN INV.: INV.: CULVERT-2 15.00 15.00 �� s RCP 0 0.50% ; -(� CULVERT-3 [� \ / D { \ I V I_ 20 _- RAILSIDE RCP0.50% .: 18 --- -- -�-� 18 1 7 INV. AND RIP RAP APRON: 14.79 INV. AND RIP RAP 14 18 APRON: 14.79 1 NOTE: USE ELASTOMETRIC BOOT NOTE: ---- ----- - - _ 1 1 t 10 y USE ELAETOMETRIC BOOT 9 AND SEAL WITH AND SEAL WITH NON -SHRINKING GROUT ON NON-SHRNKING GROUT ON 57 BLEEDDOWN AND PRINCIPAL BLEEDDOWN AND PRINCIPAL SPILLWAY ORIFICES SPILLWAY ORIFICES --- 4" I ( I I 6'x6' SQUARE TRASH 6'x6' SQUARE TRASH ~1 RACK WITH 4" OPENINGS. RACK WITH 4" OPENINGS. � INV.: 17.50 INV.: 17.50 --- !" 1 FLOW CONTROL 30. FLOW CONTROL 1 ORIFICE , ORIFICE 111 INV.: 15.34 INV.: 15.34 1 0 9' g~ 36" RCP 36" RCP 2" REVERSEDREVERSED SLOPE ORIFICE j-- 40" -1 SLOPE ORIFICE INV.: 14.25 �© INV.: 14.25 c V N WL: 14.25 N WL: 14.255 1' MIN SLOPE BOX WITH GROUTSPI O CK TO (TYP) (TYP) �" WAY BADRAIN s" (�) $" tm') _T - `- VIEW A -A' VIEW B-B' Y Rp�NG GRP��-(O PLPN N 2' VEGETATED SHELF OUTFLOW PIPE FRAME & GRATE FOOTING (TYP.) FRAME & GRATE OUTFLOW PIPE FOOTING - #4 BARS 0 12-O.C. EACH WAY - 6" #57 WASHED STONE POND RISER DETAIL NOT TO SCALE RIM ELEVATION AS SPECIFIED IN PLANS PLAN 1'-4" (TYP. ) SECTION CATCH BASIN d to TEMPORARY SEEDING 247 � 191 BACK OF POND: J RIP RAP LINED STORMWATER POND PLAN 1 INCH = 30 FEET GRASS TYPE AMOUNT/ 1000 SF. TIME OF SEEDING INITIAL FERTILIZATION/1000 SF. MAINTENANCE RYE GRAIN 1-2 LBS. NOV. THRU JAN. 25 LBS. 10-10-10 -NA- -NA- -NA- BROWNTOP MILLET 1-2 LBS. JUNE THRU AUG. 25 LBS. 10-10-10 -NA- -NA- -NA- PERMANENT SEEDING GRASS TYPE AMOUNT/ TIME OF INITIAL FERTILIZATION/1000 SF. 1000 SF. SEEDING MAINTENANCE BERMUDA, COMMON 1-2 LBS. APR. THRU JUNE 25 LBS. 10-10-10 MARCH - APRIL EACH 4-8 WEEKS AUG. - SEPT. 12 12 LBS. 10-10-10 1-2 LBS. N. LBS. 10-10-10 FESCUE, TALL 5-7 LBS. SEPT. THRU OCT. 25 LBS. 10-10-16 FEB. -MARCH 12 MAY &DEC. 1 /2 SEPT_ - OCT. 12 (KENTUCK.Y 31) FEB. THRU OCT. LBS. 10-10-10 TO 1 LB. N. LBS. 10-10-10 SERIC(S LESPEDEZA {SLOPES) 1-2 LBS. MARCH THRU APR. 25 LBS. 10-10-10 FEB, - MARCH 1/2 TO 1 LB. N. -NA- MAIN SEEDING SCHEDULE DETAIL NOT TO SCALE -------L-- - - - - - - - - - - - - - TEMPORARY POC: 15.34' L 12' VEGETATED SHELF ' 6:1 NORMAL WATER LE/EL: 14.25' MAX 6:1 MAX PERMANEN i POOL 6'x6' CONCRETE RISER RIM (TRASH RACK): 17.50/ CTRL ORIFICE(40"x6'): 15.3425 ORIFICE SPILLWAY (36"): 14.15 .\\ APPROXIMATE LENGTH 191' STORMWATER POND PATH OF FLOW CROSS-SECTION DETAIL NOT TO SCALE STORMWATER RISER WEIR RISER: 17.50 CONTROL ORIFICE: 15.34 BLEEDDOWN ORIFICE: 14.25 PRINCIPAL BARREL: 14.15 SEE DETAIL. 36" SPILLWAY PIPE 0 0.20% - PONO ENBANKMENT - 10.0' TOP OF BERM /EMERGENCY " ELEV. 19; 1„ " -/ SPILLWAY ELEV: 18.2' 36" RCP 0 0.245' \\ ANTI -SEEP\ /�. PRELIMINARY DESIGN NOT RELEASED FOR CONSTRUCTION RIP -RAP APRON LE EXISTING SITE FEATURES PROPERTY BOUNDARY -- -- ADJ. PROPERTY BOUNDARY EXIST. ROADWAY - - - EXIST. CONTOUR EXIST. DRAINAGE PIPE PROPOSED SITE FEATURES 5 PRO. CONTOUR PRO, EDGE OF PAVEMENT - - - - - - PRO. LOT LINE - - - - - - PRO. RIGHT OF WAY PRO. DRAINAGE BASINS - - - - - - PRO. DRAINAGE PIPE ■���■��■�E PRO. CULVERTS BUILT UPON CALCULATIONS OVERALL AREA: TOTAL PROJECT AREA REO'D WETLAND DEDUCTION = 10.002 = -0- AC. PROJECT AREA = 10.002 AC. IMPERVIOUS AREA: LOTS/BUILDINGS = 5.934 AC. STREETS AND ROADWAY = 0.748 AC. PARKING = -&- SIDEWALKS = -0- OTHER = -0- TOTAL = 6.682 AC. PROJECT DENSITY: 6.682 AC. (100%)= 66.81 10.002 AC. REV OWNERSHIP NAME MODIFICATION JRC 5/21C0i REV. DESCRIPTION DAT BY REVISIONS °®aa®®ae�outeBa ! -o _11, Ess/ �' ®� �B$a J. SEA 02885E OWNER: CAPE FEAR INVESTMENT AND DEVELOPMENT, LLC 1611 CASTLE HAYNE ROAD, STE B. WILMINGTON, NC 28401 PHONE: (910) 616 - 2200 FAX: (910) 791 - 7073 Coastal Land lDesin, PLLC Civil Enginecring / Landscape ATchitecture / Construction Management P.O.Box 1172 Phone: 910-254-9333 Wilmington, NC 28402 Fax: 910-254-0502 DRAWN J. CARMINE PROJECT 650-01 NUMBER DESIGN J. CARMINE CHECK: F. BRAXTON SCALE NOT TO SCALE APPROVED J. PETROFF I DATE 09-MAR-2007 FILE NAME CAPE FEAR BUSINESS PARK Stormwater Management Plan Details JOB NUMBER SHEET NUMBER 650-00 SW-2 &'I K 0 L "P-4 it r f Ar _ . m icz astal Land Design, PLLC Civil Engineering / Landscape Architecture / Construction Management P.O.Box 1172 Wilmington, NC 28402 OWNER. Phcne: 910-254-9333 Fax 910-254-0502 Cape Fear Investment & Development, LLC 1611 Castle Hayne Road, Quilding B Wilmington, NC 28401 Phone: (910) 359-6036 DEVELOPER: McKinley Building Corp. 3807 Peachtree Avenue Suite 200 Wilmington, NC 28403 Phone: (910) 395-6036 OCAWNkW n�r►H41*7V R COUVI ; RORTH CAROUVA NOT TO SCALE SHEET INDEX SW-01 STORMWATER MANAGEMENT PLAN SW=02 STORMWATER MANAGEMENT PLAN DETAILS DESIGNERS PLAN CERTIFICATION "I HEREBY CERTIFY THAT THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH THE LATEST NEW HANOVER COUNTY ORDINANCES AND STORM 1AATER DESIGN MANUAL." SIGNATURE: PRINTED NAME AND TITLE: DATE: REGISTRATION NUMBER: PROPERTY OWNER'S CERTIFICATION SEAL "I (WE) HEREBY CERTIFY THAT I (WE) AM (ARE) THE CURRENT OWNER OF THE PROPERTY AND THAT UPON RECEIPT OF "AUTHORIZATION-TO-C(NSTRUCT" AND CLEARING, GRADING, CONSTRUCTION OR DEVELOPMENT, WILL BE PERFORMED IN ACCORDANC: WITH THIS PLAN AND THAT THE APPLICABLE ORDINANCES AND RULES OF NEW HANOVER COUNTY, THE STATE OF NORTH CAROLINA, AND THE FEDERAL GOVERNMENT AND ITS AGENCIES WHICH ARE HEREBY MADE PART OF THIS PLAN. AS THE OWNER, I (WE) ACCEPT FULL RESPONSIBILITY FOR THE CONSTRUCTION AND OPERATION AND MAINTENANCE OF THE PROPOSED FACILITIES. I (WE) WILL NOT ATTEMPT TO TRANSFER OF THIS RE!PONSIBILITY WITHOUT THE WRITTEN AUTHORIZATION OF NEW HANOVER COUNTY." Oa SIGNATURE: PRINTED NAME AND TITLE: DATE: �w INA ENVIRONMENTAL MENT COMMISSION OF WATER QUALITY I5, 100 RF-0Tz,TVFD MAV BY t` PRELIMINARY DESIGN NOT RELEASED FOR CONSTRUCTION ------------------- ___ ----- - - - - - - - - - _ -- - - -- --- _.. - - - - - - - _ - - - 85' OF 24„ ------._._..__--------_.-...__----_- - _----- - - __._._.-----------------------------_-----._.__-- RCP C�} 0.50% �___---- - --------_-�- -__ ------_-__---_ _-__ ___ ______-_----------------�2TOF 24' _ US HIGHWAY NORTH RCP @ 0.50% -------_-- -- _ -- 16- ______ _____--��--_______--- 160T R%W --- ----- -___- --- -- �� ______ � Ed e of Pavement ------__--____-- 16 - - - - 1 1 � - 1h INV.: 13.48 - - - - - ��- - tib 1 INV.: 13.90 - 14- -- - 1 - _ _-------__----------14--- -_ -- _ �,_- - 1-® -- -- , -------- - 16 _ _ _ - --- - _ -,�--- - _-_ 15 r - 4 IN1�.4 13.20 - _- 14-- - - --- -- -- - - - - - - - - - - 14----- �, __1 ----- - _____ 1G--- t &3 _ _ 16- ___------- 16- --_- - _ _ �--1 _ 14;_- --- ��,� �.- - _ _ _____ -- 1�---f3ARKiNGLOT (24,894SF) - �� BOC It PROPERTY - - 1 1 17 18 1 - _ 11 _ _ _-------- _ _ - - - - 6 - - - - - _ - _ -_ 34' �� 30' co ----------I ---------- INV.: 13.66 BOUNDARY • --- 17-------- - - EP .. _ - - PROJECT BOUNDARY/ 38' 7 U DRAINAGE BASIN =; s PROPERTY - - -�� ��^- v ■ ■ ■ z �' o BOUNDARY � GRAPHIC SCALE f --/DEWALK t° DG-6 DG-7 DG_g C° 1 - 40Aso o zo ao Sao- � 1, e / Q0 \ \ 34' IN FEET / 0/ 94' BOC 94' BOC I 94' BOC BOC \ / 1 inch 40 \ /Y \ 0 0 BOC: 18.509 _ \ \\ Future Dev�o meat-2 ` ` - 53 � � �\ \ \ EOP. 18.00 \ . 58' \ N 29°29'40" W \ 9'�,000 sf � � \ \ \ Future buildin must h F 1' \ FE f 120ft I \ `17 - \ PROJECT BOUNDARY/ DRIAINAGE BASIN i d -IGO SETBACK i g a ea o 18.40' or greater and the/grade must be \ raised such that stoiinwater discharge/ ; from the developedarea does not drdm _ towards the water supply well. ll drainage musCbe directed towards the forebay or into the pipe S stem 1 0000 _ - % PROPOSED `0 - WATER WELL 1 5 w _� O In \\\ ELEVATION: �� - ,\ 18.40' J SE.TBA k-- 14 I \ \ •Ili. ,,\ \ 16 i 5 18 ' IS 16 17 / 14. I 12 23 14 1 / J i 10 I ./ 6 ,7 C�Ma21;n Pond - � \ \ 1 _ s r I B C: 1 11 \� s �_ _ __ 14.5 ------ -�t--------------- PROPERTY y15 is 17 16 BOUNDARY _ = f6q��'� ��.' Top of Berm Around Pond: 10' Wide at 18.40' _- -' •-• [! I I i I 1 It �, ( r, If 7 \ \ DESIGNERS PLAN CERTIFICATION RISER SEE 973.80' �. � � \\ �� � SHEETW-0-2 "I HEREBY CERTIFY THAT THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH THE LATEST NEW HANOVER 35' OF 36" COUNTY ORDINANCES AND STORM WATER DESIGN MANUAL." CPP AT 1.00% SIGNATURE: PRINTED NAME AND TITLE: DATE: REGISTRATION NUMBER: PROPERTY OWNER'S CERTIFICATION SEAL "I (WE) HEREBY CERTIFY THAT I (WE) AM (ARE) THE CURRENT OWNER OF THE PROPERTY AND THAT UPON RECEIPT OF "AUTHORIZATION -TO -CONSTRUCT" AND CLEARING, GRADING, CONSTRJCTION OR DEVELOPMENT, WILL BE PERFORMED IN ACCORDANCE WITH THIS PLAN AND THAT THE APPLICABLE ORDINANCES AND RULES OF NEW HANOVER COUNTY, THE STATE OF NORTH CAROLINA, AND THE FEDERAL GOVERNMENT AND ITS AGENCIES WHICH ARE HEREBY MADE PART OF THIS PLAN. AS THE OWNER, I (WE) ACCEPT FULL RESPONSIBILITY FOR THE CONSTRUCTION AND OPERATION AND MAINTENANCE OF THE PROPOSED FACT-ITIES. I (WE) WILL NOT ATTEMPT TO TRANSFER OF THIS RESPONSIBILITY WITHOUT THE WRITTEN AUTHORI?ATION OF NEW HANOVER COUNTY." SIGNATURE: PRINTED NAME AND TITLE: DATE: 36" FLARED END SECTION INV.: 14.05' N29'32'50"W -RIP RAP APRON LENGTH: 18' WIDTH: 10.2' THICKNESS: 18" CLASS: B ngress / Egress Area 8 � 1 � I I � 80 ` 120' F& 18.50 / I EP: 18.00 I � - r \ \ 04 / \ \ y __' ■ 0 PROJECT BOUNDARY/ DRAINAGE BASIN SCALE: 1 " = 300' DISCRA.GE SWAL� Q 0.50%. SEE DETAIL ON SW-02. i% i i PROJECT BOUNDARY DRAINAGE BASIN / / co ,76� Future Deve-1moment-1 40.1000 sf Future buJiltdiLngmust have a FFE_of 18.40'- or eater and the / greater grade must be raised such that stormwater discharge from the stormwater pond does not adversely impact the grade or proposed development. All drainage must be directed towards the stormwater piping system. _ SD EASEMENT 10'OFF OF�OF� / EXISTING 42" PIPE % EG: 13.20 ------ --- 14 / � \\ / PRbPERTY / EXISTING 42" BOUNDARY i FLARED END SECTION U.S"IRF,AM BA D.STRF:AM BASIN PIPE LENEr"1'[t PIPE SIZE D.S"I'REAM [NVEK'1' U.S'fREAM INVEK"i' PIPE SLOPr PIPE 1'Yl'E 11,5'[Ri;AM K1M ]7.50' U.S"1REAM BA IN S1LE U.S'IREAM K1M'i'YI'E JB-1 Porebay 34' 48" 7.00' 7.13' 0.38% C.P.P. 6-0" ll(i-2 JB-1 3(i4' 48" 7.13' 8.51' 0.38% C.P.P. 17.50' 17.50' LD. JUNCTION 6'-0" x 6'-0" DOUBLE D(i-3 DG-2 14T 48" 8.5F 9.0T 0.38°/6 C.P.P. 6'-0- 6'-0" DG 4 DG-S DG-3 1Xi 4 124' 124' 36" 30" ]0.07 11.04' 10.54' 11.51' 0.38% 0.38% C.A.P. C.P.P. 17.50' 17.50' x DOUBLE 4'-0" x Y-8" 4'-0" x 5'-8" DOUBLE DOUBLE [Xi 6 DCi-5 169' 24" 12.01' 12.65' C-P.P- 17.75' 4'-0" 4'-0" IXT-7 DCi 6 110' 24" 12.65' 13.07' 0.380%, C.P.P. 17.75' 17.75' 17.50' x SINGLE 4'-0" x 4'-0" SINGLE 1Xi-8 -9 DG-10 DG-7 DG-2 DG-9 110 129' 128' 18" 24" 18" 13.5T 12.22' 13.36' 13.99 12.86' 14.00' 0.38% 0.50% 0.50% C.P.P. C.P.P. C.P.P. 4'-0" x 4'-0" SINGLE. 4'-0" x T-8" DOUBLE 17.50' 4'-0" x 5'-8" DOUBLE STORMDRAIN SCHEDULE SEE SHEET SW-02 FOR STORMWATER NOTES PRELIMINARY DESIGN NOT RELEASED FOR CONSTRUCTION DR. DE CHI API FILI LE +++H f++-I-H+H-+ DRAINAGE AREA Cc FLARED END SECTION CURB FG: 21.0 HIGH/LOW POINT AND ELEVATION 21 PROPOSED POND CONTOURS EXISTING MINOR CONTOURS 20 EXISTING MAJOR CONTOURS -�- - - --- PROJECT BOUNDARY OUTLET PROTECTION STORMWATER INLET PROPOSED FLOW PATH STORMWATER PIPE C1-12 STRUCTURE LABEL BUILT UPON AREA CALCULATIONS OVERALL AREA: TOTAL PROJECT AREA = 602,992 S.F. REQ'D WETLAND DEDUCTION = NO WETLAND PROJECT AREA METHOD-2 = 602,992 S.F. IMPERVIOUS AREA: COMMERCIAL BUILDING ROOF = 70,365 S.F. PARKING/ASPHALT = 170,544 S.F. SIDEWALKS = 4,502 S.F. FUTURE DEVELOPMENT = 137,000 S.F. TOTAL = 382,411 S.F. PROJECT DENSITY: 382,411 S.F. 602'992 S.F.000%)= 63.42% REV MOVED POND TO NORTH-WEST JRC 4 CORNER OF PROPERTY 4/25/0 REV REVISED ENTRANCE FOR JNW 3 CONNECTION TO PARKING LOT 3/17/0 ZEV REDVISED POND SHAPE JNW 2 AS PER WELL LOCATION 2/29 0; ZEV REVISED POND SHAPE AS JNW 1 PER CLIENT 2/20/01 'EV. DESCRIPTION REV.BY # DATE REVISIONS C A RO0� //i /0-7' SEAL I, 3 3 519/oY MNER: :ape Fear Investment & Development, LLC 611 Castle Hayne Road, Building B Vilmington, NC 28401 'hone: (910) 359-6036 'EVELOPER: IcKinley Building Corp. 807 Peachtree Avenue Suite 200 Jilmington, NC 28403 hone: (910) 395-6036 &-astLI LandDes, n PLLC Civil Engineering / Landscape Architecture / Construction Management P.O.Box 1172 Phone: 910-254-9333 I Wilmington, NC 28402 Fax: 910-254-0502 kWN J. WINTERWERP PROJECT NUMBER 650-03 iIGN J. CARMINE _CK J. CARMINE SCALE 1' = 40' 'ROVED J. CARMINE DATE : 05-MAY-2008 NAME FERGUSON DISTRIBUTORS PROPOSED STORMWATER MANAGMENT PLAN J08NUMBER SHEET NUMBER 650-03 SW-01 GENERAL NOTES: c 1. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING UTILITIES, ABOVE AND BELOW SITE GROUND, PRIOR TO CONSTRUCTION. 2. CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS GENERATED THROUGH TEMPORARY SEEDING DEMOLITION AND GRUBBING ACTIVITIES. GRASS TYPE AMOUNT/ TIME OF 3- SURVEY AND TOPOGRAPHICAL INFORMATION AS SHOWN ON THESE PLANS HAVE BEEN PROVIDED BY 1000 SF. SEEDING INITIAL FERTILIZATION/1000 SF. MICHAEL UNDERWOOD AND ASSOCIATES FROM WILMINGTON, NORTH CAROLING. MAINTENANCE RYE GRAIN I I 1-2 LBS. NOV. THRU JAN. 25 LBS. 10-10-10 -NA- -NA- -NA- 4. THERE ARE NO WETLANDS ON THIS SITE. BROWNTOP MILLET 1-2 LBS. JUNE THRU AUG. 25 LBS. 10-10-10 -NA- -NA- -NA- M':.'.:.;.:::: •A G 5. THE DISTURBANCE FOR THIS SITE IS TO BE KEPT TO A MINIMUM. I I PERMANENT SEEDING ,.., TR„ 6. ALL DISTURBED AREAS NOT WITHIN THE PROPOSED BACK OF CURB (BOC) TO BE SEEDED, 7 ` t FERTILIZED, AND MULCHED WITHIN 15 CALENDAR DAYS OF GRADING ACTIVITIES. GRASS TYPE AMOUNT/ TIME OF FERTILIZATION/1000 SF. 7. ALL STORM DRAIN DEVICES ARE TO PROVIDE POSITIVE DRAINAGE. 1000 SF. SEEDING INITIAL MAINTENANCE VICINITY MAP -NOT TO SCALE 8. EROSION AND SEDIMENTATION CONTROL PRACTICES ARE TO REMOVED IN THE LOCATION THAT THE BERMUDA, COMMON 1-2 LBS. APR. THRU JUNE MARCH - APRIL EACH 4-8 WEEKS AUG. - SEPT. 12 T Q DARE) STORMWATER SYSTEM IS BEING INSTALLED AT THAT TIME. 25 LBS. 10-10-10 12 LBS. 10-10-10 1-2 LBS. N. LBS. 10-10-10 ( PUMPS FESCUE, TALL (SQ�gRe ,�0" (50 36' BARREL SPILLWAY 9. DRAINING OR THE PONDS. ARE TO BE AVAILABLE FOR OPERATION AND MAINTENANCE AND EMERGENCY SEPT. THRU OCT. (KENTUCKY 31) 5-7 LBS. FEB. THRU OCT. 25 LBS. 10-10-10 FEB. -MARCH 12 MAY & DEC. 1/2 SEPT. - OCT. 12 �qs � 5 51, INV.: 14.40' LBS. 10-10-10 TO 1 LB. N. LBS. 10-10-10-i-�i-i' DRAINAGE AREA H R FM 10. RUNOFF FROM FUTURE DEVELOPMENT-1 MUST BE DIRECTED TO THE DRAINAGE SYSTEM AS SERICEA LESPEDEZA ASK 8 q0 SPECIFIED ON THE PLANS AND RUNOFF FROM FUTURE DEVELOPMENT-2 MUST BE DIRECTED (SLOPES) 1-2 LBS. MARCH THRU APR. 25 LBS. 10-10-10 FEB. - MARCH 1/2 TO 1 LB. N. -NA- � FLARED END SECTION 1� 9 O�: 1 TOWARDS THE POND FORESAY. CURB FMS` OF 6 11. ALL ROOF DRAINAGE WILL BE DIRECTED TOWARDS THE COLLECTION SYSTEM. FG: 21.0 HIGH LOW POINT AND VERTICAL TRASH RACK Nk TO 12. ALL PIPE DRAINAGE EASEMENTS ARE 20' WIDE UNLESS OTHERWISE NOTED. SEEDING SCHEDULE DETAIL ELEVATION WITH MAXIMUM CLEAR NOT TO SCALE 0/- SPACE OPENINGS OF 4" 13. THE STORMWATER POND WILL BE PROTECTED FROM SEDIMENT UNTIL THE ENTIRE DRAINAGE BASIN SQAURE HAS BEEN STABILIZED.' PROPOSED POND CONTOURS 14. A SITE PLAN UPDATE MUST BE SUBMITTED TO NCDENR ONCE THE LAND PLAN FOR THE FUTURE PRELIMINARY DESIGN - - - 21 - - - EXISTING MINOR CONTOURS DEVELOPMENTS HAVE BEEN FINALIZED. THE TOTAL IMPERVIOUS AREA MUST BE LESS THAN 137,000 20 EXISTING MAJOR CONTOURS SF. NOT RELEASED ° a 4 \Q i ESL/ --a "N .. z tz Q �ei n 16 00/ 15. THE POND AND FOR£BAY ARE TO BE LOCATED IN AN EASEMENT DEDICATED AS COMMON SPACE.. FOR CONSTRUCTION o - PROJECT BOUNDARY `C m o r "O 1 y NOTES: is .� .