HomeMy WebLinkAboutSW1220701_Plansheet - Other_20220805 (2)IREBAR/CAP
ELEV: 1009.24
EXISTING
BUILDING
z5F left
SF SF ■ ■
10 10 3- ��i' S SF R A P
■F loom
14 2 SF ■ REBA /C
■ 1014.50 SF ■ ■ ELEV: 1010.61
I� DOUBLE ROW OF SILT /
PHASE 2 LIMITS
FENCE (TYPICAL) OF DISTURBANCE
■'N 1014 `\ , -1.30 ACRES
C%J/ \ ` V\
\ S 00 / \\ `\ \41p PHASE 2 STORM WATER
MANAGEMENT POND
1013 • OUTLET STRUCTURE
/ / `\ \ `\ / � • SKIMMER
V "s�' • BAFFLES
/ / � \ \ / \ `` • FILTER BERM
1012
INLET PROTECTION
/ (TYPICAL) \ \\ \
1011 0 0 0 \ `\ \
/ o
En
o �
/ 1009.7 / / o ° ° ° k 009 1008 .
INLET PROTECTION
(TYPICAL) p7c)
O _ - 1008.
o
- / o
-1008.50 - /
1009.0
PROPOSED
BUILDING
F F = 1009.00
---1012Oil-, 1010 -____ 1009 -
■ ■ ■ ■ _-----1008
loom ■ CONTROL ■
ICORNER
I
II
0
0
i
1007.0
'
I
130
o
�
o
I
'
II
■ BUILDIING
FF= 1007f
(CONTRACTOR TO VERIFY) _
PHASE 2 SEDIMENT AND EROSION CONTROL CONSTRUCTION SEQUENCE
1. ONCE THESE DEVICES HAVE BEEN INSTALLED, THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND NC DEMLR TO HAVE AN ONSITE MEETING TO DETERMINE THAT PHASE I SEDIMENTAND
EROSION CONTROL DEVICES HAVE BEEN INSTALLED ACCORDING TO THE APPROVED PLANS. CONTRACTOR SHALL RECEIVE APPROVAL FROM ENGINEER AND INC DEMLR BEFORE
BEGINNING PHASE 2 SEDIMENTAND EROSION CONTROL.
2. DEVICES INSTALLED IN PHASE 1 SEDIMENTAND EROSION CONTROL SHALL CONTINUE TO BE MAINTAINED DURING PHASE 2.
3. CONTRACTOR WILL ALSO BE RESPONSIBLE FOR RE -INSTALLING POND BAFFLES ACCORDINGLY DURING THE GRADING PROCESS. POND BAFFLES SHALL REMAIN INSTALLED AT ALL TIMES
OF THE GRADING OPERATION. BAFFLES MAY NEED TO BE REPLACED OR RE -INSTALLED PERIODICALLY.
4. RESUME DEMOLITION. ALL DEMOLITION SHALL BE PERFORMED IN ACCORDANCE WITH STATE, LOCAL AND FEDERAL REGULATIONS. MATERIAL SHALL BE HAULED TO AN APPROVED
LANDFILL. CONTRACTOR SHALL SAVE RECEIPTS.
5. CONTINUE GRADING OPERATIONS, MAINTAIN EROSION CONTROL DEVICES AND REPLACE AS NEEDED. PREPARE THE BUILDING PAD AS SOON AS POSSIBLE. INSTALL STORM DRAIN
STRUCTURES AND PIPING AS SOON AS GRADING ALLOWS. PROVIDE INLET PROTECTION AS SHOWN. INSPECT AND REPAIR BMPS AFTER EACH RAINFALL. PROVIDE TEMPORARY DIVERSION
DITCHES DURING CONSTRUCTION TO ROUTE RUNOFF INTO PROPOSED DETENTION BASIN.
6. SITE CONTRACTOR SHALL COORDINATE WITH GENERAL CONTRACTOR FOR BUILDING PAD COMPLETION AND CONSTRUCTION.
7. AS STORM DRAINAGE CONSTRUCTION CONTINUES, TEMPORARY INLET PROTECTION SHALL BE INSTALLED AND MAINTAINED.
8. AS GRADING PROGRESSES, ADDITIONAL/RELOCATION OF PREVIOUSLY INSTALLED SILT FENCE WILL BE NECESSARYAND EXPECTED.
9. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES TO MINIMIZE EROSION. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR CLEAN-UP AND REMOVAL OF ANY SEDIMENT DISCHARGED ONTO ADJACENT PROPERTIES, AND ANY ASSOCIATED DAMAGES. THE CONTRACTOR SHALL MAINTAIN CLOSE
CONTACT WITH THE EROSION CONTROL INSPECTOR SO THAT PERIODIC INSPECTIONS CAN BE PERFORMED PER INC DEMLR REQUIREMENTS.
