HomeMy WebLinkAboutNCC223507_ESC Approval Submitted_20221012DSin Envelope ID: 2CC-3-1F-8l-FEF2D
�s STA7F
ROY GO4PER
Governor _`�
ELIZABETH S. BISER �, �...n•.
Secretory -. q`, �++^�'�•
BRIAN WRENN NORTH CAROLINA
Director Environmental Quality
September 6, 2022
LETTER OF APPROVAL WITH :MODIFICATIONS
Tim Fury
615 Shoreview Drive
Concord, North Carolina 280.',.)..5
RE: ProjectName: Tim Furr Commercial Building
Project ID: CABAR-.2_.,0.',1.,.'2-089
Acres Approved: 2.00
County: Cabarrus
City: Concord
Location: Hwy 200
River Basin: Yadkin-PeeDee
Stream Classification: Other
SUbmitted By: Bluestone Land Management, PLLC
Date Received by LQS: August 23, 2022
Plan Type: Revised
Dear Mr. Furr:
This office has reviewed the subject erosion and sedimentation control plan. We fi nd the plan to be
acceptable with modifications and hereby issue this letter of Approval with :Vloditications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall expire
three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is
a.
required by Title 15A NCAC 4B .0129.
As of April 1, ?019, all new construction activities are required to complete and submit an electronic
notice of Intent (e__-1N01) farm requesting a Certificate of Coverage (COC} under the NCC010440
Construction General Permit. After the form is reviewed and found to be complete, you will receive a
fink with payment instructions for the $104 annual permit fee. After the fee is processed, youWill
receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted
for this project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.cYov.:"NCG0 1. Please direct questions about
the e�101 form to the Storm�� ater Pro-W.ram staff in the Raleigh central office. If the owner/operator of
this project changes in the future., the new responsible party must obtain a new COG,
Title 15A NCAC 4B .0 1 18(a) and the _,�XGO I permit require that the following documentation be kept
on file at the job site:
I . The approved E&SC plan as well as any approved deviation.
North Carolina Department f Environmental Quality l i4 i n of Energy, Mineral and Resources
WOOF
Mooresville Regfinal office 16 10 East Center Aventle, Suite 10 l Mooresville, North Caroling
�� io4_.19
DuSlin Envelope ID: 6CC3-33-1F--FEF
Letter of Approval with Modifications
Tim Fury
September 6, 202'2.4
Page 2 of .3
?. The NCGO 1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter dives the notice required bv G.S. 1 13A-6I.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, followina the commencement of this project, it
is determined that the erosion and sedimentation control plan is inadequate to meet the requirements
of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113 A-51 through
66). this office may require revisions to the plan and implementation of the revisions to ensure
compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality- laws., regulations, and rules. In addition, local city or county ordinances or rules may also
apply to this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if there
is any change in the information included on the form. In addition, it would be helpful if you notify
this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
Dina byh.
. x f
i%.., Llvwelvn
-enr.,
J ��
Assistant Regional Engineer
Land Quality Section.
Enclosures,: Certificate of Approval
:Modifications Required for
NCGO 1 Fact Sheet
Approval
c: Bluestone Land 'Management, PLLC
Attn: Jonathan Carter
470 forth Broad Street, Suite A
Mooresville. NC Z81 15
North Carolina Department of Environine ntal QL;ality Did ion of Energy, Mineral and lResources
Mooresville Fie gin al 0 ffice 16 10 East Center A venue, Su1te .31 ' vo resville, North Carolina 281
?0 '_ i
DocuSign Envelope ID. 626CCA3A-3A63-41AF-8C4B-FE7F526A8D5B
Letter of Approval with Modifications
Tim Furr
September 6, 2022
Page 3 of 3
iVIODIFICATIONS REQLIRED FORAPPROVAL
Project dame: Tim Furr Commercial Building
Project ID: CABAR-.'202..,'_1_,-089
County: Cabarrus
Reviewed by: Kenny S. Llywelyn
1. Use larger runoff coefficient when calculating peak flow. The submitted value was .4 which
is low range for this part of the stake. Due to soil types and slopes in this region, a value of .55
or greater needs to be used when calculating peak flow.
?. Show all drainage areas within the limits of disturbance LOD).
North Caroll-slia Department of Environmental ualit-r l i A ion of E'nergy, Mineral ral nd Resources
Mooreville Reginal. Office � �
O tc e 1 � tat Center AvenLIC. Stilte 1 Mooresville, 'forth Carolina 281 i 5
0**W 704.66-3-1699