�� z-f�� -HORIZONTAL AND VERTICAL DIMENSIONS MAY Be ADJUSTED AS THE OoaS PIPE DIA. x`nom FIELD CONDITIONS AND/OR ALTERNATE DESIGN REQUIRE. BE OUTLET PROTECTION C ATI� OO� MAXIMUM HEIGHT FOR THIS STRUCTURE IS 14'-0", W.; LL eNTFR cN 1g R� P� MINIMUM BOTTOM zH�Od„ MAXIMUM ALL ADJUSTMENTS AS DIRECTED BY THE ENGINEER. M UO RA/ Wp,,,, -ANCHOR STEEL FRAME AND GRATES IN ACCORDANCE WITH DETAILS SHOWN. 1a-•SF'Z 0) �� OF BOX: 13-90' VARIgQ C9 p NO BRICK RISERS ARE PERMITTED ON ANY PART OF THIS DRAINAGE STRUCTURE. NCr © STORMWATER INLET mt PROPOSED FLOW PATH O 4 DEPTH AS REQUIRED-'? 4 -- 4 0 o�' NT TO MAINTAIN ADEQUATE STORMWATER PIPE RE SL FOOTING o rMn caaT£s O „ �o _. JG p 50 F )� CO Y- - - f� F ` 4 - — W rW- CI-12 STRUCTURE LABEL C STE£L FN1A YE ND °A gT£3 F U1 ir OL:��/ rmC� m 1 , °MM0 o �/'`�� T PQ 90" E�A� J JJ JJjJJJJJ7 ��'✓ RIPRAP o..�-_ G- z• w o a i - G w z CC BUILT UPON AREA CALCULATIONS " W �" Al �. $-�z CY5\ : II 4 c : �- -W W LL aAiz'CFs: -F i "' `� -. f x o I- J OVERALL AREA: D -c-- Q j2 0 2' o •A' .o .t a�.__c_- v. z s TOTAL PROJECT AREA = 602,992 S.F. m v ... l,Z ,��• e _tip_ a __ _. �, REQ'D WETLAND DEDUCTION = NO WETLAND PVC " `2. ; z n PROJECT AREA METHOD-2 = 602,992 S.F. 7. . I _____ E'E' AR WIDTH {MIN SHOWN) T--- "I z Mr o IMPERVIOUS AREA: A o LENGTH {MIN SHOWN) + j G T TO BE ATo V 9 SECTION _X-X SECTIONrY-Y °° COMMERCIAL BUILDING ROOF = 70,365 S.F. w � _j PARKING/ASPHALT = 170,544 S.F. RMINVERENLEAST IAN BELOW EOATATIO TYPICAL CONC. " m U. � SiDEWALKS = 4,502 S.F. ANIT'P FLARED END '� % y TRAFFIC BEARING QROP_INLET � W FUTURE DEVELOPMENT = 38�,000 S.F. SECTION -/� -�� l WU PROJECT DENSITY: SHEET I OF 2 382,411 S.F. 100%)= 63.42% { ISOMETRIC VIEW 602,992 S.F. A A JRC .0 X REV MOVCORED NER DO PROPERTY TO NORTH-WEST 4/25/0$ RISER DETAIL b"aa� '�"` -� - - -__. -,-� . REV REVISED ENTRANCE FOR JNW — -- �� aWr o SEE SECTION Y-Y FOR ° eENSIPY-- ` BILL aF MATERIALS [ mz =� �- canaNaN caNci3M .,¢n� 3 CONNECTION TO PARKING LOT 3/17/08 fitNOT TO SCALE =oom --- `-- - sz� ETN straaT rat ooy=z z�Cjr-� 4 - - REV REDVISED POND SHAPE JNW DESIGNERS PLAN CERTIFICATION E5 3b o�d 2 AS PER WELL LOCATION 2/29/pg o Y 0 Y - n za- �LLo� O {A/ fw L rgAKGt'R°iiii':If_ _ 327. _' R r°C YY °�E-- REV REVISED POND SHAPE AS JNW ! HEREBY CERTIFY THAT THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH THE LATEST NEW HANOVER yZ FRYEA•OWATEE K - I�*"oTAJ'°i`Lsy COUNTY ORDINANCES AND STORM WATER DESIGN MANUAL." r C�(=� U wti an°Yums NIL..... i E[WT -_ 1 PER CLIENT 2/20/0$ �!-- C� f ies�m�EsrE �F - 9a 1 t-w W � R DESCRIPTION REV EY mH _ �-_--__ _ 'E a zor�L a�rss Z p SIGNATURE: DO = PIPE DIA `� �' X STRAIGHT BARS ~ o REVISIONS LA = APRON LENGTH �+ r P LL o PRINTED NAME AND TITLE: _ ,� .YFEN ♦.,, ,. z Cr W W = APRON WIDTH - �a I---£ WAC - 'c r._ °Nam__ - 6 � " DATE: 3 X PIPE 0 MIN > �- -- -. I1 D = APRON DEPTH PLAN o D - I - s -- �_F�t Q \\\���H CAyo�/;/ a o I I '—'- ; Q. , p °LESS/ Qr� REGISTRATION NUMBER: NOTES- .n n I ' — cs �''•• p �iy; • 1" T„ BASE_BANS CORNER BARS o 0 SEE APPROPRIATE SCHEDULE FOR DIMENSIONS a ` �'a" 33AL 0 •z 19 GENERAL NOTES: 1. LA IS THE LENGTH OF THE RIPRAP APRON. _ t -USE CLASS 'AA' CONCRFT'F FOR CAST IN PLACE BOX. `, O a $ -CHAMFER ALL EXPOSED CONCRETE CORNERS 1". Z ✓ ♦ \ b •USE FORMS TO CONSTRUCT THE BOTTOM SLAB. W V Uj • • \� PROPERTY OWNER'S CERTIFICATION SEAL 1.4 I�` z H W �9"h �GINti; ��'A, IF PIPES ARF SET IN THE BASE FOLLOW CONSTRUCTIONPROW / y/�y_Ml• e a • , \ D r - -INCLUDE REIICE FOR BFOR FORCING STEEL COST IN THE 010 W v7 ///�,�•I/`v �• �� ��``` 2. D = 1.5 TIMES THE MAXIMUM STONE DIAMETER -+ DURES "I (WE) HEREBY CERTIFY THAT I (WE) AM (ARE) THE CURRENT OWNER OF THE PROPERTY AND THAT UPON BUT NOT LESS THAN 6" M �' - N I PROVIDE GRA7E000ROPDRAINAGELETS OV RUCT8"E DEEP WITH STEPS SPACED 12" ON CENTER AS DIRECTED BY STD. OWG. 840.r6. RECEIPT OF AUTHORIZATION -TO -CONSTRUCT" AND CLEARING, GRADING, CONSTRUCTION OR DEVELOPMENT, PLAN OF BASE -FRAME AHD OMATE$ ARE SEPARATE CONTRACT ITEMS. WILL BE ET 2 OF 2 PERFORMED IN ACCORDANCE WITH THIS PLAN AND THAT THE APPLICABLE ORDINANCES AND RULES OF 3. A FILTER BLANKET OR FILTER FABRIC SHOULD BE s40.36 SHEET 2 F NEW HANOVER COUNTY, THE STATE OF NORTH CAROLINA, AND THE FEDERAL GDVERNMENT AND ITS AGENCIES INSTALLED BETWEEN THE RIPRAP AND SOIL OWNER: WHICH ARE HEREBY MADE PART OF THIS PLAN. AS THE OWNER, I (WE) ACCEPT FULL RESPONSIBILITY FOR FOUNDATION. Cape Fear Investment & Development, LLC THE CONSTRUCTION AND OPERATION AND MAINTENANCE OF THE PROPOSED FACILITIES. I (WE) WILL NOT " ATTEMPT TO TRANSFER OF THIS RESPONSIBILITY WITHOUT THE WRITTEN AUTHORIZATION OF NEW HANOVER 2 -p 0'-1" 0'-1" 0'-1" 1/2" R 1611 Castle Hayne Road, Building B COUNTY." i -4.5 0'-4.5" Wilmington, NC 28401 RIP —RAP AT FLARED END SECTION DETAIL 1„ R Phone: (910) 359-6036 NOT TO SCALE d °a SIGNATURE• d DEVELOPER: d PRINTED NAME AND TITLE: McKinley Building Corp. t, DATE: SHALLOW WATER: EMERGENT PLANTS 1 1� 4 R a ° 3807 Peachtree Avenue Suite 200 BOTANICAL NAME COMMON NAME SIZE SPACING a Wilmington, NC 28403 Cann lily 'Bengal Tiger' Canna 1 GAL 36" C, Phone: (910) 395-6036 d Iris virginica Blue flag Iris 1 GAL 24" Saururus cernuts Lizard Tail SPRIG 24 d d 4 TOP OF POND TOP OF POND S- ALLOW LAND: HERBACEOUS PLANTS '� ° ° d � ° VARIES 5'_0" VARIES - 18.30' d 18.30' d astal LandDesign, PLLC 5: I 5;1 \ \\\�\\�` %\�/\j\j\/ \ BOTANICAL NAtiE COMMON NAME SIZE SPACING o ° ° d I ° \/47 Eupotorum fsfu/Gum 1 GAL a d Civil Fngineerins/Landscape Architecture Construction Management FMSL //Joe ✓/\//\//\//,/i\/ // // // // // //\//\/i,/i\/// \/\/\/\/\/\/\/ j / / / / / / /i/i,/i,/i,/i,�i,/iiy Hibiscus moschectus Rose Mallow 1 GAL 36 d P.O.Box 1172 Phone: 910-254-9333 4" P 0 T 36" d d �y. ° Wilmington, NC 2$402 Fax: 910-254-0502 Lobelia Cardin als /i\//\// // // / / /• .,/i / / / / / / / Cardinal Flower DISCHARGE CHANNEL DETAIL SUBSITIUTIONS ARE ALLOWED DEPENDING ON AVAILIBILIY, SUITABILITY, 75" NOT TO SCALE EMERGENCY SPILLWAY DETAIL AND AESTHETICS HOWEVER, ANY SUBSTITUTION MUST BE APPROVED WHERE CENTER MEDIAN CURB NOT TO SCALE BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. IS REQUIRED GUTTER SHALL DRAWN SLOPE AWAY AS SHOWN J. WINTERWERP PROJECT 650-03 LITTORAL SHELF SPECIES LIST DESIGN J. CARMINE NUMBER FOR MAIN POND CURB AND GUTTER DETAIL CHECK: J. CARMINE" SCALE: NOT TO SCALE NOT TO SCALE APPROVED: J. CARMINE DATE : 05-MAY-2008 FORE SEDIMENT FOREBAY WEIR MAIN POND POND FILE NAME SLOPE EMBANKMENT i 0' BERM, TOP FOREBAY WEIR: 14.50' 10' BERM, TOP OF POND: 18.40' 50 EMERGENCY 10:1 VEGETATED SHELF OF POND: 18.40' SPILLWAY: 17.50' BOTTOM OF 10:1 _ TOP OF POND ELEVATION: 18.40' //--VEGETATED SHELF: 14.00' RISER: SEE DETAIL FERGUSON TEMPORARY POOL ELEVATION: 16.00' — TEMPORARY POOL ELEVATION: TOP OF POND ELEVATION: t 8 406 00' ON THIS SHEET RIP RAP APRON DISTRIBUTORS \/��\\/�\\//\\/\\I\\ \ PERMENANT POOL ELEVATION: 14.E0' PERMENANT POOL ELEVATION: 14.5(' SEDIMENT CLEANOUT ELEVATION: 7.00' / //\\//\\ \\//� //\\//\\//�%/\ SEDIMENT CLEANOUT ELEVATION: 7.00' 5�/\// ///\\//\\// //\\ \\/\/\/\5'x5'x6" LxWxT / / / / / /./iiice\ \\//�\ /\/\\%\/\/\ / / / / / / / /. \/\/\/\/\ \/\ \/\///// ANTISEEP COLLARS \�\\FOREBAY BOTTOM ELEVATION: 6.0)' /\/\/\/\/\/\ \/\ \/ /\/\/\/\/\/ / / / / / / / / / / / / / / / / / / / \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ 48" CPP \ \ \ \ \ \ \ \ \ \\ \ \ \ �\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \/\/\/\/ /\/\ / / /\MAIN POND BOTTOM ELEVA / / / / \ \�\\ \\ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ `\/\/ CENTERED ON PIPE \,\ \ \\\ \ \\�\\\\\\•\ //�\///fNFLUENTPIPE / /////////// //////////1//////////r/. / / / / / / / / / /\/\/\/\/\/\\\\\\\\\ \\\\\\\\\\\\\\\ \\\\\\\\\\\/\ VEGETATED /\!\. \i\ i\i\\i\ .\i\ /\i. /\\/ . / APPROXIMATE LENGTH $ /JTc �� /��//\�/\�/\//. A \/\/,\ / /\ SHELF (AROUND ENTIRE PROPOSED S TO R M WA TE R �kl� ) `'.\ MAIN POND M AN AGM \\•\ TOP OF SHF_LF: 15.00 ENT PLAN DETAILS STORMWATER POND PATH OF FLOW CROSS—SECTION BOTTOM OF 'SHELF: 14.00' NOT TO SCALE JOB NUMBER SHEET NUMBER 650-03 SW-02 astal Land Design,pLLc Civil Engineering / Landscape Architecture / Construction Management P.O.Box 1172 Wilmington, NC 28402 OWNER: Phone: 910-254-9333 Fax: 910-254-0502 Cape Fear Investment & Development, LLC 1611 Castle Hayne Road, Building B Wilmington, NC 28401 Phone: (910) 359-6036 . . ...... •iTii:Z 371! LCCA7M MAP JNW 1414NOVW ©OEW,, NORTH CAROLINA NOT TO SCALE SHEET INDEX COVER SW-1 STORMWATER MANAGEMENT PLAN SW-2 STORMWATER POND DETAIL ile-01o's 0 ISSUEDIT REVIEW BY NCDENR :' ,' 00: PRELIMINARY DESIGN NOT RELEASED FOR CONSTRUCTION }� /ti`�"� ---_ --------- -- -_ _-- �-- ----- --_._---------------`---- - -------------- US HIGHWAY 421 NO __ - - - - - - - - - - _-_- - - - - - - - - - - - --- - - - -.. v.--- - NORTH R,[W - - & 16---------------- --- - -- -. _.. _==_------ 6-- - ---- - -------- _._.. i6-_ , 17-- - - - ! - w _ram = ,= - -15- - 15-- - _ -- - �5�� �15- �?5-- - - 1�- 15-- - BUILT UPON AREA CALCULATIONS p S3 `tom ! 47 E F.L7-V� �, r�- - - - - Y '�r- _r-.., 7'.'Lf-F F 1 t I 1 i T' r r'--I -r'7 f �'. i i i 1 i 1 t�r ! i 1 t 1 1 S3 G E-..i._r.� I - - - - - L17 ...{ F.�-r --, �1 i 1 , I i ,i i � , ! ,.:J�,...1!-?�_.,-! giOVERALL AREA: ii- " t s 1 i ! , i�t 1 , , ."f'�i-'� , , ,-_�! _{-4-• :-�_ _ --- 1 � - •-- --- �6 1 __- - - _- .1 �-- PARKING LOT (24,894 SF) a TOTAL PROJECT AREA = 602,992 S.F. PROPERTY, BOUNDAR - PROJECT BOUNDARY - DRAINAGE AREA 26' EP io PROPERTY BOUNDARY REQ D WETLAND DEDUCTION = NO WETLAND - PROJECT AREA METH5D-2) = 602,992 S.F. - o - - -- _ =• ';' DI-1 ISSUED FOR STORMWATER PERMIT - � DI 11 �V - o No REVIEW BY NCDENR IMPERVIOUS AREA: - '. -- -- D{ 1 ; 70,365 - / 20-I�BftUARY-2008 POARKING COMMERCIAL AILDlNG ROOF _ 170,544SS.F. - - r` ARK NG / STORAGE � K•- .r� -- FUTURE DEVELOPMENT-2 AREA SIDEWALK (TYPJ 97,000,SF 145,650 SF -_ \ , (TO BE DIRECTED TOWARDS POND FOREBAY) { 5 ~ � I PROJECT BOUNDARY /� DI-10 I i - - h 1 _ sI i °I-16 70,365 SF PROPOSED �� ► BUILDING j Sri.- A { � I l � FFE = 18.50' 1-8 DI-14 BLOC vr' S3.58" N 29.29'40 PROJECT BOUNDARY \ \j \ PRELIMINARY DESIGN NOT RELEASED FOR CONSTRUCTION SIDEWALKS = 4,502 S.F. FUTURE DEVELOPMENT = 137,000 S.F. TOTAL = 382,411 S.F. PROJECT DENSITY: 382 411 S F 602,992 S.F. (100%)= 63.42% GENERAL NOTES: 1. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING UTILITIES, ABOVE AND BELOW GROUND, PRIOR TO CONSTRUCTION. 2. CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS GENERATED THROUGH DEMOLITION AND GRUBBING ACTIVITIES. 3. SURVEY AND TOPOGRAPHICAL INFORMATION AS SHOWN ON THESE PLANS HAVE BEEN PROVIDED BY MICHAEL UNDERWOOD AND ASSOCIATES FROM WILMINGTON, NORTH CAROLINA. 4. THERE ARE NO WETLANDS ON THIS SITE. 5. THE DISTURBANCE FOR THIS SITE IS TO BE KEPT TO N. \ 15 a \ \ y ; - I-15 / , �-,- t ,? 1 ` A MINIMUM. 16 tn-41 i / 00 i Q 6. ALL DISTURBED AREAS NOT WITHIN THE PROPOSED 00 ` 1$ _ �r / \ �. 't BACK OF CURB (BOC) TO BE SEEDED, FERTILIZED, `7 's 15 7. / �� \ N AND MULCHED WITHIN 15 CALENDAR DAYS OF yr\ \-4 f s \ / \ • to 1 j\j\ ' _ GRADING ACTIVITIES. 14 / 7. ALL STORM DRAIN DEVICES ARE TO PROVIDE POSITIVE V v y A FES- 7 " DRAINAGE. N87.21 07 E 1198.40' --j 222' FES-3 -'3 Y_ a< 8. EROSION AND SEDIMENTATION CONTROL PRACTICES _ .. - • � ( - ARE TO REMOVED IN THE LOCATION THAT THE f( STORMWATER SYSTEM IS BEING INSTALLED AT THAT _ \ -a7.o TIME. �� \ \ -• ---- CI--4 s DI-5 / / 1 9. STORMWATER PUMPS ARE TO BE AVAILABLE FOR OPERATION AND MAINTENANCE AND EMERGENCY PROJECT BOUNDARY INSET DRAINING OF THE PONDS. . \ STORM WATERp SCALE: 1 " = 300' \RNyLEET pig Epp 10. RUNOFF FROM FUTURE DEVELOPMENT-1 MUST BE POND �\ / % CD , j DIRECTED TO DI 6 AS SPECIFIED ON THE PLANS AND I� FUTURE , / -� / RUNOFF FROM FUTURE DEVELOPMENT-2 MUST BE - \ -'J / DEVELOPMENT-1 / / / - J f / VARIES - SEE PLAN VIEW DIRECTED TOWARDS THE POND FOREBAY. \. 0' p' 0' ! Dl=fj, nO-Onn �� - / J I� f� / 11. CALL ROOF OLLECTION SYSTEM. DI ALL BE DIRECTED TOWARDS THE -OS-2�_ / / ��5 ' `. `•., mePoeAaY Hoot_ EL. 15_7a' - SEE SHEET SW-2 \ (DIRECTED TO DI-6) _� / / 12 ALL PIPE DRAINAGEEASEMENTS ARE 20 WIDE EMER NCY SPILLWAY j ' - -' ! RIP RAP' APRON �i r UNLESS OTHERWISE NOTED. .5 (TYP.) SEE DETAIL _ i/ / / i C4 13. THE STORMWATER POND WILL BE PROTECTED FROM ��7 4 \ ``•, .5 72 � - - - - THIS SHEET �- J _ �% / f ,1' ^ SEDIMENT UNTIL THE ENTIRE DRAINAGE BASIN HAS - - - - - - - - / BEEN STABILIZED. "- _- --=- --�j Leo°' T jay s. 14•^ 1s. 1a 1� / / - / / ;' ' \�' \' `\�;� \�; \ \ ��: \ `: '�\�; �`' \�'��`'\\PONfl„�,� a, F„� 14. A SITE PLAN UPDATE MUST BE SUBMITTED TO -�=-- o s \\ SD EaSEMENT %�%/ �P"cAP NCDENR ONCE THE LAND PLAN FOR THE FUTURE FES-1COW -, 10 OFF OF EX. 42 CPP / / DEVELOPMENTS HAVE BEEN FINALIZED. THE TOTAL ,, . $ / VINYL SHEET PILE BAFFLE DETAIL IMPERVIOUS AREA MUST BE LESS THAN 137,000 SF. 3.83 ... W \ _ 15. THE POND AND FOREBAY ARE TO BE LOCATED IN AN 973.80' OPERTY BOUNDARY � ` 'y 1r3---------- N2932'So�W Irf•`„ rl�;" „',;;r �" 1 ! It! tt�f "r: /---��'_-�- _ j EASEMENT DEDICATED AS COMMON SPACE.. 35LF 36 RCP \1 -�-- -► ,..i.! FMMM WAIM i- - - VEGETATED - - - - _ SWALE z\ _, .-..: '� _ _ - -1E-------- _- _-�=-- _---�s--------_,-_-_-- ----= 30OLF ® 0-33% \ ,--- fiF----�s---------- '�-- \� \ EX - --z6 -- - - - 3 EASEMENT- - -- `lam \� _ - _ - P /f PROPERTY BOUNDARY CSX Eq EM _ _ 42" CP / f / -------__ -=-°�t-= =_------- = 14 --- - - - - - - -.-- -. - - - - - _ CO I 4.5- BAR SCALE 1 "=60'--------- ' ------ -- '----------- --� STORMDRAIN SCHEDULE Line ID Size (in} Type Slope M) Inert Dn (R) Inert Up (ft) Rim Down 00 Rim Up 00 FES 3 - Cl 4 24 RCP 0.49 11.62 11.86 14.50 17.40 CI 4 - DI 5 18 RCP 0.50 12.36 13.34 17.40 17.40 DI 5 - DI 6 18 RCP 0.50 13.34 13.90 17-40 17.40 FES 7 - Cl 8 42 RCP 0.50 8-50 8.88 14.50 17.40 Cl 8 - Cl 9 30 RCP 0.49 9.30 9.87 17.40 17.40 CI 9 - DI 10 30 RCP 0.50 9.87 10.84 17.40 17.40 DI 10 - DI 11 24 RCP 0.50 11.34 12.30 17.40 17.40 DI 11 - DI 12 18 RCP 0.50 12.80 13.35 17.40 17.40 DI 12 - DI 13 18 RCP 0.50 13.35 13.90 17.40 17.40 Cl 8 - DI 14 30 RCP 0.50 11.09 12.07 17.40 17.40 DI 14 - DI 15 30 RCP 1 0.50 12.07 12.51 17.40 17.40 DI 15 - DI 16 18 RCP 0.5 13.51 13.9 17.4 17.40 TEMPORARY SEEDING SHALLOW WATER: EMERGENT PLANTS BOTANICAL NAME COMMON NAME SIZE SPACING Canna lily 'Bengal Tiger' Canna 1 GAL 36" Iris virginica Blue flag Iris 1 GAL 24" Saururus cernuus Lizard Tail SPRIG 24" SHALLOW LAND: HERBACEOUS PLANTS BOTANICAL NAME COMMON NAME SIZE SPACING Eupatorium, fistulosum Joe Pye Weed 1 GAL 36" Hibiscus moscheutus Rose Mallow 1 GAL 36" Lobelia cardinclis Cardinal Flower 4" POT 1 36" SUBSITUTIONS ARE ALLOWED DEPENDING ON AVAILtBiLiY, SUITABILITY, _ t AND AESTHETICS. HOWEVER, ANY SUBSTITUTION MUST BE APPROVED t° 8Y THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. LITTORAL SHELF SPECIES LIST FOR MAIN POND GRASS TYPE AMOUNT/ 1000 SF. TIME OF SEEDING INITIAL FERTILIZATION/1000 SF. MAINTENANCE RYE GRAIN 1-2 LBS. NOV. THRU JAN_ 25 LBS. 10-10-10 -NA- -NA- -NA- BROWNTOP MILLET 1-2 LBS. JUNE THRU AUG. 25 LBS. 10-10-10 -NA- -NA- -NA- PERMANENT SEEDING AMOUNT/ TIME OF INITIAL FERTILIZATION/1000 SF. GRASS TYPE 1000 SF. SEEDING MAINTENANCE MARCH - APRIL EACH 4-8 WEEKS AUG. - SEPT. 12 BERMUDA, COMMON 1-2 LBS. APR. THRU JUNE 25 LBS. 10-10-10 12 LBS. 10-10-10 1-2 LBS. N. LBS. 10-10-10 FESCUE, TALL SEPT. THRU OCT. 2.5 LBS. 10-10-10 FEB. - MARCH 12 MAY & DEC. 1/2 SEPT. - OCT. 12 (KENTUCKY 31) 5-7 LBS_ FEB. THRU OCT. LBS. 10-10-10 TO 1 LB. N. LBS. 10-10-10 SERICEA LESPEDEZA 1-2 LBS. MARCH THRU APR. 25 LBS. 10-10-10 FEB. - MARCH 1/2 TO 1 LB. N. -NA- (SLOPES) SEEI)ING SCHEDULE DETAIL NOT TO SCALE 10 t SECTION Y SECTION X rr w Ali _r ^. ewe, PLAN CURB INLET DETAIL NOT TO SCALE VINYL SHEET PILE CAP NOT TO SCALE W It 9 VINYL SHEET PILE FOR BAFFLE NOT TO SCALE OUTFLOW PIPE � I I I 00 I I 6 6 i { oo FRAME & GRATE M col FOOTING (TYP.) FRAME & GRATE OUTFLOW PIPE FOOTING - J�U 3ARS @ 12"O.C. EACH WAY 6" #57 WASHED STONE in 4'-0' 8" 5'-4" 6'-0" RIM ELEVATION AS SPECIFIED IN PLANS PLAN 4" i'-4" (TYP.) SECTION CATCH BASIN -AR Uk-- 1A TYPICAL CONC. FLARED END SECTION ISOMETRIC VIEW L DO = PIPE DIA LA = APRON LENGTH W = APRON b u I r-1 3 X PIPE 4 MIN D = APRON DEPTH PLAN NOTES: SEE APPROPP14TE SCHEDULE FOR DIMENSIONS 1. LA IS THE LENGTH OF THE RIPRAP APRON. 