10. BEGIN BUILDING CONSTRUCTION, UTILITY INSTALLATION, ETC AS SHOWN ON THE PLANS AS GRADING ALLOWS.
11. INSTALL CURB/GUTTER AND AGGREGATE BASE COURSE ON ALL AREAS TO BE PAVED TO STABILIZE. STABILIZE ALL OTHER DENUDED AREAS AS FINISHED GRADE IS ATTAINED.
12. TEMPORARY GRASSING SHALL BE APPLIED TO AREAS THAT WILL BE DORMANT FOR PERIODS LONGER THAN 14 DAYS. EROSION CONTROL BLANKETS SHALL BE APPLIED TO ALL SLOPES AS
NOTED IN THE GENERAL NOTES AS SOON AS FINAL GRADES ARE ACHIEVED IN THOSE AREAS. PERMANENT GRASSING SHALL BE APPLIED TO ALL AREAS AT FINAL GRADE AND IN SEASON AS
INDICATED ON GRASSING NOTES. ALL DENUDED AREAS SHALL BE STABILIZED PER NC DEMLR AND TOWN OF MILLS RIVER REQUIREMENTS.
13. ONCE THESE DEVICES HAVE BEEN INSTALLED, THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND NC DEMLR TO HAVE AN ONSITE MEETING TO DETERMINE THAT PHASE 2 SEDIMENT
AND EROSION CONTROL DEVICES HAVE BEEN INSTALLED ACCORDING TO THE APPROVED PLANS. CONTRACTOR SHALL RECEIVE APPROVAL FROM ENGINEER AND NC DEMLR BEFORE
BEGINNING PHASE 3 SEDIMENTAND EROSION CONTROL.
zq
SEPTIC AREA
SERVES REMNANT PARCEL
DOUBLE ROW OF SILT
FENCE (TYPICAL)
I
I _I
REBAR/C;AP
ELEV: 10104.62
PROPOSED
CONSTRUCTION
EXIT/ENTRANCE
I
I
\I
II
I
I
I
I
I
I
II
11
11
II
-� 11
I
° II
1
I
I
I
II
I
II
II
I
1
I
I
I
I
I
/
/
/
1
I
I
/
/
/
/
I
\
\
I
\
I
I
I
I I,
I
I
I
'
1
/
I
I
I
I
I
I
I
II
\
\
\
I
I
I
I
I
I
1
1
I
\
I
I
1
\
I
I
I
1
\
\
I
I
I
\
\
\
1
I
\
\
\
I
I
1
I
\
\
1
I
\
\\
I
I
I
I
PHASE 3 SEDIMENT AND EROSION CONTROL
CONSTRUCTION SEQUENCE
1. ONCE THESE DEVICES HAVE BEEN INSTALLED, THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND INC DEMLR TO HAVE AN ONSITE MEETING TO
DETERMINE THAT PHASE 2 SEDIMENT AND EROSION CONTROL DEVICES HAVE BEEN INSTALLED ACCORDING TO THE APPROVED PLANS. CONTRACTOR
SHALL RECEIVE APPROVAL FROM ENGINEER AND NC DEMLR BEFORE BEGINNING PHASE 3 SEDIMENTAND EROSION CONTROL.
2. DEVICES INSTALLED IN PREVIOUS PHASES SHALL CONTINUE TO BE MAINTAINED DURING PHASE 3.
3. CONTRACTOR WILL ALSO BE RESPONSIBLE FOR RE -INSTALLING POND BAFFLES ACCORDINGLY DURING THE GRADING PROCESS. POND BAFFLES SHALL
REMAIN INSTALLED AT ALL TIMES OF THE GRADING OPERATION. BAFFLES MAY NEED TO BE REPLACED OR RE -INSTALLED PERIODICALLY.
4. FINALIZE GRADING IN ALL LANDSCAPED/GRASSED AREAS.
5. ESTABLISH PERMANENT VEGETATION (STABILIZATION) TO ALL DISTURBED AREAS AS SOON AS FINISHED GRADES HAVE BEEN ACHIEVED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
ESTABLISHING FINAL STABILIZATION IN ALL DISTURBED AREAS OF THE SITE AT A RATE OF AT LEAST 85% COVERAGE PER 10 SQUARE FEET.
