Loading...
HomeMy WebLinkAboutNCC223507_ESC Approval Submitted_20221012DSin Envelope ID: 2CC-3-1F-8l-FEF2D �s STA7F ROY GO4PER Governor _`� ELIZABETH S. BISER �, �...n•. Secretory -. q`, �++^�'�• BRIAN WRENN NORTH CAROLINA Director Environmental Quality September 6, 2022 LETTER OF APPROVAL WITH :MODIFICATIONS Tim Fury 615 Shoreview Drive Concord, North Carolina 280.',.)..5 RE: ProjectName: Tim Furr Commercial Building Project ID: CABAR-.2_.,0.',1.,.'2-089 Acres Approved: 2.00 County: Cabarrus City: Concord Location: Hwy 200 River Basin: Yadkin-PeeDee Stream Classification: Other SUbmitted By: Bluestone Land Management, PLLC Date Received by LQS: August 23, 2022 Plan Type: Revised Dear Mr. Furr: This office has reviewed the subject erosion and sedimentation control plan. We fi nd the plan to be acceptable with modifications and hereby issue this letter of Approval with :Vloditications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is a. required by Title 15A NCAC 4B .0129. As of April 1, ?019, all new construction activities are required to complete and submit an electronic notice of Intent (e__-1N01) farm requesting a Certificate of Coverage (COC} under the NCC010440 Construction General Permit. After the form is reviewed and found to be complete, you will receive a fink with payment instructions for the $104 annual permit fee. After the fee is processed, youWill receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.cYov.:"NCG0 1. Please direct questions about the e�101 form to the Storm�� ater Pro-W.ram staff in the Raleigh central office. If the owner/operator of this project changes in the future., the new responsible party must obtain a new COG, Title 15A NCAC 4B .0 1 18(a) and the _,�XGO I permit require that the following documentation be kept on file at the job site: I . The approved E&SC plan as well as any approved deviation. North Carolina Department f Environmental Quality l i4 i n of Energy, Mineral and Resources WOOF Mooresville Regfinal office 16 10 East Center Aventle, Suite 10 l Mooresville, North Caroling �� io4_.19 DuSlin Envelope ID: 6CC3-33-1F--FEF Letter of Approval with Modifications Tim Fury September 6, 202'2.4 Page 2 of .3 ?. The NCGO 1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter dives the notice required bv G.S. 1 13A-6I.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, followina the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113 A-51 through 66). this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality- laws., regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Dina byh. . x f i%.., Llvwelvn -enr., J �� Assistant Regional Engineer Land Quality Section. Enclosures,: Certificate of Approval :Modifications Required for NCGO 1 Fact Sheet Approval c: Bluestone Land 'Management, PLLC Attn: Jonathan Carter 470 forth Broad Street, Suite A Mooresville. NC Z81 15 North Carolina Department of Environine ntal QL;ality Did ion of Energy, Mineral and lResources Mooresville Fie gin al 0 ffice 16 10 East Center A venue, Su1te .31 ' vo resville, North Carolina 281 ?0 '_ i DocuSign Envelope ID. 626CCA3A-3A63-41AF-8C4B-FE7F526A8D5B Letter of Approval with Modifications Tim Furr September 6, 2022 Page 3 of 3 iVIODIFICATIONS REQLIRED FORAPPROVAL Project dame: Tim Furr Commercial Building Project ID: CABAR-.'202..,'_1_,-089 County: Cabarrus Reviewed by: Kenny S. Llywelyn 1. Use larger runoff coefficient when calculating peak flow. The submitted value was .4 which is low range for this part of the stake. Due to soil types and slopes in this region, a value of .55 or greater needs to be used when calculating peak flow. ?. Show all drainage areas within the limits of disturbance LOD). North Caroll-slia Department of Environmental ualit-r l i A ion of E'nergy, Mineral ral nd Resources Mooreville Reginal. Office � � O tc e 1 � tat Center AvenLIC. Stilte 1 Mooresville, 'forth Carolina 281 i 5 0**W 704.66-3-1699