2. D = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6" 3. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BE-5VEEN THE RIPRAP AND SOIL FOUNDATION. RIP -RAP AT FLARED END SECTION DETAIL NOT TO SCALE IN LEGEND f1111111111 �-rrTTr*-r-rr-T �-�' i- DRAINAGE AREA A FLARED END SECTION Q RISER OUTLET STRUCTURE 0 1-90 HIGH/LOW POINT AND ELEVATION PROPOSED POND CONTOURS -- - -- - EXISTING MINOR CONTOURS - -- EXISTING MAJOR CONTOURS PROJECT BOUNDARY OUTLET PROTECTION INLET PROPOSED FLOW PATH EX. RAILROAD TRACKS 0N �CA11���si' S �• AL r, • ~ Z�Z%Y "ice✓.yS ��(i I ►NEF:¢® o�v`• OWNER: Cape Fear Investment & Development, LLC 1611 Castle Hayne Road, Building B Wilmington, NC 28401 Phone: (910) 359-6036 FAX: 910-791-7073 Coastal Land Design, PLLC Civil Engineering / Landscape Architecture / Construction Management P.O.Box 1172 Phone: 910-254-9333 Wilmington, INC 28402 Fax: 910-254-0502 DRAWN : J.WINTERWERP PROJECT NUMBER 650-03 DESIGN : J.WINTERWERP CHECK : J.CARMINE SCALE 1"=60' APPROVED : J.CARMINE DATE 28 JAN 08 FlLE NAME : FERGUSON DISTRIBUTORS PROPOSED STORMWATER MANAGMENT PLAN JOB NUMBER SHEET NUMBER 650-03 SW-1 GENERAL NOTES: 1. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING UTILITIES, ABOVE AND BELOW GROUND, PRIOR TO CONSTRUCTION. 2. CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS GENERATED THROUGH DEMOLITION AND GRUBBING ACTIVITIES. 3. SURVEY AND TOPOGRAPHICAL INFORMATION AS SHOWN ON THESE PLANS HAVE BEEN PROVIDED BY MICHAEL UNDERWOOD AND ASSOCIATES FROM WILMINGTON, NORTH CAROLINA. 4. THERE ARE NO WETLANDS ON THIS SITE. 5. THE DISTURBANCE FOR THIS SITE IS TO BE KEPT TO A MINIMUM. 6. ALL DISTURBED AREAS NOT WITHIN THE PROPOSED BACK OF CURB (BOC) TO BE SEEDED, FERTILIZED, AND MULCHED WITHIN 15 CALENDAR DAYS OF GRADING ACTIVITIES. 7. ALL STORM DRAIN DEVICES ARE TO PROVIDE POSITIVE DRAINAGE. 8. EROSION AND SEDIMENTATION CONTROL PRACTICES ARE TO REMOVED IN THE LOCATION THAT THE STORMWATER SYSTEM IS BEING INSTALLED AT THAT TIME. 9. STORMWATER PUMPS ARE TO BE AVAILABLE FOR OPERATION AND MAINTENANCE AND EMERGENCY DRAINING OF THE PONDS. 10. RUNOFF FROM FUTURE DEVELOPMENT-1 MUST BE DIRECTED TO DI 6 AS SPECIFIED ON THE PLANS AND RUNOFF FROM FUTURE DEVELOPMENT-2 MUST BE DIRECTED TOWARDS THE POND FOREBAY. 11. ALL ROOF DRAINAGE WILL BE DIRECTED TOWARDS THE COLLECTION SYSTEM. 12. ALL PIPE DRAINAGE EASEMENTS ARE 20' WIDE UNLESS OTHERWISE NOTED. 13. THE STORMWATER POND WILL BE PROTECTED FROM SEDIMENT UNTIL THE ENTIRE DRAINAGE BASIN HAS BEEN STABILIZED. 14. A SITE PLAN UPDATE MUST BE SUBMITTED TO 60 NCDENR ONCE THE LAND PLAN FOR THE FUTURE DEVELOPMENTS HAVE BEEN FINALIZED. THE TOTAL IMPERVIOUS AREA MUST BE LESS THAN 137,000 SF.E 15. THE POND AND FOREBAY ARE TO BE LOCATED IN AN EASEMENT DEDICATED AS COMMON SPACE.. PRELIMINARY DESIGN NOT RELEASED FOR CONSTRUCTION BUILT UPON AREA CALCULATIONS OVERALL AREA: TOTAL PROJECT AREA = 602,992 S.F. REQ'D WETLAND DEDUCTION = NO WETLAND PROJECT AREA METHOD-2 = 602,992 S.F. IMPERVIOUS AREA: COMMERCIAL BUILDING ROOF = 70,365 S.F. PARKING/ASPHALT = 170,544 S.F. SIDEWALKS = 4,502 S.F. FUTURE DEVELOPMENT = 137,000 S.F. TOTAL = 382,411 S.F. PROJECT DENSITY: 382,411 S.F. (1007.)= 63.42% EMERGENCY SPILLWAY DETAIL 2,-0" ..�...T.. iI� (• 0 -4.5 1" R 602,992 S.F. ° aC ` � - \ O_�_ 0 30 I ° G n EASEMENT - WIDTH AS INDICATED 1 1/4 " R NOTE: G r GRADE DITCH TO PROVIDE 4 POSITIVE DRAINAGE a: a c7 --r- Q4 1 a 4 4 a a a n LID cp b a Q0 ° ! ° b Q . As o { G _ $, a a - 4 a ° Q.a. a ° 4 V 75" VEGETATED S W A B r/ WHERE CENTER M D CURB _ IS REQUIRED GU HALL CURB AND GUTTER DETAIL NOT TO SCALE Jam_ - __. J - i SLOPE AWAY A WN NOT TO SCALE 60 90 BAR SCALE 1 "=30' ISSUED FOR STORMWATER PERMIT REVIEW BY NCDENR 20-FEBRUARY-2008 - r \ / / 15 14 17 i6 f8 18 ' �- __ I{ + t + �ail�i ililr�ltl_L_111i) eir ��t� \ 973.80' `-_-------------- FORESLOPE SEDIMENT FOREBAY WEIR 15, 10' VEGETATED _ SHELF EARTHEN WEIR TEMPORARY POOL: 15.73' NORMAL WATER LEVEL• 14.50' to- 1 PERMANENT /\\/\\j X \\1 j AX� POOL`\\\//\\/ amjam//�//�//�//� INLET PIPES \ , \ FOREBAY BOTTOM/\\/ X ELEV- 8.50' SEDIMENT CLEANOUT LEVEL: 9.50' �Z.-/! APPROXIMATE LENGTH 90' D �fif if, iili it MAIN PONI 1 /2A R 4.0' - - - R=4" PVC 8" ISOMETRIC VIEW n 1 1 T 1 1- T r-- -Tr-) I I n -r- i i r--, r- r-. r- -r- A I I = 7 5.0' + 1.0' 0--17.65' TOP OF BOX/ EMERGENCY SPILLWAY ---'----�j-75.73' TEMPORARY POOL 14.50' NORMAL POOL ANTI -FLOTATION COLLAR PROFILE VIEW 10' VEGETATED SHELF BOTTOM OF VEGETATED . SHELF: 14.00' TEMPORARY POC_- 15.73' NORMAL WATER LFJEL- 14.50' - 10.1\ tAAX\� \3 PERMANEN i POOL / \ \ \ Mq� SEDIMENT CLEANQIT LEVEL 9.50' p�C - \/// IS TOP OF ISER. 17.65/ CONOROL IFICE CR 4 INVERT. 15. 14.50 BARREL 36" : 14.20 APPROXIMATE £NGTH 8352' SEDIMENT BASIN PATH OF FLOW CROSS-SECTION DETAIL NOT TO SCALE 8" PLAN VIEW - POND ENBANKMENT - 10.0' TOP OF BERM -EMERGENCY ELEV: 1&4-0' I SPILLWAY ELEV: II/ll/ll/fl/11/tl/11/tlltlt /. / 17.65' �•,� `,� VEGETATED 36' RCP SWALE ® 1.05% 0 0.33% >"\\ \ coin � \X//\/ -}-1444 + t } d4 DRAINAGE AREA FLARED END SECTION RISER OUTLET STRUCTURE 17, 0 HIGHAOW POINT AND ELEVATION r0 , PROPOSED POND CONTOURS - _ - - - - - EXISTING MINOR CONTOURS -- -- - -- EXISTING MAJOR CONTOURS -��- - - ---- PROJECT BOUNDARY OUTLET PROTECTION ® INLET PROPOSED FLOW PATH '! •� EX. RAILROAD TRACKS EMERGENCY SPILLWAY t� ��\11C A 111/�i �` R 0 ES SE -. r; 3196 OWNER: WA It wll� /t �►► 3 . 1111:a� 1 i MALL Qastal sand Design, PLLC Civil Engineering / Landscape Architecture / Construction Management P.O.Box 1172 Phone: 910-254-9333 Wilmington, NC 28402 Fax: 910-254-0502 FERGUSON DISTRIBUTORS STORMWATER POND DETAIL �B NUMBER SHEET NUMBER 650-03 SW-2 Storr»w�ter Management Pans for 9 4m jP10 !f 7 AIIIM AM 4LIM Im . 04wvyr Amol 2 y JNFM Project New Hanover cpaililiffiffty, North Carolina Coastal PLLC. Civil Engineering / Landscape Architecture / Construction Management -P.O. Box 1172 Wilmington, NC 28402 OWNER: Phone: 910-254-9333 Fax: 910-254-0502 Hwy 421 Properties, LLC 1508 Military Cutoff Road, Suite 302 Wilmington, NC 28403 Phone: (910) 395-6036 DEVELOPER: McKinley Building Corp. 3807 Peachtree Avenue Suite 200 Wilmington, NC 28403 Phone: (910) 395-6036 JAN 0 6 2010 L.O�CATi lli M 04W h%h%)M COLW 0 t40M AI� NOT TO SCALE i SHEET INDEX S W-01 PROPOSED STORMWATER MANAGEMENT AND GRADING PLAN SW-02 STORMWATER CONSTRUCTION DETAILS Is 0' -AL APPROVED NORTH CAROLINA ENVIRONIANIAL. MANAGEMENT COMMISSION DIVISION OF WATER QUALITY ADDED INFILTRATION TRENCH TO TREAT JRC� REV RUNOFF FROM THE DOCK PIT AND TRENCH 2 DETAILS TO SHEET SW-01. THERE ARE NO 01 /06/10 CHANGES TO SHEET SW-02. ADDED ACCESS ROAD AND SUPPLEMENTAL JRC REV DIMENSIONS TO SHEET SW-01. 1 ADDED SIDEWALK, ACCESS ROAD AND 11 /24/09 PARKING DETAILS TO SHEET SW-02. NOT ISSUED FOR CONSTRUCTION. ISSUED FOR AGENCY REVIEW ONLY. -------- ----- - - - - -RIP RAP APRO-N.. >� _------- - ___---___- _ _---=--_--_.__-- ------ LENGTH: 8' - --- _ _f? T WIDTH: 6 - - - - - � H-W Y 4 2 1 - O RCP @ 0.25� THICKNESS: 12" - - - - _ CLASS: ' 85' OF 24" - RCP @ 0.25% R 16 0' - - - - 1 -----. Ed e of Pavement - • _ _ - - _- - 1 �- FES INV.: 13.52 15 _ - 1� n_-_--------- - _--32°47'32"E /ET - 1 S 3 2 46 fib E _ _ .__-_- - - - - - - ■■� - - - _ =. "' 1FES INV 1385 P\o 0 .. - - R4 -= ---- "" �-- _ - PROPOSED CONCRETE oo DRIVE -OVER CURB 1 - _ BARRIER 1 GRAPHIC SCALE 7 ADJACENT 1 � CURB ENDS AT PROPERTY 1 40 0 20 40 60 160 CURB INLET-12 -- � BOUNDARY CI-12 CI -II 11 y 1 ( IN FEET) 1 / I i 1 inch = 40 ft. \ PAVEMENT \ II DIRECTIONAL EOP:1 • • • ..- �.!!r_!��ll�����E7Eli1 �!*1�1� i►11:1�1L7��IIifi.T.1'��E'l�E!!il 10 ]1 $OC:117. ravemera �cneauie DG-8 �8 2" SF 9.5�A + 6" ABC HIGH PT ,EV.: 18.3 6' IIOP: 1 /Y i/ \ II STRIPING FG:179 1 Future Development-?P '�-' I1 97 00 sf Impervious\ \\al Fuure Parking 0 I1 ly L t�St \ E' Pavement Schedule 1 1 1 I� 1 II \ o or pprre x anslon \ 2? p 1.50" SF 9.5B \ 1 2.5" Binder \ 07,66sf 8" ABC I \>> 124' . . I \ 168' \ FG:17.7 DG-6 p FUTURE) _ b 1 PROJECT BOUNDARY/ i II 1 DRAINAGE BASIN 5' WIDE 6" EARTHEN BERM Q 0 OFF EOP, cn f 1 / SETBACK FUTURE PARKING 1 / LOT EXPANSION BOO I - J IF I I v� t...: I � 1 PRIVATE WATER II 1 f II SUPPLY WELL II ,CO E~ , HIGH PT �1 11 / I r D LEV.: 17.70 ro EASEMENT w EOP:17.8 1 FG 17 8 Ln 00 1 PROPOSED 1 III 1 WATER WELL UTR -t 1 II �` II � • � ' �a �v P1 III \ II � \ INFILTRATION 1 c � i 1 ELEVATION: \ I � - ` - TRENCH 1 1 18.65' \\ II v DRAINAGE BASIN o� 176. ■ DG-5 o I / \ I I FCr'' cn c I1 I / 14' ELEVATION I I �� fi4° CONTOUR TO BE 1 II ■ s4. :.� \ / FILLED TO AT - ` LEAST 14.50' III ■ 1�. / II FG: 17.9 1$ 4%& / I w .ibi�!: s EMS ■ =in ■ I' Ei �I KV* v 6'- _0`--CURB TRAN�TfON TO EQUAL PAVEMENT ELEV. I P: 7.6 0P:17.9 OP:17.9 C: 8.1 OC:18.4 OC:18.4 10 ° �h F_ES INV.:-13.32- -- 14------ ._ > r- I� co `- RIP RAP APRON LENGTH: 8' WIDTH: 6' is THICKNESS;--12" 6s N CLASS: 'C3' 00 11111�©���i3�►111�111111111� � . ; `12" SLOT DRAIN INV.: 13.44 o Proposed Building: 70,365sf l Minimum FFE = 18.65' INFILTRATION TRENCH DRAINAGE BASIN 12" SLOTTED DRAIN INV/13.31 CONIC. SD CROSSING (12") DOCK PIT INV.: 13.22 (18") DG-18 INV.: 10.42 o b SEPARATION = 1.3' 221' -SETBACK.011 -2 6 15 AI 18 17 3 psQ 1 T 18 I I / 16 JB-1 �- um a --_-` 18 is 16 17 I QED 16 IB 4 DOCK PIT DRAIN: 112' --------r77t�-------- la.s-------- OF 12" PVC @ 0.10% II 1 ( 00 I 10 11 12 13 I li j STD JUN � DN BOX FOR 1 I I ( 9 I I / INFILTRATION SYSTEM F7ff56' I 7 s I III PIFE INV.: 13.20 173' I II BOTTOM: 11.20 (2' SUMP) 1 I I I II� 13.25W' x '051 x 1.25'D--- � 231' INFILTRATION TRENCH 1� 1 I 52' L.F. OF ( (FUTUR ) SEE DETAIt_ -- s� N "Ln 1 �� w 48 RCP Main Pond N I 105' OF PERFORATED--�� ~� ( INV. 8.00' I STORMWATER 1 Er - - 12' PIPE @ 0% 1 4"' I I I' DRAINAGE EASEMENT JUNCTION 1 (OX I II STORMWATER RIM: 1B6.0 35' EMERGENCY ( I I 7 6 I II DRAINAGE EASEMENT WER INV.: 14.45 SPILLWAY s I I PIKE INV.: 13.20 1 I l0 9 I III \ 372, SEE DETAL: THIS SHEET ELEV: 17.5' 1 I 1, 11 SEE DETAIL - I ('••"--- 14.5-------------- ------ 0 2, ADJACENT 17 t6 15 16 is 15 OPPB @ 0.61 % PROPERTY �`� ��������� _ BOUNDARY r6 18 op of Berm Around Pond: 10' Wid at 18.40' 15 i4 17 16 s 16 5'x5' OUTER DIM PRECAST 973.80' N29°3250"W CONC. BASIN WITH TRASH RISER SEE RIP RAP APRON - -- - --SKEET- SW �2- -- RIP RAP APRON DISCHARGE SWALE @ 0.33�. RACK FROM #4 BARS AT 4" 36" F.E.S. SEE DETAIL ON SW-02. 'LENGTH: 6.0' O.C.E.W AT ELEV: 14.50' S INV.: 14.05' LENGTH: 18 WIDTH: 2.7 GENERAL NOTES: INVO.: 9.50' HDPE@ 1.00% WIDTH: 10.2' THICKNESS: 12" STD MANHOLE THICKNESS: 18" CLASS: 'A' 1. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING UTILITIES, CLASS: 'B' ABOVE AND BELOW GROUND, PRIOR TO CONSTRUCTION. RAME AND RIM WEIR TO BE 6" RM: 16.0 l� 2' 13.25' 2. CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS THICK EXTEND FROM FINISHED GRADE: 16.0' MINIMUM \ GENERATED THROUGH DEMOLITION AND GRUBBING ACTIVITIES. WALL TO WALL AND//��/� ��/��///��/�% 3. SURVEY AND TOPOGRAPHICAL INFORMATION AS SHOWN ON THESE PLANS BE CENTERED IN �\ �\ �\ �\ �\ �\ �\ �\\�����\ HAVE BEEN PROVIDED BY MICHAEL UNDERWOOD AND ASSOCIATES FROM /� /� /� /� / �// /�� /�/�/�� /�� / / / /�/ THE BOX ��������������� TOP OF INFILTRATION TRENCH: 14.45' \�\\\������i WILMINGTON, NORTH CAROLINA. , 4. THERE ARE NO WETLANDS ON THIS SITE. 6 INV.: 14.45 6' 1 S N E: 1 .2 ram, Tr �� o 2"D PERF WASI-ED III ' A.B.C. REVERSE CROWN _ _. --_,--_. ■ ACCESS ROAD FOR °�i�� , c DG-18 FIRE DEPARTMENT USE 17 221' FUTURE Future Development-1 I PARKING -LOT EXPANSION BOO 35,580 sf Impervious 1 FM 63.58' - 1 % N 29°29'40" W 1 GENERAL NOTES CONTINUED: YI-14 1 1. THE ROOF DRAINAGE SHALL BE DIRECTED TOWARDS 1 I THE INLETS ON THE NORTH AND SOUTH SIDE OF THE 1 BUILDING. 1 2. ALL PIPE DRAINAGE EASEMENTS ARE 20' WIDE UNLESS OTHERWISE NOTED. 1� 3. THE STORMWATER POND WILL BE PROTECTED FROM 1 SEDIMENT THROUGH AN APPROVED EROSION CONTROL PLAN UNTIL THE ENTIRE DRAINAGE BASIN HAS BEEN YI-15 1 I STABILIZED. 1 4. THE POND WILL BE USED AS A SEDIMENT BASIN d DURING THE CONSTRUCTION OF THIS PROJECT. THE 1 ,0 ue'POND IS TO BE CLEANED OUT PRIOR TO USE AS A 1 s, STORMWATER POND. a� 5. A SITE PLAN UPDATE MOST BE SUBMITTED TO NCDENR 1 / ONCE THE LAND PLAN FOR THE FUTURE DEVELOPMENTS-1 AND -2 HAVE BEEN FINALIZED. THE TOTAL IMPERVIOUS AREA FOR THESE TWO FUTURE AREAS MUST BE LESS THAN 132,580SF. 6/ THE SITE PLAN FOR THE FUTURE LOT/STORAGE EXPANSION OF 107,605 SF WILL BE CONSTRUCTED AS 1 ct3 O / SHOWN IN THESE PLANS. HOWEVER, IT IS NOT PLANNED I� TO BE CONSTRUCTED AT THE TIME OF THIS PERMIT MODIFICATION. .� Ln YI-16 1 z I 7. THE POND AND FOREBAY AND INFILTRATION TRENCH 1 QI I ARE TO BE LOCATED IN A STORMWATER EASEMENT. 1 8. FINISHED GRADE AT PERIMETER OF BUILDING IS TO BE 1 AT LEAST 4" BELOW FINISHED FLOOR ELEVATION EXCEPT AT THE FRONT ENTRANCE AND AT EXTERIOR j 1 DOORSTOOPS. THE SITE MUST HAVE POSITIVE DRAINAGE 1 AWAY FROM THE BUILDING. ° I 9. THE INFILTRATION TRENCH SHALL BE INSTALLED AND 1 IMMEDIATELY COVERED WITH FILTER FABRIC TO PREVENT SEDIMENTATION. THE DOCK PIT SHOULD BE 1 I PAVED PRIOR TO THE CONNECTION OF THE DOCK PIT 1 DRAIN LINE TO THE INFILTRATION SYSTEM. ANY 1 SEDIMENTATION ACCUMULATION MUST BE FLUSHED OR CLEANED OUT PRIOR TO THE PROJECT COMPLETION. YI-17 1 4' I NOT ISSUED FOR 1 CONSTRUCTION. ISSUED FOR 1 GENCY REVIEW ONLYI, 111111MMY THIS PROJECT IS IN FLOOD 40 11 O ZONE-X,ACCOkDING TO FEMA 16 11 N MAP PANEL 3720320000K � o Water O , Q0 `� Tank cn All Stake Tank (or AplIroved Equal) 30'-9 4" Diameter ;19>>-8 8" Height 15 1 To be removed after future connection to 3 11 future public water system. Sib=15.5'. 1IL Design and location by Ethers. 3 1 1 � 1 i1 1 J4* I 2 20 STORMWATER EASEMENT II EXISTING WATER SUPPLY 2��0 1 "'■�����������������..��.■rl WELL FOR BUILDING PROPOSED SPRINKLER -_ !SPRINKLER SYSTEM WELL EASEMENT 10'x10' I - T ELEV.: 15.00' / PROPOSED STORM DRAIN EASEMENT \ 10' OFF OF EXISTING 42" PIPE 8" PIPE EXISTING- INV. 13.03 S;IAtALE -1 �2"- 4F.E.S. PROPERTY -�\ /� � BOUNDARY INV 12.9 2' --I S. THE DISTURBANCE FOR THIS SITE IS TO BE KEPT TO A MINIMUM. 12 PIPE / / WASHED #57 STONE =� PIPE J > / x// X// 6. ALL DISTURBED AREAS NOT TO BE STABILIZED WITH IMPERVIOUS SURFACE INV.: 13.20 INV.: 13.206/ O \ TO BE SEEDED, FERTILIZED, AND MULCHED WITHIN 15 CALENDAR DAYS OF FOOTINGN _ 2 / \p` BOTTOM OF INFILTRATION TRENCH: 13.20' - \ GRADING ACTIVITIES. 