6. FINALIZE BUILDING CONSTRUCTION ACTIVITIES AND APPLY THE ASPHALT SURFACE COURSE, CONCRETE PAVEMENT AND PAVEMENT STRIPING (UPON REASONABLE ALLOWANCE FOR
SURFACE COURSE CURING). INSTALL LANDSCAPING.
7. FINALIZE STORM WATER MANAGEMENT POND
8. THE CONTRACTOR SHALL PROVIDE THE SITE ENGINEER WITH AN AS -BUILT SURVEY (PREPARED BY A LICENSED NORTH CAROLINA SURVEYOR PER NC DEMLR REQUIREMENTS) OF ALL
SITE IMPROVEMENTS WITH DETAILS PROVIDED REGARDING THE UTILITIES AND STORM DRAINAGE INVERTS, SIZES, AND MATERIALS. PLEASE CONTACT THE SITE ENGINEER AT
864-582-0585 TO CONFIRM THE AS -BUILT REQUIREMENTS.
9. UPON REVIEW OF THE AS -BUILT SURVEY INFORMATION, THE SITE ENGINEER SHALL PERFORM AN INSPECTION OF THE ESTABLISHED PERMANENT VEGETATION. UPON APPROVAL, THE
SITE ENGINEER WILL NOTIFY THE NC DEMLR STORM WATER MANAGER. THE SITE ENGINEER WILL NOTIFY THE CONTRACTOR WHEN IT IS ACCEPTABLE TO REMOVE THE PERIMETER
CONTROLS, OR IF NC DEMLR OR TOWN OF MILLS RIVER REQUIRES THE CORRECTION OF ANY DEFICIENCIES.
10. A BUILDING CERTIFICATE OF OCCUPANCY WILL NOT BE GRANTED UNTIL THE FOLLOWING DOCUMENTS/ITEMS ARE PROVIDED: TEMPORARY/PERMANENT STABILIZATION PER NC DEMLR
REQUIREMENTS FOR THE ENTIRE SITE, POND AS-BUILTS FROM A LICENSED SURVEYOR AND ENGINEER'S CERTIFICATION (IF APPLICABLE) AND COMPLETION OF ALL SITE WORK.
11. CONTRACTOR SHALL TAKE INTO CONSIDERATION OF THE TIME NECESSARY INTO THEIR SCHEDULE THE TIME AND WEATHER CONDITIONS REQUIRED TO OBTAIN A STABILIZED SITE
(MEETING REQUIREMENTS) INTO THEIR CONSTRUCTION SCHEDULE TO OBTAIN THE CERTIFICATE OF OCCUPANCY. CONTRACTOR SHALL ACCOUNT FOR TIME FOR ADEQUATE
GERMINATION AND FINAL STABILIZATION AS A PART OF THE CONSTRUCTION SCHEDULE.
12. UPON SATISFACTION OF SITE ENGINEER INSPECTION, THE SITE ENGINEER SHALL FILE THE NOTICE OF TERMINATION, WHICH SHALL CLOSE THE NPDES PERMIT
\ \ 3� 15'
D
1 I
I /1
0' 20' 40' 60'
GRAPHIC SCALE: 1" = 20'-0"
ww ocn >-0
=UQw�~Q(nZ
H- F- U 00 p F- Z p 0
cn=)0 0 vOz�
Q�0 Lu LuNLI
�0OOOZ�LU L_UW
Q zN_v0Lu0ZDw
Dh� w p 0 J O 0- w
0- z Q ~ LU LU w
~0z Lu
0- LLJ z O
ADEPTUS ARCHITECTURE, INC.
121 MANLY STREET
GREEWILLE, SC 21101
864-242-2514
U
a
o
M�;
N O
U
U N
U
co
ZZ
�05
L
L.L
°�
cn 00
c
LU
(V
L °O
CID
.� 00
U 43
n
§ L
c d
UM
co
41
U
A)
O
L
D_
Engineer
JDM
-a7 Ze�v2 2
41
O N
N -
o z
Q
Z
Q �
zJ
LU 0
z
C) O
U) U
z
w 0
U)U)
QO
0- W
Drawn By
CWJ
Date
APRIL 2022
Revisions
A ISSUE FOR PERMIT REVIEW 05.25.22
B REVISED PLANS 07.20.22
Project Number
2273.001
Sheet
EP200