Loading...
HomeMy WebLinkAboutNC0065099_Pictures (Other)_20221017CPI Southport Wastewater Treatment System Closure Update 10-17-2022 The demolition of the CPI Southport Wastewater Treatment System is complete. Attached are pictures taken during the demolition process and after completion of demolition. The only remaining work in the area of the treatment system is final grading. These photographs are presented in support of the request to rescind NPDES Permit NC0065099. Beginning of demolition of the South Basin and the center dividing wall between the North and South basins. Jackhammer punching holes through the basin bottoms Dividing wall demolished, outer wall demo nearing completion, basin bottom breaching in progress Demo of Wastewater Treatment System Equipment Building in progress All basin walls demolished including basin influent and effluent structures and Equipment Building Holes in the basin bottoms Plugged Outfall 003 Pipe