3. Q. N \ ./\ FIL ER FABRIC AROUND STONE _ \ �e \ BOTTOM OF 3 WASHED SAND; 12.95 3 WASHED SAND UNDERNEATH FABRIC / 7. ALL STORM DRAIN DEVICES ARE TO PROVIDE POSITIVE DRAINAGE. � / / I I - I - - - � 8. EROSION AND SEDIMENTATION CONTROL PRACTICES ARE TO BE REMOVED IN THE\ \ \ \ A N T SEASONAL NIGH WATER TABLE: 11.20 \ \ , LOCI TO THAT THE STORMWATER SYSTEM IS BEING INSTALLED AT THAT TIME. THE STORMWATER POND IS DESIGNED TO BE USED AS A SEDIMENT BASIN FOR EROSION CONTROL PURPOSES. THE POND MUST BE CLEANED OUT AFTER THE ENTIRE DRAINAGE BASIN HAS BEEN STABILIZED #4 BARS @ 12 O.C. AND PRIOR TO USE AS A WET DETENTION BASIN. EACH WAY 9. STORMWATER PUMPS ARE TO BE AVAILABLE FOR OPERATION AND 6" #57 WASHED STONE MAINTENANCE AND EMERGENCY DRAINING OF THE POND AND DOCK PIT. ,JUNCTION BOX VI TH WEIR 10, ALL RUNOFF FROM FUTURE DEVELOPMENT MUST BE DIRECTED TO THE NOT TO SALE DRAINAGE SYSTEM OR TO THE STORMWATER POND FOREBAY. INFILTRATION SYSTEM CROSS-SECTION NOT TO SCALE PROPOSED PIPING SYSTEM U.STREAM BASIN D.STREAM BASIN PIPE LENGTH PIPE SIZE D.STREAM INVERT U.STREAM INVERT PIPE SLOPE PIPE TYPE U.STREAM RIM MINIMUM BASIN SIZE U.STREAM RIM TYPE 9B-1 Forebay 38' 48" 7.62' 7.75' 0.33% H.D.P.E. 18.9' 5'-0" I.D. JUNCTION JB-2 JB-1 125' 48" 7.75' 8.16' 0.33% H.D.P.E. 18.9, V-0" I.D. JUNCTION JB-3 JB-2 239' 48" 8.16' 8.95' 0.33% H.D.P.E. 17.5' 5'-0" I.D. JUNCTION JB-4 JB-3 91, 48" 8.95' 9.25' 0.33% H.D.P.E. 17.5' 5'-0" I.D. JUNCTION DG-5 JB-4 103' 42" 9.75' 10.09' 0.33% H.D.P.E. 17.05' 4'-6" x 4'-0" DOUBLE DG-6 DG-5 155' 42" 10.09' 10.60' 0.33% H.D.P.E. 17.20' 4'-0" x 3'-6" DOUBLE JB-7 DG-6 99, 36" 11.10' 11.43' 0.33% H.D.P.E. 18.15' 4'-0" I.D. JUNCTION DG-8 JB-7 131' 36" 11.43' 11.86' 0.33% H.D.P.E. 17.35' 3'-0" x 3'-0' SINGLE DG-9 OG-8 110' 24" 12.86' 13.22' 0.33% H.D.P.E. 17.55' 3'-0" x 3'-0" SINGLE DG-10 DG-9 114' 24" 13.22' 13.60' 0.33% H.D.P.E. 17.75' 3'-0" x 3'-0" SINGLE CI-11 JB-7 48' 15" 13.77' 14.01' 0.50% H.D.P.E. 17.50' 3'-0" x 2'-6" SINGLE CI-12 CI-11 48' 15" 14.01' 14.25' 0.50% H.D.P.E. 17.50' S-0" x 2'-6" SINGLE JB-13 DG-9 64' 24' 13.22' 13.43' 0.33% 1 H.D.P.E. 18.25' 3'-0' I.D. JUNCTION YI-14 JB-13 27' 18" 13.43' 13.52' 0.33% H.D.P.E. 18.25' 2'-0" I.D. YARD INLET YI-15 YI-14 61' 18" 13.52' 13.83' 0.50% H.D.P.E. 18.25' 2'-0" I.D. YARD INLET YI-16 YI-15 92' 18" 13.83' 14.29' 0.50% H.D.P.E. 18.25' 2'-0" I.D. YARD INLET YI-17 YI-16 82' 18" 14.29' 14.70' 0.50% H.D.P.E. 18.25' 2'-0" I.D. I YARD INLET DG-18 JB-4 180, 12" 9.75' 10.65' 0.50% H.D.P.E. 17.05' 3'-0" x 2'-6" SINGLE I..EC - 21 20 PRO. PAVEMENT DGa�� EXST. PROPERTY BOUNDARY EXST. ADJACENT PROPERTY EXST. MAJOR CONTOUR EXST. MINOR CONTOUR EXST. STORM DRAIN PRO. DRAINAGE BASIN PRO. DRAINAGE FLOW PATH PRO. FINISH GRADE SPOT SHOT PRO.CONTOUR PRO. SECURITY FENCE PRO. EASEMENT PRO. CURB PRO. STORM DRAIN PRO. STORM DRAIN INLET PRO. STORM DRAIN LABEL PRO. FLARED END SECTION PRO. OUTLET PROTECTION Total Project Built Upon Area Calculation OVERALL, PROPERTY AREA: Total Property Area = 604,118 s.f. Total Wetland Area = None Total Project Area = 604,118 s.f. IMPERVIOUS AREA: On -Site Buildings = 70,365 s.f. On -Site Streets = 5,815 s.f. On -Site Parking / Storage = 73,300 s.f. On -Site Sidewalks = 4.500 s.f. Other On -Site (Future Parking as Shown) = 107,605 s.f. Other On -Site (Future Develop. -I & -2) = 132,580 s.f. Off -Site = None Total Impervious = 394,165 s.f. OVERALL PROJECT DENSITY: 394 165 s.f. (100) = 65.25% 604,118 s.f. REV ADDED INFILTRATION TRENCH AND JRC 2 DETAILS FOR DOCK PIT DRAINAGE 1 /6/10 REV ADDED ACCESS ROAD AND JRC 1 SUPPLEMENTAL DIMENSIONS 11 /24/0 REV. DESCRIPTION BY Raj REVISIONS 0. .,� 4 "+r. O •1. p Fi• AL " 'lo t art jf• °�" .•`�� OWNER: Hwy 421 Properties, LLC 1508 Military Cutoff Road, Suite 302 Wilmington, NC 28403 Phone: (910) 395-6036 DEVELOPER: McKinley Building Corp. 3807 Peachtree Avenue Suite 200 Wilmington, NC 28403 Phone: (910) 395-6036 Coastal LandDes,jgn, PLLC Civil Engineering / Landscape Architecture / Construction Management P.O. Box 1172 Phone: 910-254-9333 Wilmington, NC 28402 Fax: 910-254-0502 DRAWN J. CARMINE PROJECT 650-04 NUMBER DESIGN J. CARMINE CHECK J. CARMINE SCALE 1" = 40' APPROVED: J. CARMINE t DATE 6-JUL-2009 FILE NAME : Wolseley, N.A. U.S. Hwy 421 Project 1 1 • Proposed Stormwater� g Mana ement and Grading Plan JOB NUMBER SHEET NUMBER 650-03 _-TSW-Ol MAINTENANCE MANHOLE (CENTERED) 36" HDPE SPILLWAY BARREL INVO.: 14.40' FES: 14.05' 5'-0"x5'-O" PRECAST CONCRETE BASIN, OR APPROVED EQUAL, WITH CUTOUTS AND TRASH RACKS INSTALLED ON (2) SIDES AS SHOWN IN THIS DETAIL #4 REBAR TRASH RACK AT 4" 0. C. E. W. (TYP, BOTH OPENINGS) OR APPROVED EQUAL 3" PVC SCREW PLUG ELEV.: 16.00' 3" PVC AS NEEDED A r r t + _ r ♦ f ♦ 1<:�rrl! 03 3" PVC TEE _ r DO IA 23 ANT�fi I 3" PVC AS NEEDED LA = PIRO DLENGTH �4A���1 3" INLET SCREEN W 3 APRON WIDTH s�MIN N 12" OF 3 PVC INV.: 13.50' D = .APRON DEPTH PLAN INV.: 14.50 INSIDE OF BOX TO BE SLOPED NOTES: WITH GROUT TO ENSURE SEE APPROPRIATE SCHEDULE FOR DIMENSIONS DRAINAGE TO SPILLWAY BARREL 1. LA IS THE LENGTH OF THE RIPRAP APRON. MAIN POND RISER DETAIL � 6'-4"x6'-4"x8" ANTIFLOATATION 2• D = 1.5 TIMES THE MAXIMUM STONE DIAMETER NOT TO SCALE BASE TO HAVE #4 REBARS @ BUT NOT LESS THAN 6" 10" 0. C. E. W. W/3" COVER 3. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. VARIASLE _- _---_ oro DRIVEWAY WIDTR -I Z� RIP —RAP AT FLARED END SECTION DETAIL fn _'z z� - 0Z NOTTO SCALE =T�pDm 7FIAILING DRIVEIIAY PIPE DRIYEIPAY PIPE 0,—2 - azo�� DRIVEWAY PIPE TYPICAL SECTION teat C1p� OF-LLOH� Cr 6 6:1 OP,FIA'TiEP Sy{�c 3" G: } 4a FIA7TER 5(.OP . Z O a rn _ 6 } « 6" MAX. t I - - g} ttJOINT m L � A� �B tD , 1 FILLER-- --�D-----B �- � �~ -" w C " �—: T1 J_-- — --� a y L L lb-1 TQLPIPE 1-3� PIPE— � i T� I a VARIES 5'-0" VARIES ---------^i T L p GROOVE INSLL TAATION TONGUE-INSTALLATIONp o -I Rrrtf 3: 1, VIEW z m rPIPE" COca DD LL Diw �D ! / adz 2mpr"-t- / / Cr QLUQ O I T Te ; ��PIPE ---�_---� L$" / Sa-- n' lw DISCHARGE CHANNEL DETAIL L s j rn H -'7 END VIEW / _ -1 W NOT TO SCALE 1 TZ PLAN VIEW CO / Z Q Z ir Pa X \ I W QU A �" •O m WET 1 OF 1 310.02 -- END TREATMENT DIMENSIONS D L W Ts TO 4" 4" Te A B 23" 1 4" 4" 6" 2114" 25" 30" 4" 4" 6" 27� 32" - - —! ISOMETRIC VIEW O- 5'-O"x5'-O" PRECAST CONCRETE o BASIN, OR APPROVED EQUAL NO1ES: ¢ #4 REBAR TRASH RACK AT 1. EACH WAY PIPE ESECTION USING s< REBAR SPACED 9" 4" O.C.E.W., OR APPROVED EQUAL EACH IYAY AND MEETT ALL NEOUIRE3O_NTS OF S1D. SPEC. 310. 2. CHARFER ALL EXPOSED CORNERS -3". S"ffET t 11F 1 liA A7 CURB AND GUTTER DETAIL NOT TO SCALE 1 /2" R 8„ El INV.: 9.50' OUTLET: 8.00' RE) �A 9 p0, 6,k• (�� BAD OAf� 6'-4"x6'-4"x8" ANC ANTIFLOATATION BASE TO \\ HAVE #4 REBARS ® 10" O. C. E. W. W/3" COVER FOREBAY RISER DETAIL NOT TO SCALE TEMPORARY SEEDING GRASS TYPE AMOUNT/ 1000 SF. TIME OF SEEDING INITIAL FERTILIZATION/1000 SF. MAINTENANCE r RYE GRAIN 1-2 LBS. NOV. THRU JAN. 25 LBS. 10-10-10 -NA- -NA- -NA- BROWNTOP MILLET 1-2 LBS. JUNE THRU AUG. 25 LBS. 10-10-10 -NA- -NA- -NA- PERMANENT SEEDING GRASS TYPE AMOUNT/ 1000 SF. TIME OF SEEDING INITIAL FERTILIZATION/1000 SF. MAINTENANCE BERMUDA, COMMON 1-2 LBS. APR. THRU JUNE 25 LBS. 10-10-10 MARCH - APRIL 12 LBS. 10-10-10 EACH 4-8 WEEKS 1-2 LBS. N. MAY & DEC, 1 /2 TO 1 LB. N. AUG. - SEPT. 12 LBS. 10-10-10 FESCUE, TALL (KENTUCKY 31) 5-7 LBS SEPT. THRU OCT. FEB. THRU OCT. 25 LBS, 10-10-10 FEB. - MARCH 12 LBS. 10-10-10 SEPT. - OCT. 12 LBS. 10-10-10 SERICEA LESPEDEZA (SLOPES) 1-2 LBS. MARCH THRU APR. 25 LBS. 10-10-10 FEB. - MARCH i j2 TO 1 LB. N. -NA- SEEDING SCHEDULE DETAIL NOT TO SCALE SHALLOW WATER: EMERGENT PLANTS BOTANICAL NAME COMMON NAME SIZE SPACING Canna lily 'Bengal Tiger' Canna 1 GAL 36" Iris virginica Blue flag Iris 1 GAL 24" Soururus cernuus I Lizard Tail SPRIG 24" SHALLOW LAND: HERBACEOUS PLANTS BOTANICAL NAME COMMON NAME SIZE SPACING Eupatorium fistulosum Joe Pye Weed 1 GAL 36" Hibiscus moscheutus Rose Mallow 1 GAL 36" Lobelia cardinalis Cardinal Flower 4" POT 36" NOT ISSUED FOR CONSTRUCTION TOP OF POND 18.4' "' 3- 35-0l 17.50 FMSL j CLASS-'B' RIP RAP / ENFORCEMENT / 1 DEPTH: 18" \\ \\ `\\ / STONE SIZE 1 EMERGENCY SPILLWAY DETAIL FILTER FABRIC NOT TO SCALE SUBSTITUTIONS ARE ALLOWED DEPENDING ON AVAILABILITY, SUITABILITY, AND AESTHETICS. HOWEVER, ANY SUBSTITUTION MUST BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO (DIA. + 12") MIN INSTALLATION. d. LITTORAL SHELF SPECIES LIST (z) 2'-0" sQ FOR MAIN POND Z=1_11M ,,OKT (CENTERED) AT NTERV TYP 6Ary nr- nttrl� PLAN FRAME GRATE & I10 t�k 1` 1 �uu®s 1 9' kt � SLR 1/4!'/FTFRAME & GRATE i IF REQUIRED VAIMS (SEE RAM) Ij SIDEWALK DETAIL FOOTING (TYP.) NOT TO SCALE 20 FT 1/4"/FT 1/4"/FT 8"/ABC ' RIM ELEVATION AS SPECIFIED IN PLANS THE EDGE IOF PAVEMENT ATION ACCESS ACCESS ROAD DETAIL (EOP) AT THE CURB INLET NOT TO SCALE AT 1 4" PER FT FRAME & G IRE IF REQUIRE i 6" - 2'-2„ ? -'-- 6" SLOPE VARIES SEE PLAN) FnnTiN(. fTYP 1 rI SECTION X Z 1 N u N� CoI SECTION Y CURB INLET DETAIL NOT TO SCALE TOP OF POND 18.4' 4" z N Q 4" DOUBLE GRATE PLAN 1.5" SF9.58 FLAN 2.5 BI DN ER C RIM ELEVATION AS SPECIFIED IN O $ ABC O O PLANS STORAGE PAVEMENT DETAIL NOT TO SCALE FRAME & GRATE OUTFLOW PIPE FOOTING SLOPE VARIES (SEE PLAN) _ 2" SF9 5A I ' 6. ABC © #4 BARS ® 12"O.C. EACH WAY 1'-4" (TYP. ) PARKING PAVEMENT DETAIL 6" #57 WASHED STONE SECTION NOT To SCALE DROP GRATE / CATCH BASIN DETAIL NOT TO SCALE PIPE EMBANKMENT SEDIMENT FOREBAY FOREBAY WEIR MAIN POND 10' BERM AROUND 4'x4' INNER DIM 5' FOREBAY BERM TOP OF SHELF ELEV.: 15.00' EMBANKMENT OUTLET 10' VEGETATED SHELF AROUND ALL OF MAIN POND CHANNEL ALL .: POND 1' t ELEV.: 18.0' MAIN POND RISER t 0' ALL OF POND: ELEV.: 18.4' ELEV.: 14.50' BOTTOM OF SHELF ELEV.: 14.00' STRUCTURE- SEE SHEET — TOP OF POND ELEV.: 18.4'_ — — — — — TOP (F POND ELEV.: 18_4' ON THISELEV.: 18.40' TEMPORARY POOL ELEV.: 16.00' 1 — TEMPC'RiRY POOL ELEV.: 16.00'—— // PERMANENT POOL ELEV.: 14.50 \' \ i 1 3 35' F 36" HDPE EMERGENCY PERMAN=NT POOL ELEV.: 14.50 OF 48RCP 520.3390 SPILLWAY ' " � \' � �. INV.: 8.00` ELEV.: 17.50' \ f 1>1 CLEANOUT ELEV.: 7.0 <X-\/ X\ \ BOTTOM ELEV.: 6.0'� \/p \\INV.:\ .50'\ \\ \ /\ /\ /\ /\ \ "'- "' SEDIMENT CLEANOUT ELEV.: 7.0_ — — — — — — \/ / \ \ \ \\ \ \ \ \ \ \ \ \ // / \ SCOLLJ4R AON PPE / /%\RIP RAP \ \ / \ 80TTO,t OF POND ELEV.: 6.0' / / / / /APRON APPROXIMATE LENGTH 55' APPROXIMATE LENGTH 30' APPROXIMATE LENGTH 230' /2/ / STORMWATER POND PATH OF FLOW CROSS—SECTION NOT TO SCALE NORTH w. NORTH, MANAGEM NT EXST. PROPERTY BOUNDARY '— — — — EXST. ADJACENT PROPERTY 21 EXST. MAJOR CONTOUR 20 EXST, MINOR CONTOUR F.XST. STORM DRAIN PRO. PAVEMENT PRO. DRAINAGE BASIN <__ PRO. DRAINAGE FLOW PATH Aftop PRO. FINISH GRADE SPOT SHOT --- 21 — PRO. CONTOUR PRO. SECURITY FENCE — — + — i — PRO. EASEMENT PRO. CURB PRO. STORM DRAIN PRO. STORM DRAIN INLET PRO, STORM DRAIN LABEL [� PRO. FLARED END SECTION PRO. OUTLET PROTECTION Total Project Built Upon Area Calculation OVERALL PROPERTY AREA: Total Property Area = 604,118 s.f. Total Wetland Area = None Total Project Area = 604,118 s.f. IMPERVIOUS ARF.,A: On -Site Buildings = 70,365 s.f, On -Site Streets = 5,815 s.f. On -Site Parking / Storage = 73,300 s, f On -Site Sidewalks = 4,500 s.f. Other Can -Site (Future Parking as Shown) = 107,605 s.f. Other On -Site (Future Develop.- I & -2) = 132,580 s.f Off -Site = None Total Impervious = 394,165 s.f. OVERALL PROJECT DENSITY: 394,165 s.f: (100) = 65.25% 604,118 s.f. REV ADDED SIDEWALK, ACCESS ROAD JRC 1 AND PARKING DETAILS 11 /24/0 REV. DESCRIPTION SATE Y REVISIONS ` A - X per. SEAL ° ° t,121®� r e Ril1.`k���,�`, OWNER: Hwy 421 Properties, LLC 1508 Military Cutoff Road, Suite 302 Wilmington, NC 28403 Phone: (910) 395-6036 DEVELOPER: McKinley Building Corp. 3807 Peachtree Avenue Suite 200 Wilmington, NC 28403 Phone: (910) 395-6036 0astal Land Design, PLLC Civil Engineering / Landscape Architecture / Construction Management P.O. Box 1172 Phone: 910-254-9333 Wilmington, NC 28402 Fax: 910-254-0502 Wolseley, N.A. U.S. Hwy 421 Project Storinwater Construction Details JOB NUMBER SHEET NUMBER 65 0-03 S W-02 I W, r� s .rr ,,,r' 4 .r► L1!1_I i j I= M0 A New Hanover County, North Carolina Coastal Land DesiqnPLLC Civil Engineering I` Landscape Architecture Land Planning / .,Onstruction Management NCBELS Firm License No: P-0369 P.O.Box 1172 Phone: 910-254-9333 Wilminaton, NC 28402 www.cideng.com Fax: 910-254-0502 Hwy 421 Properties, LLC 3807 Peachtree Avenue, Suite 20t, Wilmington, Phone: (910) 395-6036 McKinley Building Corp. 3807 Peachtree Avenue, Suite 200 Wilmington, NC 28403 Phone: (910) 395-6036 LOCAMN MAP ©a� NOT TO SCALE SHEET INDEX SW-01 PROPOSED STORMWATER MANAGEMENT AND GRADING PLAN FOR PHASE -I (AS PERMITTED: SEALED ON 21-APR-2010) SW-01A PROPOSED STORMWATER MANAGEMENT AND GRADING PLAN FOR PHASE-11 (RE i 7SED: SEA LED ON 24-SEP-2010) SW-02 STORM`VATER CONSTRUCTION DETAILS (AS PERIITTED,- SEALED ON 21-APR-2010) C AR��ffii AL , . _ 3 a cSa APPROVED $9= CAROM EWIRO MANAGEMENT CO MI Olt WATER 01 ocu.'- cil RECEI 79D OCT 0 Z 2010 I BY: SLIGHTLY INCREASED THE SIZE OF THE JRC REV SOUTH PARKING BAY. DECREASED THE 5 FUTURE IMPERVIOUS ALLOCATION SO THE TOTAL PROPOSED BUA REMAINS THE SAME. 09/24/10 ONLY SHEET SW-01 A WAS MODIFIED. UPDATED SITE PLAN ON SHEET SW-01. JRC REV ADDED PHASE-11 AS SHEET SW-01 A. 4 THERE IS NO OVERALL BUA MODIFICATION OR CHANGE TO DETAIL SHEET. 04/21 /10 REV FIXED TEXT ERROR IN PIPING JRC 3 SCHEDULE BETWEEN JB-4 AND JB-3 01 /27/10 ADDED INFILTRATION TRENCH TO TREAT JRC REV RUNOFF FROM THE DOCK PIT AND TRENCH 2 DETAILS TO SHEET SW-01. THERE ARE NO CHANGES TO SHEET SW-02. 01 /06/10 ADDED ACCESS ROAD AND SUPPLEMENTAL JRC REV DIMENSIONS TO SHEET SW-01. 1 ADDED SIDEWALK, ACCESS ROAD AND 11 /24/09 PARKING DETAILS TO SHEET SW-02. 01 MIP RP ARON_US_HG85' OF 1 C .�--- _ - ---RCP 00.25% .-________-- --- WIDTH • F' _.._._----------------- _ Of_T'8""_"- THICKNESS: 12" _ _ __----- - ---------.- - ---__. ----- �`�` RCP ®0.25% --£LDS: ____ -- ____ ---- --- -`- _-__ --- --- ----� - -- -- - - -- - - - -- _______- - - - _ - - - - - - - - - - 16- - __._ - - - - - ------ 1C-- 6 EIR S32 took -1 J -- - _ - S I INV.: 13.85 El R _------r' : -- - rwrArr�rrs�w�_r.�r. r�w�_n"�n"orrre,'- - ___1 t F PROPOSED CONCRETE DRIVE -OVER CURB rt" GRAPHIC SCALE BARRIER 1 CURB ENDS AT -- 40 0 20 40 80 160` CURB INLET-12 M Msr.��rrr��rrrr f-WA ( 1N FEET) 1 inch; = 40 ft. PAVEMENT 1 DIRECTIONAL Future Dey,e"lopiTient-2. STRIPING 98,300 sf Impervious' \ 1 Future building must have a FFE of 11 , 18.65' or greater and the grade must be \ 1 raised such that stormwater discharge,/ 1> from the developecfarea does not drtin - v towards the water supply well -All drainage must be directed towa/rds the forebay or into the 1 e ,s stem 1 / y P�P ; �' 1 -PROJECT BOUNDARY/ 1 DRAINAGE BASIN 1 ,/ SETBACK 1 PRIVATE WATER 1 `6 SUPPLY WELL II'\ EASEMENT 1� PROPOSED / �. WATER WELL 1 O i 1 / 5' WIDE 16" EARTHEN BERM 5-0" OFF EbP CA I I \ Al 1 ELEVATION: \ INFILTRATIQN TRENCH 1 1 l DRAINAGE BASIN. 1 18.65' ! \ NOT INCL'V ED IN PONBASIN i 4' ELEVATION - \ i1 e FILLED TO AT -; CONTOUR TO BE LEAST 14.50 1 w 1o0 ./ , SETBACK,. -2 1s / ♦'"' y Js i 1 i 17 IS QED ---_ 14.515- - - - - - - � 10 I 12 1 I 6 73' I �� I I " 1 3 231' .�-1>1 52' L`F. OF ��►� c° I . - ` 48" RCP Main Pond c"'.1 -� - ( INV. 8.0 ,1 I' STORMWATER-16- R-AI - - D � IMAGE EASEMENT STORMWATER 1 (\ a 7 6 - - i= - DRAINAGE EASE 1 ' ! \ � I 10 \ 11 12 1 _ _ _ 13 i --- 0 Total Project Built Upon Area Calculation \ OVERALL PROPERTY AREAI j' \ Total Property Area /'' = 614,884 s.f. Total Wetland Area j = None Total Project Area / = 614,884 s.f. / IMPERVIOUS AREA: On-SiW-fJl uildings = 70,365 s.f. On -Site Streets = None On -Site Parking / Storage (Phase -I) = 67,050 s.f. On -Site Sidewalks i = Other On -Site (Dock Pit I Trench) = 4,500 s.f. j 6,250 s.f.1 Future On -Site Parking (�'o Pond) = 122,700 s.f. � Future On'Site Developments (To Pond) = 123,300 s.f. -Off-Site = None I Total Impervious = 394,165 s.f. OVERALL PROJECT DFNS1`TY: 394,165 s.f. (100) = 64.10% 614,884 s.f. � r. r■ � � � rw � � • � r■ �1�ldtl�rl�0+td�19+��c�s � �.�' � .w � 1�_� � w � s � +/ t �1 i EIR 35' EMERGENCY \365.70' `, N29'32'k"W SPILLWAY 5'x5' OUTER DIM PRECAST CON'C. RISER SEE EIR ELEV.: 17.5' BASIN WITH TRASH LACK FROM ': - - - � � -_ ---StHEET-SW02-- -- 36" F.E.S.- SEE DETAIL #4 BARS AT 4" O.C.E.W AT 35' OF 36" INV.: 14.05' GENERAL NOTES: ELEV.: 14.50% INVO.: 9.50' HDPE @ 1.00% 1. