Loading...
HomeMy WebLinkAbout20141013 Ver 1_E-mail - no deck drain confirmation_20141024 Ward, Garcy From:Williams, Paul C Sent:Friday, October 24, 2014 11:23 AM To:Ward, Garcy Cc:Daisey, Greg; Willis, Thomas C Subject:FW: Herford 33 Attachments:image001.jpg; image002.png Garcy, This email confirms that no deck drains will be on this bridge. Thanks, Paul C. Williams, Jr. Environmental Specialist NCDOT Division One 113 Airport Dr., Suite 100 Edenton, NC 27932 252-482-1861 office 252-482-8722 fax 252-333-9812 mobile ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. From: Bob May \[mailto:BMay@wetherilleng.com\] Sent: Monday, August 18, 2014 6:57 AM To: Williams, Paul C Subject: RE: Herford 33 Paul, Per Anne Gamber, WEI Hydro, there no deck drains on Hertford #33. Bob A. May, PE Senior Roadway Engineer 559 Jones Franklin Rd. Suite 164 Raleigh, NC 27606 Office: (919) 851-8077 Fax: (919) 851-8107 1 ATTENTION: The contents of this message, including all attachments, are from Wetherill Engineering, Inc. and are proprietary and confidential to the intended recipient. If you have received this message in error, you are not authorized to read, copy, or manipulate any part of the correspondence or attachments in any manner. Please notify the sender and delete all copies of this message and its attachments immediately. From: Williams, Paul C \[mailto:pcwilliams2@ncdot.gov\] Sent: Friday, August 15, 2014 4:05 PM To: Bob May Subject: RE: Herford 33 These look good. Thanks for eliminating the impacts. Can you verify that this bridge will not have deck drains? The Water Resources rep. will want that. As soon as all of the utilities get straight, I’ll apply for the permits. Paul From: Bob May \[mailto:BMay@wetherilleng.com\] Sent: Tuesday, August 05, 2014 3:50 PM To: Williams, Paul C Cc: Anne Gamber; Abel, John S Subject: FW: Herford 33 Paul, I am forwarding the revised permit drawings and roadway plans for Hertford #33 for your use. Bob A. May, PE Senior Roadway Engineer 559 Jones Franklin Rd. Suite 164 Raleigh, NC 27606 Office: (919) 851-8077 Fax: (919) 851-8107 2 ATTENTION: The contents of this message, including all attachments, are from Wetherill Engineering, Inc. and are proprietary and confidential to the intended recipient. If you have received this message in error, you are not authorized to read, copy, or manipulate any part of the correspondence or attachments in any manner. Please notify the sender and delete all copies of this message and its attachments immediately. From: Anne Gamber Sent: Tuesday, July 29, 2014 6:56 AM To: Bob May Subject: Herford 33 Good Morning Bob, I changed the drainage file to include the changes requested by DWQ and comments from DOT. Attached are the revised permit drawings. When you send them to the division, please include a new plan sheet. When I tried to print a pdf the weights were wrong. Thanks, Anne Gamber, PE, CFM Senior Hydraulic Engineer 559 Jones Franklin Rd. Suite 164 Raleigh, NC 27606 Office (919) 851-8077 Fax (919) 851-8107 Mobile (919) 906-3737 ATTENTION: The contents of this message, including all attachments, are from Wetherill Engineering, Inc. and are proprietary and confidential to the intended recipient. If you have received this message in error, you are not authorized to read, copy, or manipulate any part of the correspondence or attachments in any manner. Please notify the sender and delete all copies of this message and its attachments immediately. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 3