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING UTILITIES, STD MANHOLE ABOVE AND BELOW GROUND, PRIOR TO CONSTRUCTION. FRAME AND RIM 2. CONTRACTOR IS RESPONSIBLE FOR DISPOSAL of ALL WASTE MATERIALS WEIR TO BE 6" RIM: 16.0 GENERATED THROUGH DEMOLITION AND GRUBBING ACTIVITIES. THICK, EXTEND FROM 3. SURVEY AND TOPOGRAPHICAL INFORMATION AS SHOWN ON THESE PLANS TO WALL, AND WALL CENTERED IN BE co HAVE BEEN PROVIDED BY MICHAEL UNDERWOOD AND ASSOCIATES FROM WILMINGTON, NORTH CAROLINA. THE BOX 4. THERE ARE NO WETLANDS ON THIS SITE. 6„ INV.:14.45 - 6" 5. THE DISTURBANCE FOR THIS SITE IS TO BE KEPT TO A MINIMUM. 12" PIPE 12" PIPE 6. ALL DISTURBED AREAS NOT TO BE STABILIZED WITH IMPERVIOUS SURFACE INV., 13.20 INV.: 13.20 TO BE SEEDED, FERTILIZED, AND MULCHED WITHIN 15 CALENDAR DAYS OF GRADING ACTIVITIES. FOOTING 3. Q• - Q 7. ALL STORM DRAIN DEVICES ARE TO PROVIDE POSITIVE DRAINAGE. iN� �Cn N1 8. EROSION AND SEDIMENTATION CONTROL PRACTICES ARE TO BE REMOVED IN THE LOCATION THAT THE STORMWATER SYSTEM IS BEING INSTALLED AT THAT TIME. THE STORMWATER POND IS DESIGNED TO BE USED AS A SEDIMENT BASIN FOR EROSION CONTROL PURPOSES. THE POND MUST BE CLEANED OUT AFTER THE ENTIRE DRAINAGE BASIN HAS BEEN STABILIZED #4 BARS @ 12"0.C. AND PRIOR TO USE AS A WET DETENTION BASIN, EACH WAY 9. STORMWATER PUMPS ARE TO BE AVAILABLE FOR OPERATION AND 6" #57 WASHED STONE MAINTENANCE AND EMERGENCY DRAINING OF THE POND AND DOCK PIT. JUNCTION BOX WITH WEIR 10. ALL RUNOFF FROM FUTURE DEVELOPMENT MUST BE DIRECTED TO THE DRAINAGE SYSTEM OR TO THE STORMWATER POND FOREBAY. NOT TO SCALE S� RIP RAP, APRON LENGTH: 18' WIDTH: 10.2' THICKNESS: 18" CLASS: 'B' I_2' ES INV.. 13.52 16---------- _------- --- _ 15-.------- - - - - FES INV__13.-32 - - - 14-------- _ -532"47'�32 _E_ 14- - El- -_ . .. rwaaasx,�dr,�smnaaw=a r s,.;�-w-..r� 62 EIRTI' L 1 • • :• is / �� JB-4 DOCK PIT DRAIN: 112' 16 OF 12" PVC @ 0.107. STD JUI�\ FOR I TRATIONOX YSTEM PIPE INV.: .20 BOTTOM: 11.20 (2' SUMP) ' 13.25W' x 1051 x 1.25'D� 5 INFILTRATION TRENCH SEE DETAIL 105' OF PERFORATED 12" PIPE @ 07. JUNCTION BOX RIM: 16.0 MENT IR INV.: 14.45 P E INV.: 13.20 SEE DETAI :THIS SHEET 28' OF 12" C P P @ 0.61% \ 1-1 353.59' N29-32'50"W RAP PROM DISCHARGE SWALE @ 0.33%. --,RIP J ENGTH: SEE DETAIL ON SW-02. WIDTH: 2.7' THICKNESS: 12" CLASS: 'A' \\\ X BOTTOM OF INFILTRATInzz ON TRENCH: 13.20 / " / BOTTOM OF 3WASHED SAND: / D. 12.95' :N 6,- EQU�L 1 ooFj P: 7.4 P: 17.8 UY: -;t 1 P: 7.6 OP: I I °° I : 7.9 0C- 18.1 : 8.1 OP: 17.9 oC: i8.4 oy` 1 LRIP RAP APRON OC: 18.3 OC: 18. 1 J 10 0 10 4 LENGTH: 8 r- I CD NDG-9 °1° DG-10 WIDTH: 6' ■ EOP:18.15 I THICKNESS--12' 9 ' BOC: 18.65 I CLASS:��' ,./' 80 l0 05 9 i 01 P: 7.4 OP: 1 .8 OP: 17.6 7.9 OC 18.3 OC: 18.1 E 6 Fm. �_ 13 HP EOP: 18.1 s r-, /1 Qs' J 6 FU _ - Flit 18 , `I (N / pr 1 \, GENERAL NOTES CONTINUED: \ RB TRAN ON TO \ 1 \ 1 .1. THE ROOF DRAINAGE SHALL BE DIRECTED ELEV. I 1 TOWARDS THE INLETS ON THE NORTH AND 1 \ SOUTH SIDE OF THE BUILDING. \ \ 1 2. AFL PIPE DRAINAGE EASEMENTS ARE 20' RIDE ' \\\\\\\\\\\\\\\\\ I 1 1 UNt ESS OTHERWISE NOTED. \ 1 I V) 3. THE �f RMWATER POND WILL BE PROTECTED \ ' FROM SEDIMENT THROUGH AN APPROVED \ ' 1 EROSION CONTROL PLAN UNTIL THE ENTIRE \ DRAINAGE BASIN HAS BEEN STABILIZED. ' 4. THE POND WILL 1\3\E\USED AS A SEDIMENT BASIN DURING THE CONSTRUIgTION OF THIS PROJECT. 1 I THE POND IS TO BE CLEANED OUT PRIOR T f I Proposed Building: 70,365sf Minimum FFE = 18.651 W FOUR EQUALLY SPACED z I INLETS OVER DOCK PIT DRAIN RIM: 14 6a,(EACH) INF)L/TRATION Tf ENCH \ DRAINAGE BASIN. NOT ,,,--INCLUDED IN POND / BASIN / / / RUNIOFF FROM THE EXST. PROPERTY BOUNDARY EXST. ADJACENT PROPERTY T. MAJOR CONTOUR EXST. MINOR CONTOUR EXST. STORM DRAIN PRO. DRAINAGE BASIN PRO. DRAINAGE FLOW PATH PRO. FINISH GRADE SPOT SHOT PRO.CONTOUR PRO. SECURITY FENCE PRO. EASEMENT PRO.CURB PRO. STORM DRAIN PRO. STORM DRAIN INLET PRO. STORM DRAIN LABEL PRO. FLARED END SECTION PRO. OUTLET PROTECTION 1 I o USE AS A STORMWATER POND. /; 5. A SITE PLAN UPDATE MUST BE"SUBMITTED TO / NCDENR ONCE THE LAND PLAN FdR THE FUTURE 1 1 \ DEVELOPMENTS-1 AND -2 HAVE BEEN I \ FINALIZED. THE TOTAL IMPERVIOUS ARt THESE TWO FUTURE AREAS MUST BE LES\T SHAN { I / ; 123;300SF. � / i I \ 6. THE SITt- PLAN FOR THE FUTURE LOT/STORAGE \ 1 EXPANSIOII OF 122,700 SF WILL BE CONSTRUCTED AS PHASE -II. HOWEVER, IT IS NOT PLANNED , �1) 1 TO BE CONSTRUCTED AT THE TIME OF THIS PERMIT MOQIFICATION. I t N' 29'29'40" W 64.05' \ 7. THE POND AND F BAY AND INFILTRATION o TRENCH ARE TO B \ CATED IN A STORMWATER ti I 1 EASEMENT. to 1 \8. FINISHED GRADE AT PERIMETER OF BUILDING IS TO BE AT LEAST 4" BELOW FINISHED FLOOR I REV UPDATED 1 I I \ ELEVATION EXCEPT AT THE FRONT ENTRANCE z � ' 4 SITE PLAN WITH NO / AND AT EXTERIOR DOORST06PS. THE SITE MUST (0 MODIFICATION TO OVERALL BUA HAVE POSITIVE DRAINAGE AWAJ' FROM THE / \ � REV FIXED TEXT ERROR IN PIPING r=, / 0 3 SCHEDULE BETWEEN JB-4/JB-•3 S ; 9. THE INFILTRATION TRENCH SHALL) BE INSTALD AND IMMEDIATELY COVERED WiTHIF1LTER FA RIC z REV ADDED INFILTRATION TRENCH AND A , v I TO P EVENT SEDIMENTATION. TH DOCK PITS SHOULD�BE PAVED PRIOR TO TH CONNECTION r 2 REV DETAILS FOR DOCK PIT DRAINAGE / GRAVEL ACCESS 1 .- .. ; OF THE QCK PIT DRAIN LINE TO THE WFILTRATi SYSTEM. ANY SEDI ENITA11ON I i1 1 ADDED ACCESS ROAD AND SUPPLEMENTAL "ROAD MUST BE crs°y ' ACCUMULA ON MUST BE FLUSHD OR CLFNEO DIMENSIONS D CROSSING , DIRECTED TO THE 1 ` I \ OUT PRIOR O THE PROJECT CO PLETION.� I REV. DESCRIPTION (12") DOCK PIT INV.: 13.22' POND ' I I # DG-18 INV.: 1 Q.4? / \ 4 \ E� \ 1 \ I I P I h REVISIONS SEPARATION = 1.3' / I� '3 y S f OS 8 L fir'. Ito �. 1 \ /Water �,6 Future Declo ment-1 _ T / a p _ _ _ _ _ ICD All Stake Tank (or Ap roved Eq a1) 1 1 \ 25,000 sf Impervious r 30'4-1" Diameter ;191-8 g" He' t I 0 I /' / 'S ' To be removed after future co ction to 1 I future'public water system. Sl oI Future building must have a FFE of 18,�5' _ ' 1 , I 1 }esign and location b ' thers. - v, -I or greater and the grade must be raised 1 3 � Y / � 1 such that stormwater discharge from the 'EMT stormwater pond does not adversely // Future Developlxient to Discharge J impact the grade or proposed development. / / All drainage must be directed towards the Drai>age to Existing Permitted / stormwater piping system. / 3 ( �, / Adjacent and as an Off -Site / Permso SW8 050217 I 20' STORM WATEJR- - 1 + / / (Not In Project) EASEMENT EXISTING WAFER SUPPLY ��•. �ii��������`�`�__`i-__��_i_� 3 1 WELL FOR BUILDINGi \ /SPRINKLER SYSTEM / �7 ( ' PROPOSED SPRINKLER / `r WELL EASEMENT 10'x10' / ELEV..5.00' / PROPOSED STORM DRAIN EASEMENT 10' OFF OF EXISTING 42" PIPE- �\-�-"-'-'---- \ EIR „ - 8" PIPE 1+I(ALE ' - - 254,51 - - ` Nq9 50 W !�✓' / PROPERTY 222.60' -- EIR i / N29'32 S5-W �INV. 13.03 INV.�12.9 EXISTING �/ BOUF DARY /� / 42" F.E.S. '" /\Xi\\1 . .. INFILTRATION SYSTEM CROSS --SECTION NOT TO SCALE 2' - -1 PROPOSED PIPING SYSTEM U.STREAM BASIN D.STREAM BASIN PIPE LENGTH PIPE SIZE D.STREAM INVERT U.STREAM INVERT PIPE SLOPE PIPE TYPE U.STREAM RIM MINIMUM BASIN SIZE U.STREAM RIM TYPE JB-1 -2 JB-3-2 JB-4-3 DG-5 Foreboy -1 tB-4 38' 125' 239' 91' 103' 48" 48' 48' 48" 42' 7.62' 7.75' 8.16' 8.95' 9.75' 7.75' 8.16' 8.95' 9.25' 10.09' 0.33% 0.33% 0.33% 0.33% 0.33% H.D.P.E. H.MP.E. H.D.P.E. H.D.P.E. H.D.P.E. 18.9' 18.9, 17.5' 17.5' 17.05' 5'-0" I.D. 5'-0" I.D. S'-0" I.O. 5'-0" I.D. 4'-6" x 4'-0' JUNCTION JUNCTION JUNCTION JUNCTION DOUBLE DG-6 -7 DG-9 DG-10 C1-11 Cl 12 JB-13 DG-5 DG-6 OG-8 DG-9 JB-71 G-11 DG-9 155' 99' 131' 110' 1 44, 48' 48' 64' 42" 36' 36' 24" 24" 15" 15' 24" 10.09' 11.10' 11.43' 12.86' 13.22' 13.7T 14.01' 13.22' 10.60' 11.43' 11.86, 13.22' 13.60' 14.01' 14.25' 13.43, 0.33% 0.33% 0.33% 0.33% 0.33% 0.50% 0.50% 0.33% H.O.P.E. H.D.P.E. H.D.P.E. H.O.P.E. H.D.P.E. H.D.P.E. H.D.P.E. H.D.P.E. 17.20' 18.15' 17.35' 17.55' 17.75' 17.50' 17.50' 18.25' 4'-O" x 3'-6' 4'-0" I.D. 3'-W x N-W 3'-0" x 3'-0" 3'-0" x 3'-O" 3'-0" x 2'-6" 3'-0" x 2'-6" 3'-0" I.O. I DOUBLE JUNCTION SINGLE SINGLE SINGLE SINGLE SINGLE JUNCTION JRC 4/21 /10 JRC 1 /27/10 JRC 1 /6/10 JRC _ 1 /24/0S REV.BY DATE OWNER: Hwy 421 Properties, LLC 1508 Military Cutoff Road, Suite 302 Wilmington, NC 28403 Phone: (910) 395-6036 DEVELOPER: McKinley Building Corp. 3807 Peachtree Avenue Suite 200 Wilmington, NC 28403 Phone: (910) 395-6036 Coastal Land Design,PLLC Civil Engineering / Landscape Architecture Land Planning / Construction Management NCBELS Firm License No: P-0369 P.O.Box 1172 Phone: 910-254-9333 Wilmington, NC 28402 www.cideng.com Fax: 910-254-0502 DRAWN 7 J. CARMINE PROJECT DESIGN J. CARMINE NUMBER ; 650-04 CHECK: J. CARMINE SCALE : 1" - 40' APPROVED: J. CARMINE DATE 6-JUL-2009 FlLE NAME Wolseley, N.A. U.S. Hwy 421 Project Proposed Stormwater Management and Grading Plan for Phase -I QCT 0 7 ZblQ JOB NUMBER SHEET NUMBER 650-03 SW-01 --_- ""_"� "` 42 __---._-___>-- __ _ _ � _ _ _� _ _ _ _ _ __-___ - __ , -- ___ __ - - - � -- . ____._-_._. .--_ - _-__ --- -- ---- - _- -IOW- - -__�__ .__ .__ - - --- --- -- - - ---� _ - - -= i /tip 1 __. _ . - -I1 -1 - ` - I-- _I _ . _,_ ::I _I-,.:. - ,- "I1-1 -16 0 1 PU B L C R -� _-�-- ,- -- -__ ____.- - __ , __ . .I - -- ,-_---_-_ -_ ___ - - --� - - - - - _____ - --- / \ \ - _ ------= - - --- - � -- ---- ------ - ~ \- , - �1 i /`� - - 1- i _ _ 2' 7 4- r'14- - Etv %�� � - ____- -_ _-_.---_.•_-------------._---_ - _ � _n.. . ----- - ---- -- I --- - ____ ",,- - - - 1 1_- - t=' - �- - _ -- ---- - --- -- - -- - 16- 15- ___.Iq 1•` � � 4 _J1-8.�'- - S�J2` ....\� � 6-- . __. . . . , -- _ _ . __- __ ____- _ __ �-.--. - ___ I -•--' - - -- -- - - -- - - EIR^ - 1 - _ 2" M 4- / --- - __ - -____ - - - - - - - -- _. - - 15 _-.___ _ - -- - __ _ - - _.. _ _- - - - - --- 1 r - - - _ EIR -- -17 - _ I I _ _- -- _ -� - 15- =-- - --------36T� S� 2 °46 18 E „_, ..�.�...__ ' A _- �., _ - 28 1 _ - .,.... '- V= an � ..........- -_'�-- - - - - _ - 1 - -- - - - - - _- �- -- -- - --- - i!!EIR 111m. ..r f a t W � - - .: - -�. F= - Arl :. - - - - - - r: r: z. � - tom - -r, - .4 CCn1 �-- -� �' -emr . i ; : . 1 1 If!..- • r .,��.......--� - -t .... ,..,-..�.�.-- -- rt �w ,� ,,,,..., w ,t, nt, ar• r r .... ess / _ -- -- - 1 ; ,� �, .... s .e ew _ _. _._ - ■ i ' / II 00 t / ( i 1� I. _, to to t� a� III I 1 ,, i� __ - - - ; e -P 1 -18\ `M$ Phase -I Ex. Parkin �-9 XDG-10 -rA 0 I 1 t `- 1 V' _ ' ' - �s.�` ��' 1 ) See Sheet SW-01 a ISSUED FOR AGENCY ' _ 18 17 / �qj 1 1 _ XCI-12 XCI-11 v �C1 D��SIGNERS PLAN C�gTIF AT10N -r�r��,„�,�r����w�~��~-� ISSUED �, ( W ONLY NOT ISSU i 1 ? --- -- --_ - _ EGG: 18.a 18 :.. :. I•1 I 1{i 10 ! f� F C STRUCTION I FG: i s.o ! �� i ! I'� J "f HEREBY CER+T(FY JHAT THIS PLAN NAS t3EEN PREPARED IN ACCOROA�E NIITH THE LATEST'NEW HANO�ER I.' 1, I 1 COUNTY ORDINANCES ARID:::STORM WATER DESIGN MANUAL.' / 1: •_:: ::' ` r 1 `, _ ._ .. _ --. -- - �,, � \� `f .y 6' •. - I CONNECT NEW 1 3 '` - - �\, N C A /? /j _ .. EOP: 17.9 �+ Fxr - _ -1 - . EDP: 18.15 STORMDRAiN TO 1 ,\ Sf G N A 7U _ _ "'��' ', _ . .. _ __-_�_•q ��`, c - e /`�` !:.. tFM r xJB�13 - - - - - .. -11' r / ! _ - -, . . �` � •OAF S, /©-, '* • . . .I''.�: FG: 17.9 ` ... - - 4T . 'Q' t Fv EXISTING DROP _J . 1 PRINTED NAME AND Tl - �__' 46=►��y,• E� ' `� �y'� \1. XiB�7 I r B tf� GRATE BASIN 1;1 ZZIr • .l: l' I e INV.: 13.80 11 DATE: - _ - lei-' Qi _ - �` I y6 . \ I •' : Phase-�II ` �1.°►0 1:.1` so o , ^/ ! a I \ \ \ 1 REGISTRATION NUMBER: _"ad l �d4 `, �80 \ s '` ' 1 :1 . ® ( ,� t `y \ I ON U BER: _11-- -19 ( _ \ \ I V '.:.• \ .� E . �i �i�`° - N si(i> x ATCH GRADES V G1NE;i _ :L.I. ` - • ew�pa�i Phase -I � � � \ Stt' e Y -" /X d.°� �. c� � P. , .. g .. I'' i_. Parking I I \ % As halt: and 1 " J 11! ARE / - PROPERTY OWN OWNER'S CE T!FI�AT19N /�EIa � ... . . . ........... .. .... \ ::.. i . , . i tT 6% o? '... I N \ \ I AS TO BE 1' DROP GRATE447 , :::..� ::: See Sheet STRIPED I \ ! ; I:. i I.Cr:1a co CURB INLT #14 1 "i (WE) HEREBY CERTIFY THAT I (WE) AM (ARE} THE CURRENT OWNER OF/THE PROPERTY AND T)i�T UPON 00 1ZIM:.�'.7..Zfl'••*-�� �% ._ _ 1�T- 1(0RIM: 17.90 �j \ ' RECEIPT OF "AUTHORIZATION -TO -•CONSTRUCT" AND CLEARING, GRADING CONSTRUCTION OR DEVEtOT UPO, , .. I _! • (n ' \ I1 WILL BE PERFORMED !N ACCORDANCE NTH THIS/PLAN AND THAT THE APPLICABLE ORDINANCES AND RULES OF INVO:..13:.70• ' - .� SW �� I . -• INvO.: 14.39 \ 1 / NEW HANOVER COUNTY, THE STATE OF NORTH/CAROLiNA, AND THE,FEDERAL GOVERNMENT AND ITS AGENCIES I \ I1 WHICH ARE HEREBY MADE PART OF THIS PLAN. AS THE OWNER, ,!' (WE) ACCEPT FULL RESPONSIBILITY FOR : \: - 1...1 • EDP: 17.7 I ! N. .. \ l 1 FG: 37.7 .11 \ I THE CONSTRUCTION AND OPERATION AND MAINTENANCE OF THE/kOPOSED FACILITIES. I (WE) WILL NOT I� I ' _ 1 ATTEMPT TO TRANSFER OF THIS RES iBI WI OUT THE ,WRITTEN AU iZATION OF NEW HANOVER \ \ :. ...': I :. I .. . .' I \ \ 1 COUNTY" I olo . : ,:.\ LEA """'-' •� -- -�-•-� EXST. PROPERTY BOUNDARY - ' - • - ' - EXST. ADJACENT PROPERTY 20 EXST. MAJOR CONTOUR - - 21 - - EXST. MINOR CONTOUR EXST. STORM DRAIN - . fi / . �� 1.\ ' .� So . } i XDG 6 tt } I �tj°i° r I \ \ 1 PROJECT � 1 � : f,. Q 1 C� h ' 1el SIGNATURE: j 4n i..1` t I . . o \ 1 $OUNDARY/ %'� I ) : o.:.. , _ .. ':'.:.I _ •:' ,. .:.':..:. • :': 11 DRAINAGE BASIN PRINTED NAME AND TITLE: __! !C .__ � I 1_._ IC4, `.: • '�` , ;; ' '< 1 I I I \ . \ Phase -II \\ I I •�-- , = ' ®, DATE: �- 27- / -1. o: i:' { ': \ New Expansion i 1 / / �" GATES.. WkTH :.14 ' I ( i I. I : ~ ! tr p \ ./ ; - 1.... MATCH :.i: j �► I 1 ; ; v°° -- EOGi 19.0 = WIDE• MItViM'Ul+ll: GRADE 1 I I i \ B+6 ABC \ - -- �. •: .. L:1. I ' /- ' 2 SF9 5 �_-._- -- 6' HIGH CHAIN -LINK --� ! FG: zs.o /. :� ;.. S ( ( HpE01' I \ N11 1 FENCE WITH 3 STRANDS :i' w. :. ,.:. :i'1. (TYP) 1 I Phase -I I I is:4o • . i \ y 1 OF BARBED WIRE (. YP) :...�- , (-� 1.,: ( 1 p Existing Building I I i T i / I 1 \ r' 1 I / 100 RADIUS - f.:.al :..:>� • ..•: ,:.:.: :1 .. 1 I 1 r. g n \ . 1':..1' __� i See Sheet SW-OI i PRIVATE WATER ,:..`:1; .." ;, 1 .., 1 �29'29 40 W 64.05 I1 % / SUPPLY WELL �, - ,^�� I {_ [.: 1 Ifs., l v - y o i (..: I''` ...:..,' EOP: 17.8 I O I'hase-TII 1., I G: 17:8 ! tMo. 1(( 2 r'-i i EASEMENT \ ! QBo. i . .:oe'i� ..1.: I: F 1. I v I I 11 ! � ! \ `O .: \ Fuhare TJevelopme�2 :� .'-;1' : � I . •i :. 1 4 I \ `° 1 94,240 sf Irnp rvIOUs " ' _ - J: I•. 1 I 1 0 1I 1 i \ : i ! EXISTING �;:.- Pavement`Sck_ou��: . .;�:.. :i. I 1 I I i --Jill i I I \ LI 1 ! WATER WELL - , 1.S0" SF 9::'S6 : ' ::�: I . j r I ! 1 I I F ture DeXelopment to Di\sph r ;. �I. 1 I r� age n �1 .,. I I f n I / N 1( ® z Bider. -I6. . ': ., { 1 I i , Ix► Drainage to Existing Permxted / 1 ELEVATION: n. 1 11 j ems. rr�. I t z 1 I C RAPT41C SC, ALE 9 �AB� .....�' 'bROP.,GRATE`#16:: ; �.( `I:. 1 i i I ._I #y r � 1 18.65 � ! =' � . i :.. .�'1`..J. �eOP:17,I I � � i w - i Adjacent P d as an Off-� to i / `. 0 20 ao 80 16o r -,,, :' I REV f;'- FG:17:G ('1111.�. ' iiwo: I 'i� :• .1.: � - � XDG-5 11; , . � ° i l Peat to 8 O'502171 � I I 1 , ono :. }.. I -- 11 i ! , 1 I i IN - ...,r ' (lrrr) Q �,' .o a�'� ' J. Phase -I Ex. ( 1, ( (Not �ri O eCt ! '` REV. ' II iN J , --. a: 1 `'~ I 1 inch - 40 ft:'"" "` - �' I p, 1 \ i f I f I i; Parking. i I 1 I( v I, I i w: I J L See Sheet SW-U1 I I 1I 1 /VIA i GENERAL NOTES CONTINUED: ! i (^ _ o l: _ .. 12' SWING - I:I• :. J Al ! 1. THE ROOF DRAINAGE FROM THE NORTH SIDE OF THE BUILDING {S PIPED TO `'1- _� . w . , . 1•.- Eo�:17.9 ATG i ' 12 SWING ! ,� GATE {) �s n' !� INLETS XDG-5 AND XOG-6. THE SOUTH SIDE 'S ;' ` FG:17.9A I DE OF THE BUILDING DRAINS TO ! -y > I Eoe;:.1 . ' • : .:o' , - ES (TYP 11 !tom JUNCTION BOX XJB-i3. 1.;. : .- ,,, CON£GT. :NEVI' GRAD 28 GATE 44* 9. -T DRAT iV -.T� .: �': �. , 3i ESMT .. �. : .1 .�. - h 2. ALL PIPE DRAINAGE EASEMENTS ARE 20' WIDE UNLESS OTHERWISE NOTED. I --- . ------ -- , EXISTING. 17--' - __ __-- _-- ___ .__ - __-. _ __ __ -- iC JUNCTIONS -.�,� - 18 �; - - p� N - - r7 -- _-- - _ _. _ .._._ _._ -_- -- _-_ _- ___ .. _ _ - -- - _-- - _ ts- _ - - - - ,- .: \\ ! 3. THE STORMWATER POND WILL BE PROTECTED R i- �� BOX, INV.:•:1.'f.91 -' `'�: •' . •: a FROM SEDIMENT THROUGH AN I / :..,; ®�N - '� O �%� �t ■t fit APPROVED EROSION CONTROL P \! r :s n ,- t LAN UNTIL THE ENTIRE t� XJB-1 r,; �, • , , , , : ,, � , , r., . .Y - � • .,-. , ,. RE DRAINAGE s -7 ;r .t. „i. Y: r� �,;e. ,• t�, ;rr ,c .r.. t=,t t^ .1, .� �. '� GE BASIN HAS i U ,' - s i.tr. :4. ; w t •.� -. - , . 1 BEEN STABILIZED. _ M �. I �"' _.._ ,;'.\ � / _ - -- _.___ _-- _ -- -.-- _-._ __ _. _-- _ _...__ _ _ - .: _•"-- -- -- - -� \ �1 .... .. :• ..'• .. :, .•.. cP - .. � p 4. THE POND WILL BE USED AS A SEDIMENT i ! .-� - I4.s = -. � / ;1 ; , I < : �' i ::: BASIN DURING THE CONSTRUCTION (: __ _ _._ __ i -- \ OF THIS PROJECT. THE P - - . I ------- ------- -._. ------------ a o :,'•:' I- POND IS TO 6 1 i - _- - = I 1 (, ! (� 14.5 , Ii.. , •� ,, E P:17.5 ,� Water E CLEANED OUT PRIOR TO USE AS A 11 II �r-- - . - - I 1 . ( l ( I f ------- -.-------- - I O °�q :: F I N STORMWATER POND (�-"=_ #`' Il I I _. _ - - - -- . - _- - I , . ! I CONNECT`-'AbV. STORM�RA�N'. . � � 1$ / � 1 1 i I- -- 1 I - - :_ -. _ _ : - -- - -- - -- - I , off.: .•� 17 Tank -- i I I'r1J`�_,:___, II! I I I -- - -- - --. : -.. __- _ �! I i1 ;I 'T :.. ..':.�� :�.....'' Z. . I �_ ,� o !+ it --- . Ib EXiS1`ING JUNCTl.ON•.'80X:... ., �.. t�:: ': } . 1 - - - - - _ 5. A SITE PLAN UPDATE MUST BE SUBMITTED T N D N 1 I i II _._. - --__ _ ! �, ,IIi.I, iII I ; i - ---' - - - -- - - IG -- - - - ._.,-- - - - - ) 1 ! ` I, '''.~I .,......} 6� HANOVER COUNTY tNGfNEERiN AND THE NEW I ; , I III , , I I I ( ._. _ _ _ . _ __. _ I , I :. ,..: , , : , ,.IN` .,:• ';(.2:OJ�' : ".•. / G DEPARTMENT ONCE THE LAND PLAN FOR i I ------ _ _----- tI. , sI): ;. 1 j i I I I ; I I i i I ; - ._ .._ - - ; _ 11i, I :. ;�: \ - S BEEN FINALIZED. THE TOTAL IMP III I _ -- .. _._ _.... -...- - - - - -- - I I i ( , : =.: ' ;:. �' / IMPERVIOUS AREA FOR PHASE--•111 III I !1.L � ,� . I I - 1 IiI Ii _ __ _ -- ------------, I .I I PHASE i!I HAS 1 :' \ t CONSTRUCTION MUST BE LESS THAN OR EQUAL TO 119,240SF. THE EXISTING I : 1 i ! 111 111; «3 *-, �(1 III I ! , ; i ! I ! I , I ? . ":..' .: ' ... :. : `r >: _ \'; . • '�:.:L I / STORM DRAINAGE SYSTEM WAS (, ( I II ; ; I : • . I ! ! . . Phase ii ,-.. ' : p.. i3G Is' • . .r \ / 3 S DESIGNED FOR AN ADDITIONAL 25.000SF OF i 1 i i Ili ! I I *� C� i Il , ( I ; i j I I i ! I I I ' ` , ;� \ IMPERVIOUS DRAINAGE FROM PHASE-tll TO BE DIRECTED TOWARDS - I I. I sr / 1 W DS DG 15. I. :III i.l. , ; ;io' ! I, I ,,I ( _ f �'.:. `..I __-_ 1 i t I _ , :! , i 1 I , , I ' I I , : i I Ne.*.-.Ex ,a�1s'IQ21:. "'; -. . •.. • ' :: . ..., ., I. I - - - _ - THE REMAINING PHASE-iU IMPERVIOUS MUST BE DIRECTED TO THE FOREBAY 1- III, ..I I. 1+;! lIt I I I t (I Q I , ,^ : I , , I f ! , I •• " : ; ESMT / i BY A SEPARATE STORM DRAINAGE, OR CONVEYANCE, SYSTEM. i i i I i I' , I1 i �, 1 1 1 I I I , o oP• GRA'�B. is: . �., Ph i I 1 +n 11 1 i t -, I I I . , I ! ; _ ( 13a1ttra ea�r�l ;i.. ase-III 3 t �I I . I : i . J ; I I i : i i i ; , I i I I I ' Phase -I X. M�IZI P0111£� 1 I i I III I I - :'`... ..:: a_1 .. _ . !, ... M:.t7.U0..; �"� �' / 6. THE POND AND FOREBAY AND IN 1 i iI 111 I j N ' ( I I ! I I 1 ; I I i ! I , , E I ; i - • - . - .. .• ,: : I FILTRATION TRENCH ARE TO BE LOCATEb INI I I I y i I I I iI ; I- I I I, i I s I i I I1. ' :�. IM�Q.;:12,5Q .:. p A STORMWATER EASEMENT. t : Future Development- f i 1 I _l (I 1 I W I ; I ; I i See Sheet ,_�!-O 1. 1 (6 I i i p: :..:r/1 I II I( -i 1 I i 1 :Q.. e ., t ;.. H .. :..,:' ..:,::. :...: (( 2 i i i 1 i i i.-, : I I C/2 1 :. - , .. 00 sf rviou :. i I- i l ( i I ' ' _ ! I 1 i , I i I I ; , , I . .. . • . , � . ,.. • .. .. ...., :: bAi, QQ i tpe S ! / 7 OF BUILDING IS 4" BELOW FINISHED FLOOR { j S 0I / : FINISHED GRADE AT PERIMETER III I i i I y I I III I I I i i i iR I ! I : - • �': •. .;,; : , �, ELEVATION EXCEPT AT THE FRONT ENTRANCE AND AT EXTERIOR DOORSTOOPS. !, 1 1 i l 11 c. r, * r;, t .:r I t'; r! t ? i ! , I I ! ' , ` :.: . ''': . : , ... . . - / THE SITE MUST HAS POSITIVE DRAINAGE W I I I tt3 I 1 , I ! , • .. j ( AWAY FROM THE BUILDING. i I I I I i I I_ ' 11 I I I I! t: `` .. _ t- t•:. 1 EXISTING 1 1 I C� I: I , i I .. .. ''a I. I .� I . 1 I I I I :. ,: I i t''! • III I � � I � � , ff .. __...- - - --- -- -- -- -- -_- ---- - - _- -- -- ...- -- - - - - � , I i t -' .:'� . '. � . • •.. ,.. . �` ;. ,. :• : ,'`�•�- •. ':: ` : � � �•' r. / S. THE INFILTRATION A-+ I I I i ; , , _ I • , } ;....•.: ' -.. '. : • :... •..; WATER WELL TRENCH WAS INSTALLED AND IMMEDIATELY COVERED WITH 1 j i I ( i i I i I i ;III ._ -- --- _ - .a I i I I . I EGG. i8.1 : ' .. - '+� . ` FILTER FABRIC TO PREVENT SEDIMENTATION. THE DOCK PIT W II I I I !! i. _ - --- - - -- - ----- I RIOR : i ( I I I I - - ---- - - - - 9 -- - -- -. - . - -- - - - - - - - - -.- , i I f i FG; 18.1- :. . ':.': , .. ,; .. '- . " \ :` :.' .., . ., :' :.. 1.. ` .. / ,f T PAVED P 1 Ii I( Ii I ( I l I I . , i �_. ..__ _._ _- ___it!_________ --- _... __--- -_ - - 1 ; ! . I : II ! 1$, : . :. : •,.: :•..\..., : I EOG:17.7 3 0 THE CONNECTION OF THE DOCK PIT DRAIN LINE TO THE INFILTRATION I I , 1 l _ _ t (f 111 , - - - t ; --- --- -- - -- -- . - -- - - - ---- l 'E ( ; ! FG. 17.7 - - _. -.. , I , I ! i l ' - - --- i , - - -- -- - - - - - ° 1 ! Y ON WAS FLUSHED AND CLEANED 1 i 1 I III I i i . l_ _ I i I - - - _ _ - _ _ _ _ _ �� ��I i i CERTIFICATION. - :.. . , . ... .... ! ( __ .-. I.._: _._ _._ - -- - - - -- - - - = I 1 r-s.-a �- ws-� - - M-r"�-w-i ----s - - ��: -r-� a ar OUT PRIOR TO THE P XJd - SYSTEM. ANY SEDIMENTATION MULATI I II(I�_---__-----�I 11, -----------_- 1 i`�t' 17 I't`"'JI t. I �� _ =_ VA ,Z J ; I , ` 14 5 - -- - �- - - - - - - - -- _ _ _o i - - 17 18 - - - - - - - - - - - 1 9. THE STORMWATER 4ERTiFlCATiON DATED 4 20 2010 BY COASTAL LAND i ` - _ ih i -- - --� :.a:,.i _ --1C 4----- - - - - 15 15 1 p -t f f -- -- __ - - -- - - - _ -�- -- - - - - - -- - - - - - - - - - - ( PRIVATE RADIUS / / DESIGN, PLLC IS C1A�RENT FOR THE PHASE-1 CONSTRUCTION AND IS ON FILE _ __ __ _ .__ _._ . - _ -_ _. _ .__ . - - -- is ' - -- I,,. i.'._ -.. _ __ __ _- - _- -_ _ __ __ - -_ - - - - - - - - - - - - -14- - - - - - - - N RI WATER STATE. THIS PLAN SHEET DETAILS THE WORK FOR PHASE -II '," l,; / I ; , -- - (- - - - - - - - - - - / / / / CONSTRUCTION. PHASE -I{ IS CURRENTLY UNDER CONSTRUCTION. A NEW r;..��r........,...ee...R..,,,���...®.,��..��,�,�..�.��,.���...ra..��� ____-----i4---- ___ SUPPLY WELL ��� I> - - - - - - - - - (n EASEMENT / CERTIFICATION WILL BE ISSUED ONCE PHASE-11 IS COMPLETE AND PRIOR TO 25 ` ` / / -{ - _ THE PERMITTING OR DEVELOPMENT OF PHASE-fl . \ ` \ fir - •re>a�n. <r �..rr..... �.. iC,. \ � - - '-- -- - -4..., 1•�� ^_ - t it a�.eP-bases.. <.ww: ta,Tl�,.1 Mtn, tn,e� sra �. �. rnY ...t��r♦ �� ylln .` _. �- -- "- EiR -- _ .--- - _,_._- _ - -__ -r--- _...._ - - 365.70 N29'32 54'W -'R 353.59' N29'32'50"W _- \ EIR \� \ , / ---�-= " .` "„".-�'° \ \ -- 254.51- - - N �332'S0"Vy -' 2 60' - - , , - --EIR \ -1-1 \ \\ T4 -- - 2 N293 �----_ PROPERTY 2 . % �0 � \. \ 7\ \� / BOUNDA /' / .01 - SEE SiTE PLAN GENERAL NOTES: 1O' MAX -'p- #9 GA. WIRE WIRE FABRIC (3) STRANDS OF 1, CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING UTILITIES, TOP RAIL PIPE s�1 5/g" O.D. BARB WIRE ABOVE AND BELOW GROUND, PRIOR TO CONSTRUCTION. CORNER OR END1.1. CLIPS ® 1 -0 9 GA. ALONG TOP POSTS 02 Yz" O.D. _" � x � w ; 2. CONTRACTOR fS RESPONSIBLE FOR DISPOSAL OF AU- WASTE MATERIALS GENERATED THROUGH DEMOLITION AND GRUBBING ACTIVITIES. CORNER OR END 3_ SURVEY AND TOPOGRAPHICAL INFORMATION AS SHOWN ON THESE PLANS POSTS 02 Y" O.D. HAVE BEEN PROVIDED BY MiCHAEL UNDERWOOD AND ASSOCIATES FROM WILMINGTON, NORTH CAROUNA. TENSION BAR W BANDS -TRUSS ROD --- _- . 4, THERE ARE NO WETLANDS ON THIS SITE. - 5, THE DISTURBANCE FOR THiS SITE IS TO BE KEPT TO A MINIMUM. 6. ALL DISTURBED AREAS NOT TO BE STABILIZED WITH IMPERVIOUS SURFACE TO BE SEEDED, FERTILIZED, AND MULCHED WITHIN 15 CALENDAR DAYS OF GRADING ACTIVITIES. al \ /� #6 TENSION 7"\g iI. �/� ;<,i\\�- 11° / > \ !I I1 \ \\' {� f/\ \ 9GA. HOG RING a 7. ALL STORM DRAIN DEVICES ARE TO PROVIDE POSITIVE DRAINf�GE. 36" / /WIRE ' / %i/ \��� � . /\ # \� i f - II 11 :II 2'-0' (MAX) 11. 8. EROSION AND SEDIMENTATION 'CONTROL PRACTICES ARE TO BE REMOVED t- _: U U°' 02" LINE POST U I N. iN THE LOCATION THAT THE STORMWATER SYSTEM IS BEING INSTALLED AT �_ 02' LiNE POSTS THAT TIME. THE STORMWATER POND 1S DESIGNED TO BE USED AS A ALL POSTS TO BE SEDIMENT BASIN FOR EROSION CONTROL PURPOSES. THE POND MUST BE SET IN CONCRETE --,--I1011% -` '110" ALL RAILS & POSTS CLEANED OUT AFTER THE ENTIRE DRAINAGE BASIN HAS BEEN STABILIZED 12' TO BE SCH. 40 GALV. 12, AND PRIOR TO USE AS A WET DETENTION BASIN. --* STEEL PiPE 9. STORMWATER PUMPS ARE TO REMAIN AVAILABLE FOR OPERATION AND n CHAIN �j MAINTENANCE AND EMERGENCY DRAINING OF THE POND AND DOCK PIT. TYP . `� B � � ° I N LINK FENCE 10. ALL RUNOFF FROM FUTURE DEVELOPMENT MUST BE DIRECTED TO THE NOT TO SCALE I DRAINAGE SYSTEM OR TO THE STORMWATER POND FOREBAY, PROPOSED PHASE--2 PIPING SYSTEM U.STREAM BASIN CI-14 D.STREAM BASIN AG-10 PIPE LENGTH 117' PIPE SIZE 18" D.STREAM INVERT 13.80 U.STREAM INVERT 14.39 PIPE SLOPE 0.50% PiPE TYPE H.D.P.E. U.STREAM RIM 17.90' MINIMUM BASIN SIZE 3'-O" x 2'--6" U.STREAM RIM TYPE SINGLE DG-15 XJB-4 83' 30" 12.05 12.50 0.54% H.D.P.E. 17.00' 3'-6" SQUARE DOUBLE DG-16 XJB-3 129' ' 11.91 12.56 0.50% H.D.P.E. 17.10' 3'-O" SQUARE DOUBLE E24" DG-17 DG-16 130' 18" 13.05 13.70 0.50% H.D.P.E. 17,20' 2'-6" SQUARE DOUBLE : ;.. . [_11. `t.�I�i�-".. -,*I-.,.. PRO. PHASE -II PAVEMENT <__ PRO. DRAINAGE FLOW PATH PRO: FINISH GRADE SPOT SHOT +---- 21 PRO. CONTOUR PRO. SECURITY FENCE 1. CURB LINE PRO. STORM DRAIN 0 PRO. STORM DRAIN INLET DG-29 STORM DRAIN LABEL m m m r m r PRO. DRAINAGE BASIN Total Project Built Upon Area Calculation OVERALL PROJECT AREA: Total Project Area = 614,884 s.f. Total Wetland Area = None Usable Project Area = 614,884 s.f. IMPERVIOUS AREA: On -Site Buildings (To Pond) = 70,365 s.f. On -Site Streets (To Pond) = None On -Site Parking / Storage (To Pond) = 193,970s.f. On -Site Sidewalks (To -Pond) = 4;340s.f Other On -Site (Dock Pit -To Trench) = 6,250s.f Future On -Site Developments (To Pond) = 119,240 s.f. Off -Site = None Total Impervious = 394,165 s.f. OVERALL. PROJECT DENSITY: 1 394,165 s.f. (100) = 64.10% 614,884 s.f, Slight increase in size of the South parking JRC bay, changed the downstream basin for CI#14, and addition of a second water well. 9/24/10 DESCRIPTION REV,BY DATE REVISIONS ti ( f'Q��% !�.. I 9 (U ,.1 • •M. 1- 1 tZ4 t ., ail t 6 ✓� e n zz e s tltlll OWNER: Hwy 421 Properties, LLC 3807 Peachtree Avenue, Suite 200 Wilmington, NC 28403 . Phone: (910) 395-6036 DEVELOPER: McKinley Building Corp. 3807 Peachtree Avenue Suite, 200 Wilmington, NC 28403 Phone: (910) 395-6036 Coastal Land Design,PLLC Civil Engineering / Landscape Architecture Land Planning / Construction Management NCBELS Firm License No. P-OM P.O.Box 1172 Phone: 910.254.9333 Wilmington, NC28402 www.cideng.com Fax: 910-254.0502 W 0 seley, N.A. U.S. Hwy 421 Project Proposed Stormwater Management and Grading Plan for Phase -II JOB NUMBER 650-03 SHEET NUMBER SW-01A ocT 0 7 2 36" HDPE SPILLWAY BARREL INVO.: 14.40' FES: 14.05' MAINTENANCE MANHOLE (CENTERED) 5'-O"x5'-O" PRECAST CONCRETE BASIN, OR APPROVED EQUAL, WITH CUTOUTS AND TRASH RACKS INSTALLED ON (2) SIDES AS SHOWN IN THIS DETAIL #4 REBAR TRASH RACK AT 4" O.C.E.W. (TYP, BOTH OPENINGS) OR APPROVED EQUAL 3" PVC SCREW PLUG ELEV.: 16.00' 3" PVC AS NEEDED A r i ` . ma's•: � � � t V. `� '� ` 3" PVC TEE ► - 6 DO = PIPE DIA ANTIF 3" PVC AS NEEDED LA = APRON LENGTH lggTqT 3" INLET SCREEN W 3PXOPIPEI 0T MIN �0N 12" OF 3" PVC INV.: 13.50' D = APRON DEPTH PLAN egSE INV.: 14.50 INSIDE OF BOX TO BE SLOPED NOTES: WITH GROUT TO ENSURE SEE APPROPRIATE SCHEDULE FOR DIMENSIONS DRAINAGE TO SPILLWAY BARREL 1. LA IS THE LENGTH OF THE RIPRAP APRON. MAIN POND RISER DETAIL 6'-4"x6'-4"x8" ANTIFLOATATION 2. D = 1.5 TIMES THE MAXIMUM STONE DIAMETER NOT TO SCALE BASE TO HAVE #4 REBARS @ BUT NOT LESS THAN 6" 10" O.C.E.W. W/3" COVER 3. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. RIAOLE �M �'--- DRIVEWAY WIDTH Jy RIP —RAP AT FLARED END SECTION DETAIL 3! coOO /�— �_ _ 1_UR _FLgnER Stop _.. _ati MZnzp �� --LL�ESZ NOT TO SCALE L7pAADn-i y TRAILING ---- DRIVEWAY PIPE ORIVtIYAY PIPE O¢O �jS CI T Z -- �_= _-�_._ =�� APPROACH H U Z O= ZMZ�T DRIVEWAY PIPE TYPICAI__SECTION ���""'"'OFF--- il��,H yF'LLOJ p FIATTEP St,O14f ,j" B: 1_OR FLATTER O 2 N H 6 6 IL H z 6" MAX. 1 T --_� g„ ----- - 1 6" MAX o 0 JOINT D -r —f-^-----------� - 8 - D', FILLER 0 - B I A A U, --------- -- T-3 } r VARIES . n cn L _ b «I Te=--PIPE - - PIPE-' -� L_ —� 5 —O VARIES ---- r_ - --- - o a m GROOVE_INSTALLATION O70NClZE $NSTALLATION oU. M o /\\///� m M = SIDE__ VIEW PIPE y O U. Z M I - -I __-__ j---- O= O H y WI D -� - OUJ Q d a _� _ _ / / < W Z m --- I z DISCHARGE CHANNEL DETAIL p Z T� TB..J t+./ PIPE--�—�'i 'ice / %/ d n. W D o n L s ,1 END VIEW �' N m N ---- /:- = W NOT TO SCALE H /; j [I' n ci PLAN VIEW( ;%' / J J W -1 �{ -7 ':' .� O Q Z N Z LIJ Q U END TREATMENT DIMENSIONS H D L w Ts Tb Te A B m 15" 7'-6" 18" 4" 4" - 6" 17$3" 20 1s" 11 9'-0" 23„ 4" _ 4" 8" 21114 " 25" j EET 1 OF t - -- -� 310.02 24" 12'-6" 30 4" 4" 6" 27%B" 32 ISOMETRIC VIEW a a 5'-0"x5'-O" PRECAST CONCRETE W BASIN, OR APPROVED EQUAL ir 1. w....W PIPE END SECTION USING e4 REBAR SPACED 9" a #4 REBAR TRASH RACK AT EACH WAY AND MEET ALL REQUIREMENTS OF STD, SPEC. 310. 4" O.C.E.W. OR APPROVED EQUAL 2. CHAMFER ALL EXPOSED CORNERS 33". 9EET 1 OF t a 310.02 FLARED END SECTION FOR DRIVEWAY CULVERTS , y�PRE NOT TO SCALE 48" RCP SPILLWAY INN 2'-0" Tn,. BARREL 1/2 R CURB AND GUTTER DETAIL NOT TO SCALE EMBANKMENT -- — SEDIMENT FOREBAY - FOREBAY WOR -10' BERM AROUND 4'x4' INNER DIM 5' FOREBAY BERM ALL OF POND FOREBAY RISER RIM ELEV.: 18.4' ELEV.: 14.50' ELEV.: 18.0' TOP OF POND ELEV.: 18.4'_ _ TEMPORARY POOL ELEV.: 16.00' PERMANENT POOL ELEV.: 14.50 \ \\ \ \ , 35 EMERGENCY 52' OF 4$ RCP SPILLWAY ELEV.: 17.50 / CLEANOUT ELEV.: 7.0' 8OTTOMELEV.- 6.0\/\ 48" HOPE APPROXIMATE LENGTH 55' APPROXIMATE LENGTH 30' — r 'NO�leVSo, g110N INV.: 9.50' OUTLET: 8.00' PRE) ask' (5QU BPSE i b SAT 00 , AN AN11FLOA ATION BASE TO HAVE #4 REBARS 0 10" O.C.E.W. W/3" COVER FOREBAY RISER DETAIL NOT TO SCALE -TOP OF SHELF ELEV.: 15.00' -10' VEGETATED SHELF AROUND ALL OF MAIN POND -BOTTOM OF SHELF ELEV.: 14.00' INV.: 8.00' (V TEMPORARY SEEDING GRASS TYPE AMOUNT/ 1000 SF. RYE GRAIN BROWNTOP MILLET 1-2 LBS. 1-2 LBS. PERMANENT SEEDING GRASS TYPE AMOUNT/ 1000 SF. BERMUDA, COMMON 1-2 LBS. FESCUE, TALL (KENTUCKY 31) 5-7 LBS. SERICEA LESPEDEZA (SLOPES) 1-2 LBS. TIME OF INITIAL NiT1AL NOV. THRU JAN. 25 LBS. 10-10-10 -NA- JUNE THRU AUG. 25 LBS. 10-10-10 -NA- TIME OF - SEEDING I INITIAL APR. THRU JUNE 25 LBS. 10-10-10 MARCH - APRIL 12 LBS. 10-10-10 SEPT. THRU OCT. FEB. THRU OCT. 25 LBS. 10-10-10 FEB. - MARCH 12 LBS. 10-10-10 MARCH THRU APR. 25 LBS. 10-10-10 FEB. - MARCH SEEDING SCHEDULE DETAIL NOT TO SCALE SHALLOW WATER: EMERGENT PLANTS BOTANICAL NAME COMMON NAME SIZE SPACING Canna lily 'Bengal Tiger' Canna 1 GAL 36" Iris virginica Blue flag Iris 1 GAL 24" Saururus cernuus Lizard Tail SPRIG 24" SHALLOW LAND: HERBACEOUS PLANTS BOTANICAL NAME COMMON NAME SIZE SPACING Eupatorium fistulosum Joe Pye Weed 1 GAL 36" Hibiscus moscheutus Rose Mallow 1 GAL 36" Lobelia cardinclis Cardinal Flower 4" POT 36" SUBSTITUTIONS ARE ALLOWED DEPENDING ON AVAILABILITY, SUITABILITY, AND AESTHETICS. HOWEVER, ANY SUBSTITUTION MUST BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. LITTORAL SHELF SPECIES LIST FOR MAIN POND M Atli/ nr PSI Im- PLAN FRAME, GRATE & HOOD FERTILIZATION/1000 SF. MAINTENANCE -NA- -NA- FERTILIZATION/1000 SF. MAINTENANCE EACH 4-8 WEEKS 1-2 LBS. N. MAY & DEC. 1/2 TO 1 LB. N. 1/2 TO 1 LB. N. -NA- -NA- AUG. - SEPT. 12 LBS. 10-10-10 SEPT. - OCT. 12 LBS. 10-10-10 -NA- TOP OF POND 18.4' :1 35 -0" 3• 17.50 FMSL CLASS-'B' RIP RAP ENFORCEMENTDEPTH: 18 STONE SIZE: 18" EMERGENCY SPILLWAY DETAIL FILTER FABRIC NOT TO SCALE A. s .� �1 i' SCORE(nP) i } t J. SLOPE 1/4 m ! * 3 t FRAME & GRATE IF REQUIRED VARIES (SEE PLAN) SIDEWALK DETAIL FOOTING (TYP.) NOT TO SCALE 20 FT 1/4"/FT 1/4"/FT 8" ABC RIM ELEVATION AS SPECIFIED � IN PLANS THE EDGE IOFEPAVEMENTLEVATION OF ACCESS ROAD DETAIL (EOP) AT THE CURB INLET NOT TO SCALE f 1 4" ''T I FRAME & GRAT O -- 61) L G s" IF REQUIRE (DIA. + 1 9") MIN DOUBLE GRATE PLAN TOP OF POND 18.4' z SLOPE VARIES (SEE PLAN) 1.5" SF9.58' FOOTING (TYP.)~� PLAN i 2.5" BINDER `v RIM ELEVATION AS SPECIFIED IN �O 8" ABC �Cj� PLANS SECTION X STORAGE PAVEMENT DETAIL z NOT TO SCALE FRAME & GRATE N 00 �1 a_ W LIJ �L OUTFLOW PIPE FOOTING 6" 3'-0" 6" 10 SLOPE VARIES (SEE PLAN) * ' •• 2' SF9.5A PIPE 6" ABC C #4 BARS @ 12"O.C. EACH WAY 1'-4" SECTION Y PARKING PAVEMENT DETAIL 6" #57 WASHED STONE (TYP.) SECTION NOT TO SCALE CURB INLET DETAIL DROP GRATE f CATCH BASIN DETAIL NOT TO SCALE NOT TO SCALE MAIN POND MAIN POND RISER STRUCTURE. SEE TOF OF POND ELEV.: 18.4' DETAIL ON THIS SHEET TEMPORARY POOL ELEV.: 16.00' PERWANENT POOL V.: 14.50' _ SEDIMENT CLEANOUT ELEV.: 7.0' BOTTOM OF POND ELEV.: 6.0' \ /i �• //� /i• /� APPROXIMATE LENGTH 230' STORMWATER POND PATH OF FLOW CROSS—SECTION NOT TO SCALE EMBANKMENT 10' BERM AROUND ALL OF POND: ELEV.: 18.40' 3'•� 35' OF 36 HDPE 5'x8'x6" ANIISEEP/RAP COLLAR ON PIPE /\/\/\/ APRON PIPE CHANNEL OCT 0 � 2010 1 LE<)END �• -•�� EXST. PROPERTY BOUNDARY EXST ADJACENT PROPERTY 21 EXST. MAJOR CONTOUR 20 EXST. MINOR CONTOUR EXST. STORM DRAIN PRO. PAVEMENT PRO. DRAINAGE BASIN <_ PRO. DRAINAGE FLOW PATH _nao PRO. FINISH GRADE SPOT SHOT 21 PRO.CONTOUR PRO. SECURITY FENCE PRO. EASEMENT PRO. CURB EmInEffirw PRO. STORM DRAIN PRO. STORM DRAIN INLET 19 PRO. STORM DRAIN LABEL Cj PRO. FLARED END SECTION PRO. OUTLET PROTECTION °R HAL LIa31 +11� �r° try\J�'M1�.�� • n � `� R. C t OWNER: Hwy 421 Properties, LLC 1508 Military Cutoff Road, Suite 302 Wilmington, NC 28403 Phone: (910) 395-6036 DEVELOPER: McKinley Building Corp. 3807 Peachtree Avenue Suite 200 Wilmington, NC 28403 Phone: (910) 395-6036 Coastal Land Design,PLLC Civil Engineering / Landscape Architecture Land Planning / Construction Management NCBELS Firm License No: P-0369 P.O.Box 1172 Phone: 910-2549333 Wilmington, NC 28402 www.cldeng.00m Fax: 910-254-0502 LAWN : J. CARMINE PROJECT :SIGN : J. CARMINE NUMBER : 650-04 IECK : J. CARMINE SCALE : NOT TO SCALE 'PROVED : J. CARMINE I DATE: 6—JUL-2009 .E NAME Wolseley, N.A. U.S. Hwy 421 Project Stormwater Construction Details JOB NUMBER SHEET NUMBER 650-03 SW-02 StC:0r&"wvat4=,,.r Management Pans for yiv &I=, . Hwy 421 Project New Hanover C:c:punty, North Carolina Coastal Land DesiqnPLLC Civil Engineering / Landscape Architecture Land Planning / Gonstruction Management NCBELS Firm License No: P-0369 P.O. Box 1172 Phone: 910-254-9333 Wilmington, NC 28402 www.cldeng.com Fax: 910-254-0502 SHEET INDEX J ..,.& .►S W-01 PROPOSED STORMWATER MANAGEMENT -- AND GRADING PLAN FOR PHASE -I SW-01A PROPOSED STORMWATER MANAGEMENT OWNER: ��? , (\ . AND GRADING PLAN FOR PHASE -II Hwy 421 Properties, LLC 1508 Military Cutoff Road, Suite 302 Wilmington, NC 28403 Phone: (910) 395-6036 DEVELOPER: McKinley Building Corp. 3807 Peachtree Avenue Suite 200 Wilmington, NC 28403 Phone: (910) 395-6036 LOCA77ON A44P lIE1�YMAIMM C►OUV' t MOM CARCILM NOT -0 SCALE SW-02 STORMWATER CONSTRUCTION DETAILS UPDATED SITE PLAN ON SHEET SW-01. JRC REV ADDED PHASE —II AS SHEET SW-01 A. 4 THERE IS NO OVERALL BUA MODIFICATION OR CHANGE TO DETAIL SHEET. 04/21 /10 REV FIXED TEXT ERROR IN PIPING JRC 3 SCHEDULE BETWEEN JB-4 AND JB-3 01/27/10 ADDED INFILTRATION TRENCH TO TREAT JRC REV RUNOFF FROM THE DOCK PIT AND TRENCH 2 DETAILS TO SHEET SW-01. THERE ARE NO CHANGES TO SHEET SW-02. 01 /06/10 AND SUPPLEMENTAL JRC SHEET SW-01. ACCESS ROAD AND 11/24/09 TO SHEET SW-02. APPROVED NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DIVISION OF WATER QUALITY '<�P �-7-/o -�r _ _ .._ ._-- -- ------------ - f P RAP APRON -- RCP 00.25% - WIDTH t;' _ _ ----- THICKNESS: 12" - ------ - �--------- ' RCP ®0.25%-£L#s5: �. -- -- --- _ - - - _ - - - - - - ---..---.----- - - - ^r tiE �- ___ ___----------- -- 1---------------� - � h 16 -- - \ 15 EIR _-- '46' 18"E"mow- _ - 15- ---- - 1- -- S32_ - -- - - - _ - - - - - - - - - - EIRr1fr, - - 36fi 28'._.- -- - - -- - - - - _ - - _ __- ..�.�.. _- - -- - =1 c:-- - --- -- - -- ES INV • 13 85w-w+� w r r� w�-wr-w -w w w w a ww wwPROPOSED CONCRETEDRfVE-OVER CURB GRAPHIC SCALE � � I � BARRIER CURB ENDS AT 40 0 20 40 80 160 -' CURB INLET-12 it _ - e wwwwwwwiwww 1, �•- -- ( IN FEET) - 1 inch = 40 ft. / PAVEMENT DIRECTIONAL 1 Future Development- \ STRIPING 9 8 3 00 s�f Impervious ' \ _ �v 1 -- Future building must have a FFE of 1- 18.65' or greater and the grade must be i \ raised such that stormwater discharge/ from the developed area does not drain 1 towards the water supply well./All Total Project Built Upon ea Calculation \ \ 1 ' ' drainage mus(be directed tow rds the \ ' OVERALL PROPERTY ARE . forebay or into the pipes stem \ 1 / Total Property Area \ 1 PROJECT BOUNDARY/ / p ' = 614,884 s.f. 1 DRAINAGE BASIN Total Wetland Area = None Total Project Area = 614,884 s.f f( 5' WIDE 16" EARTHEN BEt M IMPERVIOUS AREA: 1 , .1- 00 �. 5'-0" OFF EbP SETBACK ` - _____._ - On-� uildings = 70,365 s.f. I 1- On -Site Streets = None I / On -Site Parking / Storage (Phase -I) = 67,050 s.f. I On -Site Sidewalks = 4,500 s.f. / I O PRIVATE WATER Other On -Site (Dock Pit to Trench) = 6,250 s.f. / { ' 1 / SUPPLY WELL Future On -Site Parking (fo Pond) = 122,700 s.f. �1 EASEMENT Fufllre On- ' - Developments (To Pond) = 123,300 s.f. 1 / -Off-Site = None I ` / Total Impervious = 394,165 s.f. / PROPOSED OVERALL PROJECT DEN�SITY: \ �� WATER WELL / 394,165 s.f. 614,884 s.f (100) = 64.10% 1 ' 1 ELEVATION: �% \ \ INFILTRA�IQN TRENCH 18.6 5' DRAINAGE BASIN. . 1 1 \ NOT INCLqU ED IN EO\BASIN 14' ELEVATION CONTOUR TO BE , FILLED TO AT \ LEAST 14.50' ; 1 \ ♦ b � \%'/ JB-2 .� ♦ � SETBAck� 15 111sliffi 16 ,..: QED18) 18 i ��j�y��)'� lb 17 Q '� ---® a a� ..- f,�• 16----------------- INV - FESI13-32----- 14------- -,�' - - - -- ---S32'47'32"E1- - iwtR - ` - gz FES INV.: 13.62 EI R - - 14- - - - 318 2Ti'- - -- - P_ f �e o P: 7.8 OP: OP: 17.9 f9 • °\° I h J'o 70)*,,- 211 OP: 17,b 1 ' P: 7.6 OP:17. o : 8.3 OC:17.9 7.9OC: 18.1 s.1 0c: is. o`' i RIP RAP APRON ` 1 p OC: 18. 4.. % 0 10 oJ. LENGTH: 8' ' 7�� I 18 Pavement Sc �edule I DG-8 CJys°I°DG-10 WIDTH: 6' PT SF9.SA+6 AB °' EOP:18.15 �I THICKNESS 12" IRGH 4 OC g ' • i B:18.6s i •�J "101 CLASS:>\ B9101 _ °OP 17.4 p� P: 7.4 OP: 1 .8 ' OP: 17.9OP: 17. ©: 7 OC 17.9 7 9 OC 18.3 OC 18. OC: 18.4N rycb 117,17 Mq E 6 _ EOP: 1 . ' : ..:.:..r"',-1 JB-13 18 HP EOP: 18.15 BOC'- t U C14 \ Q�°1� ; 6,- GENERAL NOTES CONTINUED: \ URB TRAN ON TO 1 ! \ 8' #. EQU L P ELEV. 1. THE ROOF DRAINAGE SHALL BE DIRECTED Pavement:Schedule.... IA 1 t \ TOWARDS THE INLETS ON THE NORTH AND 1.50" SF' 9.5B ❑ \ SOUTH SIDE OF THE BUILDING. 2.S" BindOr. ❑ \ I N \ 'St ABC 1 0 2. AI,,L PIPE DRAINAGE EASEMENTS ARE 20' 1�i 11 ' ❑ I 1 I UNLESS OTHERWISE NOTED. o ❑ 10 3. THE � f�RMWATER POND WILL BE PROTECTED FROM SEDIMENT THROUGH AN APPROVED \ EROSION NTROL PLAN UNTIL THE ENTIRE \ \ DRAINAGE B SIN HAS BEEN STABILIZED. E P I 1 , ' Eop:'17.7 { I I 1 4. THE POND WILL BEMUSED AS A SEDIMENT BASIN FG; 17 7 DURING THE CONSTRUCTION OF THIS PROJECT. ILI THE POND IS TO BE CLEANED OUT PRIOR TO USE AS A STORMWATER POND. 1. • / / 5. A SITE PLAN UPDATE MUST BE"SUBMITTED TO b\° NCDENR ONCE THE LAND PLAN F6R THE FUTURE ' DEVELOPMENTS-1 AND -2 HAVE BEEN 1 46 f { / ' \ THESEZTWOTFUTUREAAREAS MUST BEIMPERVIOUSRtALESFOTHAN I: I ,' 1 D I { / 1 123 300SF. L , Proposed Building. 70,365sf j. / 1 1 6. THE S1Tt PLAN FOR THE FUTURE LOT / STORAGE I 1 Minimum FFE -' 18.651 / 1 1 EXPANSIO(� OF 122,700 SF WILL BE �r w T w w w w T w w w w w CONSTRUCTED AS PHASE -I!. HOWEVER, IT IS NOT { { C �c5 PLANNED TO BE CONSTRUCTED AT THE 11M HIGH PT..,.' I- - THIS PERMIT MOQIFICATION. E OF ..:_ ..' vEu.:'17.? ..�� _ FOUR EQUALLY SPACED 1 29'29740" W 64.05' EOP; 11.8 1 I 0 i INLETS OVER DOCK PIT DRAIN 1 7. THE POND AND FCjEt3AY AND INFILTRATION 1 Z i TRENCH ARE TO B \LOCATED IN A STORMWATER ` ` N RIM: 14.6-5\(EACH) 1 / EASEMENT. \ t ' 1 '�� \ \ / 6 TOFINISHED GRADE AT PERIYETER OF BUILDING IS 1 1 , BE AT LEAST 4" BELfSIt\V FINISHED FLOOR - REV UPDATED SITE PLAN WITH NO JRC INF,IL/TRATION TRENCH / \ 1 / , ELEVATION EXCEPT AT THE FRONT ENTRANCE �/ 4 MODIFICATION TO OVERALL BUA (a AiNAGE BA]S1N. NOT y AND AT EXTERIOR DOORST06PS, THE SITE MUST 4/21/1I �7 1 'INCLUDED IN POND 1 ,.� \HAVE POSITIVE DRAINAGE AWAY FROM THE / REV FIXED TEXT ERROR IN PIPING v� BUILDING. JRC r / I BASIN i \/1( \ 44 ; ' � , \ \{ N 3 SCHEDULE BETWEEN JB-4/JB-3 1/27/1( / ' \ ,� , 9. THE INFILTRATION TRENCH SHALL BE INSTAL ED z REV ADDED INFILTRATION TRENCH AND JRC 1 � 0 AND\IMMEDIATELY COVERED WITHIFILTER FA13RIC .OP:17,b: DG"5 1' , A TOP VENT SEDIMENTATION. TH DOCK PIT/ �,.� 2 DETAILS FOR DOCK PIT DRAINAGE 1 6 1 1 1 SHOUL BE PAVED PRIOR TO / 0 FG`17.6 RUNOFF FROM THE REV ADDED ACCESS ROAD AND JRC U G4 TH CONNEC ON / OF THE gCK PIT DRAIN LINE TO THE GRAVEL ACCESS p 1 INFILTRA SYSTEM. ANY SEDI ENTATION I �� 1 SUPPLEMENTAL DIMENSIONS O / ROAD MUST BE 1 •-� ACCUMULA ON MUST BE FLUSH D OR CL NED 11/24/O'. coN;,. , gD ,CROSSING DIRECTED TO THE 1 \ OUT PRIOR 0 THE PROJECT COMPLETION. REV. Ae...oN (12) DOCK PIT INV.: 13.22 POND I i DESCRIPTION REV.BY ,� 1 0 . I I 18) DG-18 INV.: 10.4� i \ 4, \ E", \ I \ j I I (< DATE �: ro SEPARATION = 1.3' / ��� > 1 � � o � I I I REVISIONS EOP 17,9' i C Z ' FG17 9 i -� --- --.! `- - - - - - - - 15 14.5 -------- DOCK PIT DRAIN: 1 o 13 OF 12" PVC @ 0.10% \ 1 ,Cp I 10 12 I STD JU OX FOR � 1 6, l , s 9 � � TRATION YSTEM 6 7 PIPE INV.: \ 1 3' �\ I ( I / 'BOTTOM: 11.20 (2' SUMP) 1' / 13,25W' x 105'L x 1.25'D� �. 52;, L`F. OF i INFILTRATION TRENCH 5 00 \ 48 RCP Main Pond _ _J i - SEE DETAIL 1 p w - I r , 105 OF PERFORATED \INV. 8.O� I j STORMWA_ TER- 113-- - D.R 41�IAGE EASEMENT _ � 12" PIPE Q 07. 1 JUNCTION BOX STORMWATER RIM: 16.0 !�^ 1 I 7 6 ` DRAINAGE EASEMENT IR INV.: 14.45 1 I s l0 9 I E INV.: 13.20 1 11 SEE DETAI : THIS SHEET 3 ' `- - -- 13 14 - _. r - ._ ( I 'ice--ww•..•..•w.w.w - '�w+-w•ww�•w•w.w....w.w .5 -- - - - - --. - - - - - - •- - .r��� wwwww w w w w i� w w Ja �O!! log 06`11 1t'� tl} 1$.�' w w w as w w w a 17 18 8) \ _ - {- �- EI R 35' EMERGENCY \365.70' SPILLWAY 5'x5' OUTER DIM PRECAST CON\C,. N29'32'90"W \ RISER SEE EIR ELEV.: 17.5 BASIN WITH TRASH RACK FROM -316�' F.E.S.- SEE DETAIL #4 BARS AT 4" O.C.E.W AT 35' OF 36" INV.: 14.05' GENERAL NOTES: ELEV.: 14.50'; INVO.: 9.50' HDPE @ 1.00% 1. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING UTILITIES, STD MANHOLE ABOVE AND BELOW GROUND, PRIOR TO CONSTRUCTION. FRAME AND RIM 2. CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS WEIR TO BE 6" RIM: 16.0 GENERATED THROUGH DEMOLITION AND GRUBBING ACTIVITIES. THICK, EXTEND FROM 3. SURVEY AND TOPOGRAPHICAL INFORMATION AS SHOWN ON THESE PLANS WALL TO WALL, AND BE CENTERED IN co HAVE BEEN PROVIDED BY MICHAEL UNDERWOOD AND ASSOCIATES FROM WILMINGTON, NORTH CAROLINA. THE BOX 4. THERE ARE NO WETLANDS ON THIS SITE. 6' INV.:14.45 - 6„ 5. THE DISTURBANCE FOR THIS SITE IS TO BE KEPT TO A MINIMUM. 12" PIPE 12" PIPE 6. ALL DISTURBED AREAS NOT TO BE STABILIZED WITH IMPERVIOUS SURFACE INV.: 13.20 INV.: 13.20 TO BE SEEDED, FERTILIZED, AND MULCHED WITHIN 15 CALENDAR DAYS OF GRADING ACTIVITIES. FOOTING 3 Q 7. ALL STORM DRAIN DEVICES ARE TO PROVIDE POSITIVE DRAINAGE. U rA cv� 8. EROSION AND SEDIMENTATION CONTROL PRACTICES ARE TO BE REMOVED IN THE LOCATION THAT THE STORMWATER SYSTEM IS BEING INSTALLED AT THAT TIME. THE STORMWATER POND IS DESIGNED TO BE USED AS A SEDIMENT BASIN FOR EROSION CONTROL PURPOSES, THE POND MUST BE CLEANED OUT AFTER THE EN11RE DRAINAGE BASIN HAS BEEN STABILIZED #4 BARS ® 12"O.C. AND PRIOR TO USE AS A WET DETENTION BASIN. EACH WAY 9. STORMWATER PUMPS ARE TO BE AVAILABLE FOR OPERATION AND 6" #57 WASHED STONE MAINTENANCE AND EMERGENCY DRAINING OF THE POND AND DOCK PIT. JUNCTION B 0 X WITH WEIR 10. ALL RUNOFF FROM FUTURE DEVELOPMENT MUST BE DIRECTED TO THE DRAINAGE SYSTEM OR TO THE STORMWATER POND FOREBAY. NOT TO SCALE -RIP RAP APRON LENGTH: 18' WIDTH: 10.2' THICKNESS: 18" CLASS: 'B' I - 2, 353.59' N29'32'50"W RIP RAP PRON DISCHARGE SWALE Cc? 0.33%. LENGTH: "6..Q' SEE DETAIL ON SW-02. WIDTH: 2.7' THICKNESS: 12" CLASS: 'A' /\\ \ \CD BOTTOM OF INFILTRATION TRENCH: 13.20 M >/X BOTTOM OF 3 WASHED SAND: 12.95' w c • y !;� o+� 'ui. % 3 - L17 1 i o ,Water ^ )ICFuture De�lo�ment-1 T ' N ''�J;;, >?. C } I \ �6, ` - - - - - - All Staie Tank (or Ap�roved Eq al) / ' f st • ' ' ' 25,000 sf Impervious ( /1 �1 , a J 5" N \ , pervious 15 , 30 9 4 Dlarr:�ter ,19/-8 8 He t To be removed after future co coon t OWNER: 1 3 ' future ublic waters stem. �1b=15.5'� �Hwy 421 Properties, LLC v, Future`bl�ildin must have a FFE of 18�.5' _ i 1 P Y 41 ' v � or greater and the grade must be raised 1 3 � design and location by Athers. �� � ,. 1508 Military Cutoff Road, Suite 302 such that stormwater discharge from the 1 I i Wilmington, NC 28403 ' E MT stormwater pond does not adversely 1 I Phone: (910 395-6036 impact the 1 , / /AFuhu'e I?evelopbnent to Discharge 1 e T p grade or proposed development. � , � Drainage to Existing Permitted DEVELOPER: / / � All drainage must be directed towards the 1 1 �/ ; ' 1?ond as an Off -Site / stormwater piping system. A jacent 1 �� Permtfto SW8 050217 / ' McKinley Building Corp. 20' STORMWATER' - _ 1 3 X / (Not In Project) ' I 3807 Peachtree Avenue Suite 200 EASEMENT 1 / / Wilmington, NC 28403 � 1/ EXISTING WAiER SUP -PLY / WELL FOR i§UILDING,,, / Phone; (910) 395-6036 `'w'�+wwwwwwwwwwwwwwwwwwwwwwww�rww, ; t ' / i \ 7 PROPOSED SPRINKLER / (- /SPRINKL SYSTEM WELL EASEMENT 10'x10' --- _ I / / ELEV.: 5.00' PROPOSED STORM DRAIN EASEMENT KENN _ _ - Coastal Land Desi 10' OFF � OF EXISTING 42" PIPE , � ' �- - � - gn PLLC - _ - - - - -. - - - _.__ - - _ Cml Engineering /Landscape Architecture ,EI R - �� Land Planning / Construction Management \ 8 PIPE - 254.51' NW 2 50 W / s ALE - - - - NCBELS Firm License No: P-0369 =r - - - PROPERTY 222.60' / N29'32'5 - -- - -- - - - _-EIR P.O.Box 1172 Phone: s10-254-9333 INV. 13.03 IN�.� 12.9 - EXISTING / BOUI�lDARY Wilmington, NC2s4o2 www.cideng.com Fax: staz5aoso2 42" F.E.S. ' � ' �' / ////////////1////////////////////// •' '\ /\ X /\ \' ", INFILTRATION SYSTEM CROSS-SE`TION NOT TO SCALE 2'----.! /.STREAM tIM TYPE UNC71ON UNCTION UNCTION UNCTION )OUBLE )OUBLE JNCTION ANGLE ANGLE ANGLE ANGLE ANGLE �Ncn DRAWN : J. CARMINE DESIGN : J. CARMINE CHECK : J. CARMINE APPROVED J. CARMINE FILE NAME PROJECT NUMBER ; 650-04 SCALE: 1" = 40' DATE : 6-JUL-2009 Wolseley, N.A. U. S . Hwy 421 Project Proposed Stormwater Management and Grading Plan for Phase -I 4pq a' JOB NUMBER SHEET NUMBER 650-03 SW-01 �- _____------ - --- - -- - - - - _ - �- \ -------- _-- - - - - -- _ -- -- - ---, ,6-------- - -- -- - _---_ - - - - - _ =--16,15 �la��=� /`� -14- _- - - - - - - - - - ---- -_- EIR 14---- �1S.2T,-- -- --- S32' -- _.------- ___ _ -_�- ----I - 8„E 1 .-------- ,�� ----- _ _ - - --- ._--- _ - ----16-------- f---,__- EiR A `15'.�.�-,�,..� ls. \----1b--�� - ----- 16- - �_ii'~I , �f _= >, - - �15--`-- ------36�28'S32°4618 E ir��rra�rrr�� -------- _ ___ ...- -- -- _._ .- _ ._- -- -- �� �� �� rrrrr ,- -_`- _ _ - --- ------ ` -.- -. _ B _'' I �� - =- - �6---------- I rsrir�ii -. - - - - - - - - - - - - - - - - - - - - - - - - --- ---- - rrr err - - - - - - - - - - - - - -_�- ram♦ - EIR_ -arm - -... .....�,� _ - -- - -- ------------ --17- ..--- - ---------_. __--_ - - - -- - - rt �' 10 FT 1111 10 1 U I I I 111 10 1 1 rrrrrw�rrr-r.rr I 1 - -- i� �j r I ��1 CRAP GRAPHIC SCALE - ( 1 � -an ',` � ,� `1g\ '-8 Phase -I Ex. Parkin '0DG-9 xnG-1U fee sheet SVV-01 1 cu W 160 ea i -- 1 11 18 • 11,------ EOP:18.01 rrrrrrrr�rrr�arrrrrr�M� XCI-12 XCI-11 FG: 18.01 I I> nn" _ l . IN FEET) 1 \ 1 inch = 40 ft. 1 Phase;�I xJs 7 I 1 .Future DeV'e1opment-2 Pha e=II 1 i 1 98,3Wsf Impervious ` I 80 .. Nwy "Expansion J. i_.. Phase -I Ex. I I 1 \ Future building must have a FFE of:. 0 I F ^� 18.65' or greater and the grade must be / I _ ' ::.:.:.. Parking 1 (.::1.:. : , : -I . l 1 raised such that storinwater discharges \`� `. �J- See Sheet \ from the developedarea does not drain .I SW-01 1 1 / \ 1 :I FM FM _ 16----------------- _ �P-----1 -�ei-1A-------S32'47`3.2:_ � r__1 II 16-------------------.�I J IA \ N \ coo \\ ~\ I j towards the water supply well. All \::....: II j i drainage muSf be directed tow rds the PRO. OUTLET PROTECTION forebay or into the pipes stem Nt..- EDP: i77 FG: 17.7 I I Total Project Built Upon Area Calculation OVERALL PROJECT AREA: Total Project Area = 614,884 s.f. Total Wetland Area = None Usable Project Area = 614,884 s.f. IMPERVIOUS AREA: On -Site Buildings (To Pond) = 70,365 s.f. On -Site Streets (To Pond) = None On -Site Parking / Storage (To Pond) = 189,750 s.f. On -Site Sidewalks (To Pond) = 4,500 s.f. Other On -Site (Dock Pit -To Trench) = 6,250s.f. Future On -Site Developments (To Pond) = 123,300 s.f. Off -Site = None Total Impervious = 394,165 s.f. OVERALL PROJECT DENSITY: 394,165 s.f. (100) = 64.10% 614,884 s.f. R# ' DESCRIPTION DATE Y RE VISIONS I ee Sheet SW-01 EDP: 17.9 GENERAL NOTES CONTINUED: I I NIP ` \ \ FG:17.9 `r \ EOPi 18.2 1 ( If I/to 1. THE ROOF DRAINAGE FROM THE NORTH SIDE OF THE BUILDING IS PIPED I I I \ \ESMT FG:18.2 �� v i8 - _ 00 TO INLETS XDG-5 AND XDG-6. THE SOUTH SIDE OF THE BUILDING DRAINS } [ TO JUNCTION BOX XJB-13. -- -- - - I -rr- _ - - i r 1 2. ALL PIPE DRAINAGE EASEMENTS ARE 20 WIDE UNLESS OTHERWISE NOTED. -- � II -II II� I `iIiII= I ! / 111111i111i1111 )f�I(IIII I I IIi IIIiIII'I , I II I.I (/-IIIII III I {II (II J III iII(IIIIIIII +I�I II II IlI I III1I , -IIIIIIiIIi j-II.I(-III(IIi IlI 1I I I IIIIIIIIIl ! II I �_II i1I II1III II II --(1 ,I ' 1,III1IIIi, r .1I1! I I1_ii I-1� I11IIIi1 -I �I i _ - --_-,p_*WwZN�o �__- � . "-i- a_ -..-__ `5-✓-�- i -aa-_= -_���-�- __- .III li I III-_ iIiI1!I III 1III1II I ;. II -II 1( II II I -I =.IIII - 1IIIII!,I I.I I i._1�I1III(!.,.,1II I(I(I, I I ! _�1_I1I II III.II1, I II II )) I I II�I ',II:�( IIII\ , III I1I(. ; _I !! \ r- III`, III II i 1=I'II IIIIIIIII�%,II(I1 ,; II II/�- iIII I1 I i /• rII , -. III-i'I II , III -III !II II II lIIII(IiIII -IIiI'iI'(IIIII - ,-�IIII-I -'II I-`i!(-II� �-I�---- I'I I II - --- -- -_ -_ ---- -_-_-----.---- --.---..- ---7---=1- I-$_.-n- ---..-z =- - --t- - -1----- ----_----] --�.--- -.- - .-------]---- --- --- - - --- -_---- ----- ---- -- -- ---- I --- ,- -_- - ------ 1--- - -- ---- - ---- - II ;�:.;- :..''".-, :�.o: : ,-.:,....$.:.......;...::: �- _.�V� ;-.:.. -:m ...:.:.3.,:..,....., . •..,. I•: . �i:.:..e•:.. .w... ::...-0E./..:.x :.\..p ...:.. .•I;\.I..'. .,....... � ,: .. .1.. : .:_.: .• 7�0T°L ,o -:e�'.�t:: � . I,I11III1 3.. THE STORMWATER RM WATER PO ND WILL BE PROTECTED FRO M SEDIMENT THROUGH AN APPROVED EROSION CONTROL PLAN UNTIL THE ENTRE DRAINAGE6 BASIN HAS BEEN STABILIZED. -------------------1- - - - - - - - - - 7.5 14 - 14. THE POND WILL BE USED AS A SEDIMENT BASIN DURING THE o ° - - - - - - - - - - - - Tank CONSTRUCTION OF THIS PROJECT. THEPOND S TO BE CLEANED OUTOPRIOR TO USE AS A STORMWATER POND.16,\ Phase-III7 - --- 5f >i :Development - A SITE PLAN UPDATE MUST BE SUBMITTED TO NCDENR ONCE THE LAN D!11i ci PPLAN FOR THE FUTURE DEVELOPMENTS-1 AND -2 HAVE BEEN FINALIZE D .uureeveo meat-1 DG-15' THE TOTAL IMPERVIOUS AREA FOR THESE TWO FUTURE AREAS MUST BE 1LESS THAN 123,300SF.O I ansoh 25 000 sf -mpenvious ESMT 6. THE POND AND FOREBAY AND INFILTRATION TRENCH ARE TO BE LOCATED } IN A STORMWATER EAsEMENr.Phase-I Ex. Main Pond Future building must have a HE of 18.65 See Sheet SW_01 or greater and the grade must be raised 7. FINISHED GRADE AT PERIMETER OF BUILDING IS 4 BELOW FINISHEDEQ FLOOR 011 0ELEVATION EXCEPT AT THE FRONT ENTRANCE AND AT EXTERIOR such that stormwater discharge from the DOORSTOOPS. THE SITE MUST HAVE POSITIVE DRAINAGE AWAY FROM THE stormwater pond does not adversely UILING* cq impact the grade or proposed devel8. THE INFILTRATION TRENCH WAS INSTAD AND IMMEDIATELY COVER6 .._ - - - - - - _ ED --------- WITH FILTER FABRIC T0 PREVENT SEDIMENTATION. THE DOCK PIT WASEOP: 181 -_All draina - - - __ - - - - --stwaterINFILTRATION SYSTEM. ANY SEDIMENTATION ACCUMULATION WAS FLUSHED�lg. S�.q FG.18,1 a must be directed toward the PAVED PRIOR TO THE CONNECTION OF THE DOCK PIT DRAIN LINE TO THE 1' i 1I1I 1� � I1 I I AND CLEANED OUT PRIOR TO THE I`_ I\II �I�I l� -_----�_ .�-_I_I } jI�I `i I II I II -I-- _ -_�-_--13--- --------_-__ ______ _ - �� \\! IIiIII ,� II,L�•.�- ��r17 -..-.. �-��.- �--..--....-��i 'cs I�'r Ir/ PROJECT CERTIFCATION. -14.5---------------------- =o♦ 9. THE STORMWATER CERTIFICATION DATED 4/16/2010 BY COASTAL LAND - - - - - - - - - - - - - �i DESIGN, PLLC IS FOR THE EXISTING INFORMATION AS SHOWN ON THIS 17 15 15 I N j / PLAN AND COVERED UNDER THE PERMIT FOR THE SITE DATED 1/28/2010. eyj,` r �rr�trrrarnsrr�rrr�wrrrwarrrrrrr�w�wrrrrrrr��r�rrr�♦, /� - .------_ - - - - - _ - - - - _---- �• _-------- - M --17 18- ----- ----- e --- - - ---------------- ��� ,-----IS t5- ------------ -_----------- __---�- �- 15 EIR \ �365.70' \ N29'32'5( "W EIR 353,59' N29'32'S0"W� \ EIR- 254.51' N219432'S0"W_ / �pROPERTY 222.60' / N29'32'S=ir'� -- - - - - - VTR - --1 -- ----- - --- - ---� \ \ \ - - - \ \ \ \ \ / BOUNDA / / GENERAL NOTES: 1. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING UTILITIES, ABOVE AND BELOW GROUND, PRIOR TO CONSTRUCTION. 2. CONTRACTOR IS RESPONSIBLE FOR DISPOSAL OF ALL WASTE MATERIALS GENERATED THROUGH DEMOLITION AND GRUBBING ACTIVITIES. 3, SURVEY AND TOPOGRAPHICAL INFORMATION AS SHOWN ON THESE PLANS HAVE BEEN PROVIDED BY MICHAEL UNDERWOOD AND ASSOCIATES FROM WILMINGTON, NORTH CAROLINA. 4. THERE ARE NO WETLANDS ON THIS SITE. 5, THE DISTURBANCE FOR THIS SITE IS TO BE KEPT TO A MINIMUM. 6. ALL DISTURBED AREAS NOT TO BE STABILIZED WITH IMPERVIOUS SURFACE TO BE SEEDED, FERTILIZED, AND MULCHED WITHIN 15 CALENDAR DAYS OF GRADING ACTIVITIES. 7. ALL STORM DRAIN DEVICES ARE TO PROVIDE POSITIVE DRAINAGE. 8. EROSION AND SEDIMENTATION CONTROL PRACTICES ARE TO BE REMOVED IN THE LOCATION THAT THE STORMWATER SYSTEM IS BEING INSTALLED AT THAT TIME. THE STORMWATER POND IS DESIGNED TO BE USED AS A SEDIMENT BASIN FOR EROSION CONTROL PURPOSES. THE POND MUST BE CLEANED OUT AFTER THE ENTIRE DRAINAGE BASIN HAS BEEN STABILIZED AND PRIOR TO USE AS A WET DETENTION BASIN. 9. STORMWATER PUMPS ARE TO REMAIN AVAILABLE FOR OPERATION AND MAINTENANCE AND EMERGENCY DRAINING OF THE POND AND DOCK PIT. 10. ALL RUNOFF FROM FUTURE DEVELOPMENT MUST BE DIRECTED TO THE DRAINAGE SYSTEM OR TO THE STORMWATER POND FOREBAY. PROPOSED PHASE -II PIPING SYSTEM U.STREAM BASIN D.STREAM I BASIN PIPE LENGTH PIPE SIZE D.STREAM U.STREAM PIPE PIPE U.STREAM MINIMUM U.STREAM INVERT INVERT SLOPE TYPE RIM BASIN SIZE RIM TYPE CI-14 XJB-13 136' 18" 13.59 14.30 0.52% H.D.P.E. 17.80' 3'-0" x 2'-6" SINGLE DG-15 XJB-4 83, V$ 12.05 12.50 0.54% H.D.P.E. 17.00' 3'-6" SQUARE DOUBLE DG-16 XJB-3 129' 24" 11.91 12.55 0.50% H.D.P.E. 17.10' 3'-0" SQUARE DOUBLE DG-17 DG-16 130' 18" 13.05 13.70 0.50% H.D.P.E. 17.20' 2'-6" SQUARE DOUBLE OWNER: Hwy 421 Properties, LLC 1508 Military Cutoff Road, Suite 302 Wilmington, NC 28403 Phone: (910) 395-6036 DEVELOPER: McKinley Building Corp. 3807 Peachtree Avenue Suite 200 Wilmington, NC 28403 Phone: (910) 395-6036 Coastal Land Design,PLLC Civil Engineering / Landscape Architecture Land Planning / Construction Management NCBELS Firm License No: P-0369 P,O.Box 1172 Phone: 910.254 4= Wilmington, NC28402 www.cldeng.com Fax:910-254-05o2 Wol sel ey, N.A. U.S. Hwy 421 Project Proposed Stormwater Management and Grading Plan for Phase-11 JOB NUMBER SHEET NUMBER 650-03 SW--01 A 36" HDPE SPILLWAY BARREL INVO.: 14.40' FES: 14.05' MAINTENANCE MANHOLE (CENTERED) AST � Act of eok, p�RM o 6 ��,, 13 9Q PQ�`• (SQ��R 14,So, IN E) 5'-0"x5'—O" PRECAST CONCRETE BASIN, OR APPROVED EQUAL, WITH CUTOUTS AND TRASH RACKS INSTALLED ON (2) SIDES AS SHOWN IN THIS DETAIL #4 REBAR TRASH RACK AT 4" O.C.E.W. (TYP, BOTH OPENINGS) OR APPROVED EQUAL 3" PVC SCREW PLUG ELEV.: 16.00' 3" PVC AS NEEDED A y• 1 '�" 3" PVC TEE 3. 23' ANTIF 3" PVC AS NEEDED I�ATq�I 3" INLET SCREEN ON 12" OF 3" PVC INV.: 13.50' eqs� INV.: 14.50 INSIDE OF BOX TO BE SLOPED WITH GROUT TO ENSURE DRAINAGE TO SPILLWAY BARREL MAIN POND RISER D-TAIL 6'-4"x6'-4"x8" ANTIFLOATATION NOT TO SCALE BASE TO HAVE #4 REBARS @ 10" O.C.E.W. W/3" COVER O �__- VARIABLE _ �-mO I DRIVEWAY WIDTH B N CD O AITER gLDpE Q F _ U rm-,Z1=D ppIVEWAY PIPE DRIYEWAY PIPE 0 Ja'=Z = p F Cc,m �TRAILIHG _ . ___--� __ _ ___-- APPROACH W Q Z LL. TZa rc�¢rco� ooTo DRIVEWAY PIPE TYPICAL SECTION ozLLZo� � yi �b 11Efl SLOPE 3" 6: 1 F O 0 0 r <H 6 8,ti �A _ _ CAiTEq SLOPE U'z 6 MAX. �-- - - ----- - 3" -------- - —{. 1 6„ MAX Qo AI B D• P2LLER =-- D JOI B A —` ___ -- - - _ D I -- �'—_ —,= - �I VARIES r I PIPE r3� PIPE__ T L Te�I L_ _I = 'T CV O = 2 O z D GROOVE INSTALLATION TONGUE INSTALLATION r SIDE VIEW m r PIPE R CC v, �Go m y L . Hyoy W c W o b m 9 ----- �. a -n z T LPIPE 'I► W p I Ts Ir- �� E rn END VIEW fi J w `I n PLAN VIEW �Y'/ Cf J LL A Z v Li 4EET 1 OF t 310.02 END TREATMENT DIMENSIONS D L W T, _ Tb Te A B 15" 7' 6" 19" 4" 4" 6" 17444 20%8" 181 --9' 0„ 23„ .4" --- — 4„1 6" 2114„ 25" 24„ 12'-6" 30" 4" 4" I 6" 277t" 32' ISOMETRIC VIEW n I U W NOTES: CL a 9. CONSTRUCT PIPE END SECTION USING qd REBAR SPACED 9" EACH WAY AND MEET ALL REOUIREMENTS OF STD. SPEC. 310. 2. CHAMFER ALL EXPOSED CORNERS 7,1". SHET 1 OF 1 �16.6211 FLARED END SECTION FOR DRIVEWAY CULVERTS NOT TO SCALE CURB AND GUTTER DETAIL NOT TO SCALE 1'2" R EMBANKMENT SEDIMENT FOREBAY FOREBAY WEIR 10' BERM AROUND 4'x4' INNER DIM 5' FOREBAY BERM ALL OF POND FOREBAY RISER RIM ELEV.: 18.0' ELEV.: 18.4' ELEV.: 14.50' _ TOP OF POND ELEV.: 18.4'_ _ — TEMPORARY POOL ELEV.: 16.00' PERMANENT POOL EL V.: 14.50 35EMERGENCY 52' OF 48" RCP SPILLWAY � ELEV.: 17.50' \�\ ' CLEANOUT ELEV.: 7.0'�� \/\/\/�HDPE �N62' PIPE APPROXIMATE LENGTH 55' APPROXIMATE LENGTH 30' — PIPE FLARED END SECTION NOT TO SCALE OR SHAPE ISOMETRIC VIEW DO = PIPE DIA LA = APRON LENGTH W = APRON WIDTH 3 X PIPE 0 MIN D = APRON DEPTH PLAN NOTES: SEE APPROPRIATE SCHEDULE FOR DIMENSIONS 1. LA IS THE LENGTH OF THE RIPRAP APRON. 2. D = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6" 3. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. RIP —RAP AT FLARED END SECTION DETAIL NOT TO SCALE DISCHARGE CHANNEL DETAIL NOT TO SCALE 5'—O"x5'—O" PRECAST CONCRETE BASIN, OR APPROVED EQUAL #4 REBAR TRASH RACK AT 4" O.C.E.W., OR APPROVED EQUAL 48" RCP SPILLWAY BARREL INV.: 9.50' OUTLET: 8.00' lox: AaE) " (50l1 gp5E �pN N A7A 6'-4"x6'-4' x8' ANTIFLOATATION BASE TO 8,33 �FL� P HAVE #4 REBARS ® 10" O.C.E.W. W/3" COVER FOREBAY RISER DETAIL NOT TO SCALE TEMPORARY SEEDING GRASS TYPE AMOUNT/ 1000 SF. RYE GRAIN 1-2 LBS. BROWNTOP MILLET 1-2 LBS. PERMANENT SEEDING GRASS TYPE AMOUNT/ 1000 SF. BERMUDA, COMMON 1-2 LBS. _ — FESCUE, TALL (KENTUCKY 31) 5-7 LBS. SERICEA LESPEDEZA (SLOPES) 1-2 LBS. TIME OF INITIAL NITIAL NOV. THRU JAN. 25 LBS. 10-10-10 —NA— JUNE THRU AUG. 25 LBS. 10-10-10 —NA— TIME OF NITIAL INITIAL APR. THRU JUNE 25 LBS. 10-10-10 MARCH — APRIL 12 LBS. 10-10-10 SEPT. THRU OCT. FEB. THRU OCT. 25 LBS. 10-10—i0 FEB. — MARCH 12 LBS. 10-10-10 MARCH THRU APR. 25 LBS. 10-10-10 FEB. — MARCH SEEDING SCHEDULE DETAIL NOT TO SCALE SHALLOW WATER: EMERGENT PLANTS BOTANICAL NAME COMMON NAME SIZE SPACING Canna lily 'Bengal Tiger' Canna 1 GAL 36" Iris virginica Blue flag Iris 1 GAL 24" Soururus cernuus Lizard Tail SPRIG 24" SHALLOW LAND: HERBACEOUS PLANTS BOTANICAL NAME CO MMON NAME SIZE SPACING Eupatorium fistulosum Joe Pye Weed 1 GAL 36" Hibiscus moscheutus Rose Mallow 1 GAL 36" Lobelia cardinolis Cardinal Flower 4" POT 36" SUBSTITUTIONS ARE ALLOWED DEPENDING ON AVAILABILITY, SUITABILITY, AND AESTHETICS. HOWEVER, ANY SUBSTITUTION MUST BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. LITTORAL SHELF SPECIES LIST / FOR MAIN POND o A nv nr n, rnn PLAN FRAME GRAT FERTILIZATION/1000 SF. MAINTENANCE —NA- -NA— FERTILIZATION/1000 SF. MAINTENANCE EACH 4-8 WEEKS 1-2 LBS. N. MAY & DEC. 1 /2 TO 1 LB. N. 1/2 TO 1 LB. N. —NA- -NA— AUG. — SEPT. 12 LBS. 10-10-10 SEPT. — OCT. 12 LBS. 10-10-10 —NA— TOP OF POND 18.4' 35'-0" 17.50 FM SL CLASS-'B' RIP RAP ENFORCEMENT STONE SIZE: 18" EMERGENCY SPILLWAY DETAIL FILTER FABRIC NOT TO SCALE 1" SCORE(TYP) sLOPE'74��r �` 1 FRAME & GRATE i IF REQUIRED VARIES (SEE PLAN) SIDEWALK DETAIL FOOTING (TYP.) NOT TO SCALE 20 FT 1 /4"/FT 1 /4"/FT 8" ABC E &HOOD RIM ELEVATIO N AS SPECIFIED IN PLANS THE EDGE IOFEPAVEMENT LEVATION OF ACCESS ROAD DETAIL (EOP) AT THE CURB INLET NOT TO SCALE 1 4„ PER FT. FRAME & GRAT' IF REQUIRE 7 0 61, 2'-2„ 6" M a j N SECTION X NI in1 <D� SECTION Y CURB INLET DETAIL NOT TO SCALE FOOTING (TYP.) (DIA- + 1 9") MIN DOUBLE GRATE PLAN J PLAN t RIM ELEVATION AS SPECIFIED IN PLANS STORAGE PAVEMENT DETAIL z NOT TO SCALE FRAME & GRATE — CL UJ V) OUTFLOW PIPE 1--r SLOPE VARIES PARKING PAVEMENT DETAIL NOT TO SCALE FOOTING Iy > U I 04 M #4 BARS ® 12"O.C. EACH WAY 1'-4" (TYP.) 6" #57 WASHED STONE SECTION DROP GRATE Z CATCH BASIN DETAIL NOT TO SCALE JAIN POND �TOP OF SHELF ELEV.: 15.00' MAIN POND RISER 10' VEGETATED SHELF AROUND ALL OF MAIN POND BOTTOM OF SHELF ELEV.: 14.00' STRUCTURE. SEE — — — — TOP OF IOND ELEV.: 18.4' DETAIL ON THIS SHEET TEMPORAW POOL ELEV.: 16.00'� PERMANENT POOL ELEV.: 14.50 INV.: 8.00' SEDIMENT CLEAN OUT ELEV.: 7.0' /'BOTTOM a Xy \// //\//\//\//\// / / / / / / //\// APPROXIilATE LENGTH 230' ��'. �/. /i // STORMWATER POND PATH OF FLOW CROSS—SECTICN NOT TO SCALE PIPE r EMBANKMENT OUTLET 10' BERM AROUND CHANNEL ALL OF POND: ELEV.: 18.40' 3'•� 35' OF 36" HDPE 0.33% INV.: 14.05 , 5COLL " ON PIPE COLLAR ON PIPE / / / � APRON L.EC)EID EXST. PROPERTY BOUNDARY — — — — EXST. ADJACENT PROPERTY 21 EXST. MAJOR CONTOUR 20 EXST. MINOR CONTOUR .ITIL EXST. STORM DRAIN PRO. PAVEMENT MM € Elm r1MM PRO. DRAINAGE BASIN PRO. DRAINAGE FLOW PATH PRO. FINISH GRADE SPOT SHOT 211 PRO. CONTOUR PRO. SECURITY FENCE PRO. EASEMENT PRO.CURB PRO. STORM DRAIN 01 PRO. STORM DRAIN INLET ED PRO. STORM DRAIN LABEL CC PRO. FLARED END SECTION PRO. OUTLET PROTECTION SAL r 1� �3''1. 1;. el" OWNER: Hwy 421 Properties, LLC 1508 Military Cutoff Road, Suite 302 Wilmington, NC 28403 Phone: (910) 395-6036 DEVELOPER: McKinley Building Corp. 3807 Peachtree Avenue Suite 200 Wilmington, NC 28403 Phone: (910) 395-6036 Coastal Lard Design,PLLC Civil Engineering / Landscape Architecture Land Planning / Construction Management NCBELS Firm License No: P-0369 P.O. BOX 1172 Phone: 910-254-9333 Wilmington, NC 28402 www.cideng.00m Fax: 910-254-0502 DRAWN: J. CARMINE PROJECT DESIGN : J. CARMINE 650-04 NUMBER: CHECK J. CARMINE SCALE : NOT TO SCALE APPROVED : J. CARMINE DATE : 6—JUL-2009 FILE NAME : Wolseley, N.A. U.S. Hwy 421 Project Stormwater Construction Details cy� / JOB NUMBER SHEET NUMBER 650-03 SW-02